Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
8605 Laurel St, Vancouver
An address in Marpole, Vancouver, zoned CD-1 (727) (Comprehensive Development). 3 building permits are on file, most recently “To construct a six-storey multiple dwelling residential building, north and south side of…” (issued 14 December 2020). The City's 2026 assessed value is $31,625,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150494, 390 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2020-12-14
To construct a six-storey multiple dwelling residential building, north and south side of the building is connected by exterior walkway, containing a total of 65 secured market rental units, all over two levels of underground parking, having vehicular access from the lane. This permit has been reviewed under the 2014 Vancouver Building By-law (#10908). Reviewed during the 2020 pandemic crisis. STAGED CONSTRUCTION Stage 1 - Excavation and Shoring - issued July 15, 2019 Stage 2 - Foundation to Grade - issued December 19, 2019 Revision 1 - Change of CP (effective May 6, 2020), from Mark Roozbahani to Brian Fraser - issued May 14, 2020 Revision 2 - 1) Add convenience stair between the 2 storage rooms on P2, 2) revise slope of slab at P1 NE corner, 3) P2 columns and foundation adjustments. - issued November 12, 2020 Stage 3 - Full Construction - issued December 14, 2020 Revision 3 - Change of CP from Brian Fraser to Michael Ferber, effective May 3, 2021. - issued July 6, 2021 Revision 4 - Relocation of roof access hatch at the north portion of building. - issued October 22, 2021 Revision 5 - Remove rate-of-rise heat detectors in the exterior passageways on L2 to L6. - issued July 21, 2022 · $9,020,000
no contractor listed Issued -
2019-07-02
To provide demolition of the existing Multiple Dwelling building containing 26 dwelling units on this site. OK for SIPS as per City staff. 75% Recycle Green demo required. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver."\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $250,000
Assertive Excavating & Demolition Ltd Issued -
2019-02-22
To provide Salvage and Abatement of the existing Multiple Dwelling building containing 26 dwelling units on this site. OK for SIPS as per City staff. QP is Steve Sokalski with Xcel Safety Systems Ltd. Note: 75% for demo/deconstruction, as per City staff
Assertive Excavating & Demolition Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Marpole
#352 - 8250 Manitoba St Interior alteration to provide first tenant improvements for a new Wholesale class B (F2) tenant at this industrial building on this site. Ok for field review per City staff: Noteworthy Stationary Supplies · no contractor listed2026-10-30
#426 Landlord improvement for an existing Textile manufacturing shell space in this existing industrial building on this site. Notes: Separate permits will be required for future tenant. Ok for field review per City staff · no contractor listed2026-10-27
670 SW Marine Drive Interior alterations to provide first tenant improvements and a change of use/occupancy for this existing Retail - Shell (Group E) unit for a new Fitness Centre - Class 1 ( Low Occupant Assembly, Group D) tenant in unit 670 SW Marine Drive on the 2nd level of this existing mixed-use building on this site. · Sian Group Investments Inc2026-10-27