Permit GopherAlberta and B.C. property, permit and zoning records

810 Evans Av, Vancouver

An address in Strathcona, Vancouver, zoned I-2 (Industrial). 3 building permits are on file, most recently “Interior alteration to provide tenant improvements to the shell spaces on Levels 2 and 3 …” (issued 15 November 2023). The City's 2026 assessed value is $74,088,000.

Zoning
I-2 · Industrial
Neighbourhood
Strathcona
Permits on file
3
Assessed value (2026)
$74,088,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 810 Evans Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150751, 708 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
708
Households
345
Median age
44.8
Median household income (2020)
$46,800
Own their home
36%
Vancouver: 45%
Average household size
1.8
Under 15
8%
65 and over
22%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2023-11-15 Interior alteration to provide tenant improvements to the shell spaces on Levels 2 and 3 of this 3-storey industrial building for chemical manufacturing, laboratory & office uses. No DP is required per City staffof VBBL 2019.* **This permit has been issued on condition that the CP will follow up and submit a building permit revision to address all outstanding issues around the airlock vestibules and confirm the scope of work in large rooms currently shown as empty spaces.** Refer to BP-2021-05846 for the base building. · $43,000,000
    Bird Construction Group
    Issued
  2. 2023-07-04 To construct a 3-storey building consisting of: 1st Storey - 1 level of parking accessed from street 2nd Storey - Chemical Manufacturing, Laboratory and Office (Shell only) 3rd Storey - Chemical Manufacturing, Laboratory and Office (Shell only) *This permit has been reviewed under the provisions of VBBL 2019.* STAGED CONSTRUCTION STAGE I: Excavation & Shoring (including pile related work only) Issued: Oct. 4, 2022 (S.Yoo) STAGE II: Foundation up to Level 1 [Note: Details not applicable to this stage of construction have been crossed out by red 'X' marks on the permit drawings.] Issued: Mar. 3, 2023 (S.Yoo) STAGE III: Full Structure (Structural only) Issued: Apr. 18, 2023 (S.Yoo) STAGE IV: Full Construction Issued: Jul. 4, 2023 (S.Yoo) · $37,000,000
    Bird Construction Group
    Issued
  3. 2022-08-08 Exterior alterations to permit, installation of temporary power, the erosion sediment control system including wheel wash and silt fence, removal of the existing fence, demolition of the existing concrete on site and to de-grub/remove vegetation on this existing site. This permit allows on site mobilization, and to perform some site clearing and installation of the Erosion and Sediment Control (ESC) system. Any additional work beyond the above must be approved by the Chief Building Official. Refer to BP-2021-05846 for Environmental Protection clearance of the proposed ESC system on June, 29, 2022 and related fees.
    Bird Construction Group
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Strathcona

208 E Georgia St
Exterior and interior alterations to reduce the number of Single Room Accommodation (SRA) rooms from 71 to 50 and provide housing and recovery support services (Group C) on floors 2 to 4 in this existing mixed used protected heritage building on this site. Proposed work includes addition of a new covered roof top patio. Roof deck to be sprinklered to NFPA 13 requirements. Mechanical Review Notes: - Class 2 Cooking Operation (Steam and Heat Removal) is proposed on Level 3. - A metal sign shall be posted on the Type 2 hood, "Cooking causing grease-laden vapours is not allowed Exhaust system is designed for steam and heat removal only". · no contractor listed
2026-10-26
222 Main St
Exterior and interior alterations to provide dedicated egress paths for the residential levels in this existing mixed-use (residential/community courts) building on this site. The scope includes adding a new exterior landing and stairs for the path through Stair 1B to exit to Powell Street, and adding a door for the path through 3A to exit through enclosed patio to E Cordova St. *** Reviewed under the VBBL 2025 *** · VANDELAY VENTURES LTD.
2026-10-21
418 Alexander St
To demolish this existing 2 storey commercial building. This demolition permit also permits abatement work to be completed to WorkSafe standards. This demolition was reviewed under VBBL 2025. Demolition contractor - Division 2 Contracting Ltd - Division 2 Contracting Ltd - [name withheld] · Division 2 Contracting Ltd
2026-10-16
Something wrong on this page? Tell us and we'll check it against the City's records.