An address in Fairview, Vancouver, zoned CD-1 (59) (Comprehensive Development). 79 building permits are on file, most recently “Ground floor - staff lounge Interior alterations to provide improvements to the existing …” (issued 29 September 2026). The City's 2026 assessed value for the 3 accounts at this address is $444,396,400.

Zoning
CD-1 (59) · Comprehensive Development
Neighbourhood
Fairview
Permits on file
79
Assessed value (2026)
$444,396,400
3 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 818 W 10th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150649, 663 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
663
Households
375
Median age
37.6
Median household income (2020)
$96,000
Own their home
43%
Vancouver: 45%
Average household size
1.7
Under 15
8%
65 and over
16%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-09-29 Ground floor - staff lounge Interior alterations to provide improvements to the existing staff lounge on the ground level of this existing institutional-hospital building. Scope of work: Add 1 new wall to u/s of existing ACT ceiling with new door (punch code access); adding four 7'-0" high pony walls and infilling a wall opening with new wall to match existing. 1 new sprinkler head and 1 new smoke detector. Remove and replace millwork, new storage furniture; adding 5 workstations, 1 sink. Ok for Field Review per City staff · $100,000
    no contractor listed
    Issued
  2. 2026-07-14 Exterior alterations for membrane and structural repairs to parking ramp, bridge and pick up and drop off area of this existing Hospital (Vancouver General Hospital) on this site. · $350,000
    no contractor listed
    Issued
  3. 2026-05-14 Interior alterations to renovate 2 existing endoscopy procedure rooms and to reconfigure adjoining corridor on level G of this existing hospital (VGH) on site. Ok for field review per City staff. · $1,100,000
    no contractor listed
    Issued
  4. 2026-04-30 Interior alterations to provide tenant improvements to the waiting area on the level 1 and level 2 of this existing Hospital- Mental Health Facility (Group B2) building on this site. OK for field review by Jamie Z., March 24, 2026 Revision #1 - Sep 28, 2026 · $390,000
    no contractor listed
    Issued
  5. 2026-04-23 Exterior and interior alterations to upgrade selected mechanical systems in this existing Hospital building (Willow Pavilion of Vancouver General Hospital) on this site. *** Reviewed under the VBBL 2025 *** Revision #1, Oct 7, 2026 - J. Chen - Relocate the access gate to the mechanical equipment to the side. - Extend the concrete pad for accessing gas meter and mechanical equipment. · $2,283,500
    no contractor listed
    Issued
  6. 2026-03-25 Exterior and interior alterations to upgrade the mechanical room in this existing Hospital (Blusson Spinal Cord) Building on this site. Scope of work is limited to the mechanical room in the basement to reconfigure the steam system, relocating the condensate system and installing new exterior exhausts. *** Reviewed under the VBBL 2025 *** · $1,043,700
    no contractor listed
    Issued
  7. 2025-08-26 Interior alterations at 899 W 12th Ave to provide improvements to the existing Pharmacy department in this existing hospital building (Jim Pattison Pavilion) on this site. Scope of work: To install upgraded pharmaceutical equipment including mechanical work to rebalance existing system, and electrical work for power connections. · $285,000
    no contractor listed
    Issued
  8. 2025-07-24 Ground level - PAU (Psychiatric Acute Unit) Interior alterations to provide improvements to the Psychiatric Acute Unit department washrooms on the ground level of this Hospital building at 910 W 10th avenue (Jimmy Patterson- North) Scope of work: change existing office into a washroom / shower combination room; an existing change area into a washroom / shower, and an existing assessment room into an open Respite room and a separate shower room. · $60,000
    no contractor listed
    Issued
  9. 2025-06-16 910 W 10th Av Interior alteration to Emergency Department Radiology Room and Doctor Lounge Area, providing an open acute treatment bay and radiologist reading room on the ground level of this existing Hospital Building (BC Faculty of Medicine & Lab -Jim Patterson Pavilion North building and Jim Pattison Pavilion South building) on this site. Scope of work: Demising and construction of partition walls, millwork, room finishes, plumbing, mechanical, electrical to suit. · $239,000
    no contractor listed
    Issued
  10. 2025-05-27 Interior alteration to provide improvements to the CT scanner room on the ground floor of this existing hospital building on this site. Scope of work: Replacement of existing CT Scanner equipment, minor room finishes updates, millwork modifications, replace hand hygiene sink. Ok for field review as per City staff · $375,000
    WESTERN MEDICAL CANADA INC.
    Issued
  11. 2025-03-20 Renovation to existing Vancouver General Hospital - Jim Pattison South Ground Floor. The project's scope includes redesign of the Interventional Radiography (IR) area, specifically Lithotripsy, Angiography, and Fluoroscopy to enhance patient flow. Work encompasses some existing interior partitions, doors and millwork demolition and construction of new partition walls and millwork to suit the new layout. Construction hoarding to be reviewed on site by the District Building Inspector prior to construction. 2019 VBBL Stage 1 - full construction Revision 1 - CP Transfer from Michael Ferber to Brian Fraser effective Apr.14/25 · $8,000,000
    CDC Construction Ltd
    Issued
  12. 2025-02-13 5th Floor Interior alterations to provide improvement on the 5th level (#500) to the north west wing of this existing hospital building on this site. Scope of work: Demolish existing door, millwork, flooring and partition walls alteration. New countertops and interior finishes, electrical, plumbing and sprinkler work. Okay for Tips as per City staff · $60,000
    no contractor listed
    Issued
  13. 2024-10-25 Interior alterations to provide improvements to RM242A, RM243, and RM 244 at this existing Hospital building (Segal Centre) on this site. OK for DTI per City staff · $40,000
    no contractor listed
    Issued
  14. 2024-08-30 Interior alternations to renovate the imaging Room G811 to accommodate new X-Ray equipment on the level G of this existing Hospital (Jim Pattison Pavilion South) building on this site. · $485,000
    no contractor listed
    Issued
  15. 2024-08-08 Extensive renovations to Level 2 (3rd Storey) of Jimmy Pattison Pavilion at Vancouver General Hospital. Part 11 upgrades reduced to F1, S1, N1 A1 as per City staffon 1 - to add AL-2025-00086 to the scope of work · $127,000,000
    no contractor listed
    Issued
  16. 2024-07-15 910 W 10th Ave Interior alterations to the Diagnostic Treatment unit (DTU) and Acute C treatment zone to expand the Emergency Department on the ground level of this existing Hospital building (BC Faculty of Medicine & Lab -Jim Patterson Pavilion North building) on this site. OK for DTI per City staff · $2,500,000
    no contractor listed
    Issued
  17. 2024-05-15 Interior alterations to provide improvements to the Restaurant Class 1 at this existing Hospital (Jim Pattison Pavilion South) building on this site. Class 5 (ventless) cooking proposed. 2019 VBBL · $1,150,000
    no contractor listed
    Issued
  18. 2024-03-12 Interior alterations to add maglocks on the 7th and 8th floors of this existing Leon Blackmore Pavilion (hospital) building on this site. OK for Field Review per City staff · $60,000
    no contractor listed
    Issued
  19. 2024-01-29 899 W 12th Ave Interior alterations of two existing procedure rooms (52sm approx.) on the ground floor of this existing building on site. Scope of work: Demolish both rooms to the studs, new electrical devices, ceiling and lightings, plumbing fixtures, sprinkler heads relocations, HVAC will be replaced. OK for field review as per City staff · $1,000,000
    no contractor listed
    Issued
  20. 2023-12-19 Interior alterations to renovate the vacated pharmacy area to a 3 beds research unit for novel cancer treatments on the 15th floor of this hospital (VGH - Jim Pattison Pavilion (south building) on this site. OK to Field Review as per City staffosed 4 restored windows from scope of work. The exterior wall to remain as per original. Note: - DBI to determine if the accessible washrooms meets the requirement. - This building is sprinklered. A separate sprinkler permit is required for all related work. · $2,770,000
    no contractor listed
    Issued
  21. 2023-11-21 Interior alterations a sanitary piping replacement for leaking and preventative maintenance on the ground floor interstice space this two existing Hospital buildings (BC Faculty of Medicine & Lab -Jim Patterson Pavilion North building and Jim Pattison Pavilion South building) on this site. Ok for Field Review as per City staff · $1,020,000
    Trotter and Morton Building Technologies Inc
    Issued
  22. 2023-11-03 Suite 2100A - 910 W 10th Ave Interior renovation to suite in existing hospital building. Scope of work to include construction of two partial-height walls, installation of wall-mounted toilet plumbed into existing connection, installation of grab rails, and installation new data ports for telemetry system and sensor for automatic door opener. Ok for DTI per City staffl permits are required. Sched B Arch: Tony Gill [contact removed] Sched B Plumb: Stuart Adamson [contact removed] Sched B Elec: Patrick Krzesinski [contact removed] · $19,500
    no contractor listed
    Issued
  23. 2023-07-19 Interior alterations to provide improvements to the basement level of this existing Hospital (Blusson Spinal Cord Centre) building on this site. Work to relocate a wall between the data room and boiler room. OK for DTI per City staff · $8,000
    Eco-Sol Reinstatement Solutions Inc
    Issued
  24. 2023-06-01 Interior alterations to renovate and replace the existing equipment with new in the medical device reprocessing department in the basement of this existing Hospital building (BC Faculty of Medicine & Lab -Jim Patterson Pavilion North building) on this site. Revision#2 · $2,950,000
    no contractor listed
    Issued
  25. 2023-05-17 3rd floor Interior alterations to provide improvements to replace HVAC chiller equipment on the 3rd floor of this hospital (VGH - Jim Pattison Pavilion (south building) on this site. OK for Field Review per City staff · $1,953,460
    no contractor listed
    Issued
  26. 2023-02-09 Interior alterations only to provide elevator modernization to seven elevators in this existing Leon Blackmore Pavilion (hospital) building with an existing two stage addressable fire alarm system. Main recall level: 1st level Alternate recall level: 3rd level Scope of work: 1. modernization of elevator equipment 2. relays for elevator recall 3. connection of the fire alarm system to provide elevator recall 4. replace fire detector in elevator machine room ***Reviewed under VBBL 2019*** Building Review Branch Notes: - EP-2022-09972 · $3,747,000
    no contractor listed
    Issued
  27. 2023-01-18 Elevator Modernization Interior alterations for an elevator upgrade to elevator 2, 3 & 4 to meet the requirements of B44-CSA in this existing 4-storey hospital building. Scope of works include: - installation of new addressable smoke detectors to initiate emergency recall of the elevators upon actuation in accordance with VBBL Bulletin 2018-004-BU/EL and B44-16. - replace existing elevator fused disconnect switches, existing receptacles in elevator machine room and elevator pit to GFCI type receptacles. - install new exit signs. ******THIS PERMIT HAS BEEN REVIEWED AND ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 ******** Building Review Branch Notes: · $65,000
    no contractor listed
    Issued
  28. 2023-01-04 Jim Pattison Pavilion North - Basement · $9,490,000
    Graham Construction and Engineering LP
    Issued
  29. 2022-12-08 910 W 10th Ave Exterior and interior alterations to provide improvements to the intensive care unit at second level of this Hospital (UBC Faculty of Medicine & Lab - Jim Pattison Pavilion North) building on this site. Work to add two new roof top units. OK for DB per City staff · $21,630,000
    no contractor listed
    Issued
  30. 2022-09-26 Interior alterations to provide improvements to the ground level of this Hospital (UBC Faculty of Medicine & Lab - Jim Pattison Pavilion North) building on this site. Scope of work includes: re&re interior partition walls and t-bar ceiling to suit new layout, convert existing locker rooms into two barrier free washrooms, reconfigure existing staff offices/break area into new locker rooms/break area, electrical, mechanical · $15,700,000
    no contractor listed
    Issued
  31. 2022-04-20 Exterior and interior alterations to renovate the two cath labs in Jim Pattison Pavilion (south building). The scope include to put outdoor condensing units with fencing enclosure (black chain link fencing) facing Laurel Street OK for DB per City staff · $1,600,000
    no contractor listed
    Issued
  32. 2021-11-26 Interior alterations to replace the lab analyzer equipment on lever one of this existing hospital building (UBC Faculty of Medicine & Lab) on this site. Ok for field review per City staff: exempt · $63,000
    no contractor listed
    Issued
  33. 2021-11-05 CT Suite 4 - Interior alterations to CT Suite 4 on the ground floor at 899 W 12th Av (Jim Pattison Pavilion) in this existing Hospital building. Scope of Work includes: alterations to remove door, wall finishes, plumbing fixtures/piping/ducting, flooring, ceiling tiles, lighting, millwork and medical equipment; new finishes such as flooring, wall protection, ceiling tiles, light fixtures, new millwork, door, medical equipment, sink, piping, HVAC and fire stopping. Structural seismic support of new medical equipment. OK for field review as per City staff: ~ Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) ~ Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. No SP required per City staff · $195,000
    no contractor listed
    Issued
  34. 2021-09-24 Interior alterations to the Emergency Department lounge area in the existing Hospital (UBC Faculty of Medicine & Lab - Jim Pattison Pavilion North) building on this site. OK for SIPS per City staff: · $45,000
    no contractor listed
    Issued
  35. 2021-08-18 Interior alterations to replace sanitary mains and fittings in the basement level of this Hospital (UBC Faculty of Medicine & Lab - Jim Pattison Pavillion North) building on this site. OK for Field Review per City staff: - No energy trigger required, replacement of plumbing - This building is sprinklered. DBI to determine on site if separate sprinkler permit is required · $319,900
    no contractor listed
    Issued
  36. 2021-06-29 Interior alterations to add new electric strikes and related devices to existing doors at Level 2 of 803 W12th Avenue in this existing Hospital- Mental Health Facility (Group B2) building on this site. · $63,000
    no contractor listed
    Issued
  37. 2021-05-18 Interior alterations to the Jim Pattison Pavilion South on floors B, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15 and 16 to accommodate a new food service model. No grease laden cooking proposed on site, reheating prepared foods only, K3 has been submitted. To be reviewed under the 2019 VBBL. · $6,405,000
    no contractor listed
    Issued
  38. 2021-05-17 Interior alterations to levels T, G, 5, 8, 9, and 10 in the Leon Blackmore Pavilion (Hospital) to accommodate a new food service delivery model. No cooking proposed, reheating of prepared foods only, K3 provided. To be reviewed under the 2019 VBBL. · $1,737,000
    no contractor listed
    Issued
  39. 2021-04-09 Interior alterations to provide improvements to add a delayed egress locking device (15 seconds) to one of the exit door of the Jim Pattison Pavilion Level 2 on this existing hospital site. Note: This permit is reviewed under VBBL 2019 and issued during health pandemic 2020 and 2021. · $12,000
    PALADIN TECHNOLOGIES INC
    Issued
  40. 2020-12-04 866 W 10th Ave (Laundry Building) Exterior and interior alterations to provide improvements to the Laundry (866 W 10th Ave) hospital building on this site. Work to relocate the clean linen room. Exterior alterations to add a roof top unit. OK for DB per City staffW.Wong, October 16, 2020 · $278,000
    no contractor listed
    Issued
  41. 2020-10-29 #G803 + G814 - Ground Floor Interior alterations to the ground level to two (2) x-ray rooms (G803 & G814) in this existing hospital building. Scope of work includes updates to existing wall, floor and ceiling finishes, new lighting fixtures, and reposition existing ceiling fixtures for X-ray equipment. Building Sprinklered – Sprinkler Permit is required. OK for Field Review per City staff: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) Schedules submitted: · $900,000
    no contractor listed
    Issued
  42. 2020-10-21 Interior alterations to provide improvements to Cathlab 3 on the ground floor of this Vancouver General Hospital (Jim Pattison Pavillion South building) on this site. OK for Field Review per City staff · $1,000,000
    no contractor listed
    Issued
  43. 2020-09-29 Interior alterations to install three (3) totem poles in the atrium space on the ground level lobby of this existing institutional (Jim Pattison Pavillion) building. OK for field review as per City staff: 1. Energy Checklist Exemption for minor alterations per City staff. · $50,000
    no contractor listed
    Issued
  44. 2020-09-04 LEVEL 5 Interior alterations only to provide Voluntary Upgrade for accessibility of the patients with mental issues by replacing the existing doors with new Dutch doors with the existing electromagnetic lock at the two seclusion rooms (Room 543 & 545) on the fifth floor in the Willow Pavilion of Vancouver General Hospital. OK for BP only as per City staff. OK to classify as Voluntary Upgrade as per City staff. ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2014******** Building Review Branch Note: - The project scope is not related to ASHREAE 90.1-2010 so Energy Checklist is waived. - Dutch doors must have minimum 45 FPR. Test result in accordance wtih CAN4-S104-M, "Fire Tests of Door Assemblies" must be submitted to the District Building Inspector. · $20,000
    no contractor listed
    Issued
  45. 2020-07-08 To permit interior alterations to the Vancouver General Hospital. Scope to Include: Upgrades to the Woodsmoke Research Room located on the basement level Room B5. Removing the existing mill-work and storage cabinets in room B5. energy exemption: N/A (BOMA BESt (Path 1)) OK For Field Review per City staff.2020 · $50,000
    no contractor listed
    Issued
  46. 2020-06-16 A voluntary upgrade to the Helipad foam suppression system on the roof level of the Jimmy Pattison pavilion (high rise B2 occupancy) to meet Transport Canada's requirements under CAR 325.47(1). Upgrades include replacement of the foam suppression system on the roof level, replacement of the fire pump in the basement, and a new supply pipe running down exit stair #3. Reviewed under the 2019 VBBL during the 2020 Pandemic. · $900,000
    no contractor listed
    Issued
  47. 2020-05-27 Interior alterations to the 3rd floor hospital office space in this existing Hospital (Blusson Spinal Cord) Building on this site. Scope to include: interior demolition for the removal of interior wall window, interconnecting doors, frame, hardware and receptacle. Infill (insulation & drywall) door and window opening. Relocate and re-use doors, new electrical switch and new sink. OK For Field Review per City staff.2020 Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) · $15,000
    no contractor listed
    Issued
  48. 2020-05-27 Interior and exterior alterations to construct a one storey horizontal addition to expand the MRI ward on the main floor of Blackmore Pavilion at VGH. Reviewed under the 2014 VBBL. Issued during 2020 Pandemic. Revision #1 - To replace the applicant set of drawings that had been lost - accepted May 27/21 · $3,830,000
    no contractor listed
    Issued
  49. 2020-04-23 Level 4th, 5th, 6th, 7th and 8th Interior alterations to provide improvements to the workstation on Level 4th to 8th floor of this existing care hospital building on this site. OK for field review as per City staff; base building built to 90.1-2007 or better. · $375,000
    no contractor listed
    Issued
  50. 2020-04-14 Interior and exterior alterations: Interior and exterior alterations and the expansion of the Pharmacy on the main floor of the Blackmore Pavilion. Exterior alteration includes the new exhaust duct work and new HVAC system to roof. · $3,900,000
    no contractor listed
    Issued
  51. 2019-12-23 To permit interior alterations to this existing building (Jim Pattison Pavillion North) on this existing site. Scope of work : Addition of power and data receptacles at approximately 116 locations within this building on the ground, 1st, and 2nd floors and their related interstitial levels, to facilitate the Clinical + Systems Transformation Project. Any unauthorized work on this site, existing or otherwise, is neither recognized nor approved and may be subject to enforcement action. OK For Field Review per . A.Wroblewski & K.Anderson - November 15, 2019 No Energy Upgrade, Voluntary Upgrade Proposed · $232,000
    CDC Construction Ltd
    Issued
  52. 2019-12-23 To permit interior alterations to this existing building (Jim Pattison Pavillion South) on this existing site. Scope of work : Addition of power and data receptacles at approximately 195 locations within this building, to facilitate the Clinical + Systems Transformation Project. Any unauthorized work on this site, existing or otherwise, is neither recognized nor approved and may be subject to enforcement action. OK For Field Review per . A.Wroblewski & K.Anderson - November 15, 2019 No Energy Upgrade, Voluntary Upgrade Proposed · $390,000
    CDC Construction Ltd
    Issued
  53. 2019-12-23 To permit interior alterations to this existing building (Blackmore Pavilion) on this existing site. Scope of work : Addition of power and data receptacles at approximately 131 locations within this building, to facilitate the Clinical + Systems Transformation Project. Any unauthorized work on this site, existing or otherwise, is neither recognized nor approved and may be subject to enforcement action. OK For Field Review per . A.Wroblewski & K.Anderson - Oct.31.2019 No Energy Upgrade, Voluntary Upgrade Proposed This work has been designed to VBBL 2014. · $262,000
    CDC Construction Ltd
    Issued
  54. 2019-09-20 Interior alteration to provide tenant improvement in the Jim Pattison South portion of this this existing hospital on this site. Okay for field review as per City staff: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) · $373,000
    no contractor listed
    Issued
  55. 2019-07-29 Exterior alterations to provide a surface parking lot containing 6 disability spaces, 1 HandiDart space and 1 Class A Loading space located east of the Blusson (ICORD) Pavillion at Vancouver General Hospital. · $100,000
    Cennco Management And Consulting Ltd
    Issued
  56. 2019-05-24 Interior alterations to provide revised locking arrangement at the south elevation perimeter door at the ground floor of this existing Hospital building (Group B2). Proposed work is located at the Jim Pattison Pavilion (North)- Psychiatric Assessment Unit (PAU) patio access door G164. · $5,000
    no contractor listed
    Issued
  57. 2019-05-03 Ground Floor-899 W 12th Av-Vancouver General Hospital-Jim Pattison Pavilion South Campus (JPS) To permit interior alterations and to provide tenant improvements to this existing transport services office within the Vancouver General Hospital - Jim Pattison Pavilion, South Campus. Scope of work includes the removal of 1 kitchenette and to upgrade the remaining kitchenette. New flooring, paint and replacement of the existing lighting. Small alcove in lobby is being enclosed for cart storage. Related electrical and sprinkler work. TENANT: VGH Transport Services · $140,000
    no contractor listed
    Issued
  58. 2019-03-21 855 W 12th Av - Rm #617- 6th floor (Leon Judah Blackmore Pavilion) Interior alterations to provide improvements to office room #611 (Chart room) on the 6th floor of this existing Hospital building on this site. Scope of work: remove shelving. Add electrical receptacles and data outlet. OK for field review per City staff. · $15,000
    no contractor listed
    Issued
  59. 2018-12-20 14th floor (Leukemia Dept.) Interior alterations to provide improvements to add a double door for the Leukemia Department on the 14th floor of this Vancouver General Hospital (Jim Pattison Pavillion) building on this site. OK for field review per City staff. · $23,000
    no contractor listed
    Issued
  60. 2018-12-07 Interior alterations only to provide elevator modernization to Elevator 10 to 18 located in this existing hospital (Jim Pattison Pavilion South). Scope of work includes installation of new smoke alarms and new exit signs. · $6,000,000
    no contractor listed
    Issued
  61. 2018-11-23 Interior and exterior alteration to provide 16 operating rooms, 40 pre and post operation beds, clinical support rooms, offices, lockers, and education spaces on level 3 in this existing building. A new elevator will be constructed that will operate between Level 2 and Level 3 (elevator shaft is part of a previous permit). Infrastructure work is required for the operating functions which will be provided on the roof. Feeder cables will also need to be run from the existing standby power plant which is located in the basement between the Diamond Centre and Jack Bell building. Phased energy upgrading is permitted , refer to commitment letter attached. Phase #1 - Roof Infrastructure Upgrade - issued 2018 Nov.23 Phase #2 - Full Construction - issued 2018 Dec. 18 rev #1 - Minor interior layout amendment to match SP revision - issued 2020 Apr.06 - COVID 2019 · $45,000,000
    no contractor listed
    Issued
  62. 2018-07-26 855 W 12th Av - Rm #611 - 6th floor (Leon Judah Blackmore Pavilion) Interior alterations to provide improvements to office room #611 on the 6th floor of this existing Hospital building on this site. Scope of work: remove surface mounted backer board with hooks, remove lockset for new key bad, new ceiling tiles, finishes, mechanical and electrical work for Biomed office serving the Thrombosis Clinic TENANT: Vancouver General Hospital · $50,000
    no contractor listed
    Issued
  63. 2018-06-04 Exterior alterations to provide concrete repair at the suspended entrance drive lane to the Jim Pattison Pavilion Building at 899 West 12th Avenue and to the parkade of this existing Hospital Building on this site. Okay for SIPS per City staff: · $40,000
    no contractor listed
    Issued
  64. 2018-05-30 3rd floor - North Interior alterations to provide demolition of partition walls, ceiling, mechanical, and electrical located on level 3, and level 3 Interstitial of Jim Pattison Pavillion North Hospital building. *Demo will be done in 2 stages. OK for SIPS processing as per City staff. · $2,200,000
    PCL CONSTRUCTORS WESTCOAST INC
    Issued
  65. 2018-04-23 3rd floor To provide for the Salvage and Abatement of all hazardous materials located on the 3rd floor of this existing Jim Pattison Pavilion North Hospital Building. Related to the demolition under
    no contractor listed
    Issued
  66. 2018-03-14 To construct a shaft for future new non-firefighters designated elevator serving Level 2 and Level 3. Revision # 1 - To remove Level 3 elevator shaft from the scope of work - approved 2018-09-21 · $1,010,000
    no contractor listed
    Issued
  67. 2018-02-05 899 W 12th Av - Room #G265 Interior alterations to room #G265 on the ground floor of this existing Hospital Building on this site. Scope of work: installation of one dental scanner which is bolted to the wall. · $24,000
    Cennco Management And Consulting Ltd
    Issued
  68. 2017-12-14 G541, G542, G543, G544, G546 & G547 Interior alterations to provide improvements to Rooms G541, G542, G543, G544, G546 & G547 on the ground floor of this existing Hospital Building on this site. OK for field review per City staff. Note: Energy trigger chosen; L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems · $2,106,400
    no contractor listed
    Issued
  69. 2017-09-14 Interior and exterior alterations to provide tenant improvements to Centennial Pavilion Level 2 (north portion), in this existing Vancouver General Hospital Building. Notes: 1. Proposed work includes tenant improvement for the relocation of the Center of Excellence in Simulation Education and Innovation offices and sleeping rooms. Mechanical and plumbing shaft work proposed from Level 4 to Level 1. 2. Exterior alterations include replacement of windows on Level 4 with louvers. · $6,000,000
    no contractor listed
    Issued
  70. 2017-09-14 3rd floor Interior alterations to provide improvements in this existing General Office space on the 3rd floor in this existing Laboratory use (Blusson Spinal Cord Centre) building. Scope of work includes relocating kitchenette and new partition walls. OK for field review as per City staffnergy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $80,000
    no contractor listed
    Issued
  71. 2017-09-11 Interior alterations to the office area of this existing hospital building to provide and new convenience door opening in the northeast portion of the Centennial Pavilion. Ok for field review per City staff · $5,000
    Cennco Management And Consulting Ltd
    Issued
  72. 2017-09-07 Basement and main floor Interior alterations to install CT Scan and create reading room on the ground floor of this existing hospital building. Scope of work includes concrete slab coring on the main floor for new CT Scan machine and installation of a transformer in the electrical room. Electrical, plumbing and sprinkler work. No exterior alterations proposed. TENANT: Vancouver General Hospital OK for field review as per City staff · $651,000
    no contractor listed
    Issued
  73. 2017-07-13 Interior and exterior alteration to extend the existing lobby entrance at Laurel St by approximately 5'2" and to install new lobby entrance doors and vestibule with warm air curtain on the ground floor of this existing institutional (hospital) building on this site. Exterior alterations cleared for DB per City staff · $150,000
    no contractor listed
    Issued
  74. 2017-07-10 Exterior alterations to provide two (2) microwave antennas on the roof of this building. Antennas to be painted light grey. Acceptable for DB per City staff · $10,000
    no contractor listed
    Issued
  75. 2017-05-02 Interior alterations to provide renovation and relocation for UPS Electrical and Support rooms serving existing data centre on Level 3 of this existing Jim Pattison Pavilion North hospital building, and to install new associated rooftop mechanical units. OK for field review as per City staff. Schedules submitted: A/B (Arch) by Knut Boeck, [contact removed] B (Structural) by Dlint Low, Struct.Eng, [contact removed] · $560,000
    no contractor listed
    Issued
  76. 2017-04-12 910 W 10th Ave - Emergency Room Area. Interior alterations to three washrooms in the emergency room on the ground floor of this existing institutional (Vancouver General Hospital) building on this site OK for field review per City staff. · $150,000
    no contractor listed
    Issued
  77. 2017-04-05 (Lvls 1-3) Interior alterations to this existing VGH JPP (Jim Pattison Pavillon - South Podium) Hospital building in conjunction with replacing the domestic water distribution piping mains, including firestopping and repairing walls and ceilings, with a new parallel horizontal piping distribution system in three areas: Level 3 Mechanical Room, Level 2 Interstice, and Level 1 Interstice at this existing Hospital building site. OK for SIPS processing as per City staff. · $1,084,110
    Trotter and Morton Building Technologies Inc
    Issued
  78. 2017-03-15 To install magnetic locks to doors enclosing the staff lobby and corridor area for patient control to establish impeded egress zones for on the 10th floor of this existing hospital. Note: all locking devices are programmed to release on 2nd stage fire alarm. · $15,000
    no contractor listed
    Issued
  79. 2017-02-16 Exterior alterations to replace canopy flashing and new white soffit, replace canopy lighting and to provide improvements to the existing entrance lobby (855 W 12th Av Centennial Pavillion) of this existing hospital building on this site. OK for DB per City staff Energy upgrade: L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems Special sprinkler (no work): IA-2016-03645 · $300,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Fairview

1126 W 13TH Av
To replace the structural posts in the front covered area of this existing multiple dwelling building. OK to process as DTI as per City staff · no contractor listed
2026-11-05
1401 W 8TH Av
#300-1401 W 8th Avenue Interior alterations to provide tenant improvements to this existing Radio Communication Station to add one meeting room within unit #300 on the 3rd level of this existing commercial building on this site. Okay for FR as per City staff · Multigroup Enterprise Corp
2026-11-05
1650 W 1ST Av
Exterior alterations for targeted building envelope repairs to the south roof deck membrane in this existing multiple dwelling building on this site. The scope includes to remove and replace the sanitary piping on this roof deck. Ok for Field review per City staff · no contractor listed
2026-11-04
Something wrong on this page? Tell us and we'll check it against the City's records.