Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
8360 Ontario St, Vancouver
An address in Sunset, Vancouver, zoned I-2 (Industrial). 15 building permits are on file, most recently “Unit #103 Interior alterations to change the use from Storage Warehouse with ancillary of…” (issued 27 July 2026). The City's 2026 assessed value for the 29 accounts at this address is $47,661,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153097, 1,252 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-07-27
Unit #103 Interior alterations to change the use from Storage Warehouse with ancillary office to Wholesale Class A with ancillary office and provide first tenant improvements for a new tenant in this existing commercial building on this site. OK for field review by Jamie Z. on July 6, 2026 NOTE: (1) Contractor to have a valid Vancouver Business License or Intermunicipal Business License (2) No shelving permitted over 6', as stated in the plans. · $500
no contractor listed Issued -
2026-02-02
Unit #109 - 8360 Ontario St Interior alterations to provide first tenant improvements and change use from Warehouse Shell (F2) to Food or Beverage Products Manufacturing – Class B (F2) in unit 109 of this existing commercial building on this site. OK for field review by Jamie Z. October 7, 2025 Related Permits: EP-2024-07081: Completed PP-2024-02388: Completed Notes: 1. This permit is reviewed under VBBL 2019. · $10,000
GLOBAL ENERGY ELECTRIC LTD Issued -
2025-10-16
Interior and exterior alteration to provide first tenant improvement and change the use from Shell warehouse with ancillary office, Group F2, to Food or Beverage Products Manufacturing - Class B, with ancillary office, Group F2 for this existing Unit #132 in this existing commercial building. Class 1 cooking for commissary kitchen. Exterior alteration OK per City staff: 1.0. Application is reviewed under VBBL 2019. 2.0. First TI and will not require any upgrades as this brand new building 3 is built per VBBL 2019 · $200,000
no contractor listed Issued -
2025-08-12
Interior alterations to change the use from "Storage Warehouse in conjunction with Office" to "General Office Temporary Sale Center" in this unit #131 in this existing commercial building (Building 3 - 8380 Ontario Street) on this site. As per City staff025 the targeted removal date of the temporary mockup is Dec 31, 2025 unless extended in writing by Director of Planning & District Building Inspection. OK for field review by Jamie Z. Jul 18, 2025 · $156,265
Ledcor Construction Limited Issued -
2025-04-15
#105 Interior alterations to change the use from Warehouse with ancillary Office, Group F2, to Vehicle Dealer with ancillary Office, Group E and provide first tenant improvements this unit #105 in this existing commercial building. Scope of work: new interior wall on the second floor. OK for field review per City staffith universal washroom at the TI application stage per BP-2021-01262 condition. · $20,000
no contractor listed Issued -
2025-02-11
Exterior and interior alterations to provide first tenant improvements to Bakery Products Manufacturing (F2 major occupancy) with ancillary office in this unit #123 in this existing commercial building. Class 4 KNLZ cooking operation. Note: · $450,000
no contractor listed Issued -
2025-01-28
#101 Interior alterations to provide improvements to add racking at this existing storage warehouse unit #101 on the ground floor of this industrial building on this site. Scope of work to install warehouse racking. OK for Field Review per City staff · $23,677
no contractor listed Issued -
2024-11-13
Interior alterations to provide first tenant improvements to this existing Storage Warehouse in conjunction with Office space for a new tenant in this unit #101 at this existing commercial building on this site. Scope of work includes new interior walls, shelving, plumbing lighting electrical, mechanical, millwork, and finishes. Ok for field review as per City staff · $400,000
Reotech Construction Ltd Issued -
2024-09-16
Interior alteration provide first tenant improvements for storage warehouse in conjunction with office shell space in this unit #140 in this existing commercial building (8380 Ontario Street - building 3 south) on this site. the scope of work includes to install racking system. · $10,000
ARPAC Storage Systems Corporation Issued -
2024-05-15
#102 8360 Ontario st Project Description: Interior alterations to add Pallet Racking Installation for vertical storage within the warehouse space at unit #102 in this existing commercial building. · $50,000
no contractor listed Issued -
2024-04-19
To divide the Storage Warehouse in conjunction with General Office unit (#135 - 8380 Ontario St) into 4 units, to be addressed #135, #136, #137, and #138 (one unit per strata lot) and to add interconnecting stairs between the main and 2nd floor in units #136 and #137. Each suite contains 2 levels: 1st Level - storage warehouse and general office ( shell) 2nd Level- general office (shell). It is PROHIBITTED to divide the 2-storey warehouse units with ancillary office at Level 2 into two suites up and down because the 2nd floor is not accessible. The upper storey is permitted to contain only facilities that are also contained on the accessible storey; therefore, an office space at Level 1 shall be provided; refer to 3.8.2.1.(1) (f). · $50,000
no contractor listed Issued -
2024-02-28
Interior alterations to change the use from Storage Warehouse in conjunction with General office to Wholesaling with ancillary office and provide first tenant improvements this unit #102 in this existing commercial building. Scope of work to include: new washroom-shower, hand basin, toilet. New enclosed office, new kitchen millwork, flooring. · $50,000
no contractor listed Issued -
2022-05-13
To raise the grade to achieve 4.6 m. flood construction level and to construct a new noncombustible industrial building (Building 1 - North) containing 11 two-level industrial strata units (shell). Three industrial building are proposed on this site (Building 1, Building 2 and Building 3). Total number of warehouse shell units on this site is 25. NOTE - all units will be provided with universal washroom at the TI application stage. Related to BP-2021-03085 (Building 2) and BP-2021-03086 (Building 3). Each suite in Building 1 - North contains 2 levels: 1st Leve l- warehouse and office space (shell) 2nd Level- ancillary office (shell) NOTE: It is PROHIBITTED to divide the 2-storey warehouse units with ancillary office at Level 2 into two suites up and down, because the second floor is not accessible. The upper storey is permitted to contain only facilities that are also contained on the accessible storey; therefore, an office space at Level 1 shall be provided; refer to 3.8.2.1.(1) (f). Letter of Commitment by the owner is on file. All fees for the entire development on this site applied against this permit. This BP application was processed under the VBBL 2019. Note: All plans and documents for the entire development ( Bldg 1, Bldg 2 & Bldg 3) on this site were uploaded under the main permit - BP-2021-01262. 09-Feb-2022 - Stage I (on Site Grading) issued. 13-May-2022 - Stage II (Full Permit) issued. 23-Mar-2023 ; BP Revision #1 issued. Changes to Buildings 2 and 3 only. Project description updated to reflect reduced number of units in Building 3. Refer to BP-2021-03085 (Building 2) & BP-2021-03086 (Building 3) for detailed description of changes. · $12,000,000
no contractor listed Issued -
2021-10-15
To demolish to grade a storage and scrap metal processing plant with ancillary offices and accessory buildings on this site. Related to Salvage and Abatement permit BP-2021-02225 · $80,000
no contractor listed Issued -
2021-07-27
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing recycling depot. Related to demo permit BP-2021-02223
MWL Demolition Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Sunset
Exterior and interior alterations to remove the unpermitted suites (x2) at this existing single detached house with secondary suite on this inside with lane site. Remove the cover for the deck re: DP-2026-00450 (switched to DB) Structural · no contractor listed2026-11-05
To construct a 2-storey laneway house building ($300,000) with a 10' lane dedication. 1.\tCovenant not required with existing house 2.\tNo Strata Titling permitted 3.\tMechanical unit proposed – Exterior heat pump component located in the middle yard, Interior heat pump component, HRV and HWT located on the main floor mech closet. · Custom Royal Development Ltd2026-11-04
To construct a Multiple Dwelling 'Multiplex' with a 2 unit front building and a 1 unit rear building. With three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in rear yard. · Econoor Concept Homes Ltd2026-11-03