Permit GopherAlberta and B.C. property, permit and zoning records

8030 Oak St, Vancouver

An address in Marpole, Vancouver, zoned CD-1 (773) (Comprehensive Development). 16 building permits are on file, most recently “To construct a six storey residential building (Block C - South) containing 38 dwelling u…” (issued 8 December 2022). The City's 2026 assessed value for the 133 accounts at this address is $48,134,000.

Zoning
CD-1 (773) · Comprehensive Development
Neighbourhood
Marpole
Permits on file
16
Assessed value (2026)
$48,134,000
133 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 8030 Oak St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153279, 500 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
500
Households
160
Median age
45.2
Median household income (2020)
$93,000
Own their home
81%
Vancouver: 45%
Average household size
2.9
Under 15
12%
65 and over
21%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2022-12-08 To construct a six storey residential building (Block C - South) containing 38 dwelling units. Refer to BP-2019-04181 for the site work, below-grade facilities, and common underground parking. VBBL - 2014 - Reviewed during 2020 pandemic.
    no contractor listed
    Issued
  2. 2022-12-08 To construct a seven-storey (six residential levels on top of a parkade) building (Block B - In the Middle) containing 47 dwelling units. Refer to BP-2019-04181 for the site work, below-grade facilities, and common underground parking. VBBL - 2014 - Reviewed during 2020 pandemic. Rev. 1 - (Jan. 3rd, 2023) - changes to the Specific Location from Building 7 to 2 (MIDDLE) for Addressing Group.
    no contractor listed
    Issued
  3. 2022-12-08 To construct a seven-storey (six residential levels on top of a parkade) building (Block A - North) containing 47 dwelling units. Refer to BP-2019-04181 for the site work, below-grade facilities, and common underground parking. VBBL - 2014 - Reviewed during 2020 pandemic. Stage Construction
    no contractor listed
    Issued
  4. 2022-02-25 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. Ok for SIPs per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $16,000
    MVP Group Recycle Limited
    Issued
  5. 2022-02-25 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. Ok for SIPs per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $16,000
    MVP Group Recycle Limited
    Issued
  6. 2022-02-22 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. Ok for SIPs per City staff "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $16,000
    MVP Group Recycle Limited
    Issued
  7. 2022-02-22 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. Ok for SIPs per City staff "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $16,000
    MVP Group Recycle Limited
    Issued
  8. 2022-02-22 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. Ok for SIPs per City staff "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $16,000
    MVP Group Recycle Limited
    Issued
  9. 2022-02-22 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. Ok for SIPs per City staff "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $16,000
    MVP Group Recycle Limited
    Issued
  10. 2022-02-15 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. Recycling requirement 75% Ok for SIPs per City staff: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $16,000
    MVP Group Recycle Limited
    Issued
  11. 2021-12-24 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. QP is Ramin Hamidnejad of Kinetic OHS Services Ltd. OK for SIPs per City staff: This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
    Dryland Excavating Ltd
    Issued
  12. 2021-12-23 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. QP is Ramin Hamidnejad of Kinetic OHS Services Ltd. OK for SIPs per City staff: This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
    Dryland Excavating Ltd
    Issued
  13. 2021-12-23 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. QP is Ramin Hamidnejad of Kinetic OHS Services Ltd. OK for SIPs per City staff: This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
    no contractor listed
    Issued
  14. 2021-12-23 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. QP is Ramin Hamidnejad of Kinetic OHS Services Ltd. OK for SIPs per City staff: This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
    no contractor listed
    Issued
  15. 2021-12-23 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. QP is Ramin Hamidnejad of Kinetic OHS Services Ltd. OK for SIPs per City staff: This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
    no contractor listed
    Issued
  16. 2021-12-23 To construct 132 market residential units on a seven-storey building site consisting of three, six residential levels, non-combustible buildings on top of a common, two-level parkade. This is not a high building based on the average grade. VBBL2014 - NFPA 13 Bldg. A - North (7-storey) under BP-2021-02627 Bldg. B - Middle (7-storey) under BP-2021-02628 Bldg. C - South (6-storey) under BP-2021-02629 Stage I - Excavation and shoring issued on Dec.23/21 Stage I - Rev. #1 - Excavation and Shoring changes issued on Mar. 2, 2022. (subsequent change notice was required for this Revision; there is no change to the issue date.) Stage 2 - Full Construction issued on Dec. 8, 2022. Revision #2 - (May 4, 2023) A change in Mechanical Eng. from the outgoing, Omar Milli, dated Mar 3rd, 2023 to the incoming Goran Ostojic dated Mar. 3, 2023. Stage 1 - Revision #3 - (Aug. 30, 2023) - Revised Shoring plans related to a crack located at the lane. · $48,090,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Marpole

8188 Manitoba St
#352 - 8250 Manitoba St Interior alteration to provide first tenant improvements for a new Wholesale class B (F2) tenant at this industrial building on this site. Ok for field review per City staff: Noteworthy Stationary Supplies · no contractor listed
2026-10-30
8188 Manitoba St
#426 Landlord improvement for an existing Textile manufacturing shell space in this existing industrial building on this site. Notes: Separate permits will be required for future tenant. Ok for field review per City staff · no contractor listed
2026-10-27
8433 Ash St
670 SW Marine Drive Interior alterations to provide first tenant improvements and a change of use/occupancy for this existing Retail - Shell (Group E) unit for a new Fitness Centre - Class 1 ( Low Occupant Assembly, Group D) tenant in unit 670 SW Marine Drive on the 2nd level of this existing mixed-use building on this site. · Sian Group Investments Inc
2026-10-27
Something wrong on this page? Tell us and we'll check it against the City's records.