Permit GopherAlberta and B.C. property, permit and zoning records

834 Lillooet St, Vancouver

An address in Hastings-Sunrise, Vancouver, zoned R1-1 (Residential Inclusive). 2 building permits are on file, most recently “Exterior and interior alterations to remove the unpermitted covered awning at the rear pa…” (issued 27 October 2026). The City's 2026 assessed value is $1,648,000.

Zoning
R1-1 · Residential Inclusive
Neighbourhood
Hastings-Sunrise
Permits on file
2
Assessed value (2026)
$1,648,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 834 Lillooet St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153229, 574 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
574
Households
215
Median age
40.4
Median household income (2020)
$84,000
Own their home
67%
Vancouver: 45%
Average household size
2.8
Under 15
15%
65 and over
19%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-10-27 Exterior and interior alterations to remove the unpermitted covered awning at the rear patio and balcony and convert a portion of the crawlspace to habitable area for this existing single detached house on this inside with lane site. · $139,000
    LLANO DEVELOPMENTS INC
    Issued
  2. 2026-03-31 2.0 SA LWH To construct a 2-storey NetZero laneway house building ($500,000.00) with no proposed parking space. **Net Zero** 1.\tCovenant not required with existing house 2.\tNo Strata Titling permitted 3.\tNo external mechanical unit proposed · $500,000
    LLANO DEVELOPMENTS INC
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Hastings-Sunrise

2466 Eton St
To demolish to grade this existing Single Detached House (1927) on this site – declared rental. • This demolition permit also permits abatement work to be completed to WorkSafe standards. • This permit is subject to the Green Demolition Bylaw (11023) with a recycling requirement of 75% of non-hazardous construction materials. Note: Pre-1910 houses will need to salvage a minimum of 3 metric tonnes of wood. Demolition Contractor: GNA Contracting Ltd. (Onkar Singh Kular) QP: Pacific Ark Environmental Consulting Ltd. (Xiaoqiang (David) Yang) ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** · GNA Contracting Ltd
2026-11-05
3464 Oxford St
To construct a Multiple Dwelling “Multiplex” with a two-storey one-unit rear building with two carport parking spaces, having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in the courtyard, Interior component located in each storey · WALFORD HOMES INC.
2026-11-05
3464 Oxford St
To demolish to grade this existing Single Detached House (1932) on this site – declared non rental. • This demolition permit also permits abatement work to be completed to WorkSafe standards. • This permit is subject to the Green Demolition Bylaw (11023) with a recycling requirement of 90% of non-hazardous construction materials. Note: Pre-1910 houses will need to salvage a minimum of 3 metric tonnes of wood. Demolition Contractor: AJAC Construction & Excavation Inc. (Marie Dieno) QP: Coast BC Hazmat Inspections Inc. (Baraa Habash) ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** · Ajac Construction & Excavation Inc
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.