Permit GopherAlberta and B.C. property, permit and zoning records

8655 Boundary Road, Vancouver

An address in Killarney, Vancouver, zoned M-1B (Industrial). 5 building permits are on file, most recently “Exterior alterations to upgrade EV chargers currently in place at this existing split-isl…” (issued 3 June 2025). The City's 2026 assessed value is $7,891,200.

Zoning
M-1B · Industrial
Neighbourhood
Killarney
Permits on file
5
Assessed value (2026)
$7,891,200
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 8655 Boundary Road, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59152941, 4,198 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
4,198
Households
1,955
Median age
35.2
Median household income (2020)
$95,000
Own their home
58%
Vancouver: 45%
Average household size
2.1
Under 15
14%
65 and over
8%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-06-03 Exterior alterations to upgrade EV chargers currently in place at this existing split-island gas station site. Scope of work: install EV chargers, rework electrical and civil infrastructure. OK for Field Review per City staff: · $375,000
    SIGNATURE SITE SERVICES INC.
    Issued
  2. 2020-03-05 To construct a new single storey gas station containing a deli,a gas bar canopy and an ancillary car wash building. Class 2 cooking (no grease laden vapours) in the deli area. This permit is to replace BP-2019-00085. To be reviewed under the 2019 VBBL. · $7,700,000
    Keller Construction Ltd
    Issued
  3. 2019-07-08 To construct a new fueling station containing electrical, hydrogen, petrol and diesel fuel stations. This site will also contain ancillary retail and car wash. Ensure site meets requirements of Section 4.6 of the VFBL Permit cancelled to be replaced by BP-2019-05440 · $8,855,199
    no contractor listed
    Issued
  4. 2019-03-12 To demolish this existing gas station on this site. "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver."\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $404,800
    Tervita Corporation
    Issued
  5. 2019-01-29 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing gas station on this site. QP is Alex Jang with [name withheld]\t\t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t\t\t\t
    Tervita Corporation
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Killarney

5829 Mckinnon St
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit Front building with three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in rear yard. · Mountainview Enterprises Ltd
2026-10-29
5829 Mckinnon St
To construct a Multiple Dwelling “Multiplex” with a two-storey one-unit rear building with three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in rear yard. · Mountainview Enterprises Ltd
2026-10-29
6907 Rupert St
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces having vehicular access from the lane. 1.\tHRV unit proposed - located in entry closet 2.\tMechanical unit proposed – Exterior component located in courtyard, Interior component located in second floor hallway closet · ANTAIOS CONSTRUCTION & DEVELOPMENT LTD
2026-10-22
Something wrong on this page? Tell us and we'll check it against the City's records.