Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
788 W 13th Av, Vancouver
An address in Fairview, Vancouver, zoned CD-1 (655) (Comprehensive Development). 17 building permits are on file, most recently “To construct a 6 storey wood frame residential building (Heather Place Building B) consis…” (issued 12 June 2023). The City's 2026 assessed value is $17,798,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150651, 421 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2023-06-12
To construct a 6 storey wood frame residential building (Heather Place Building B) consisting of 87 affordable rental dwelling units and a day care unit (Group C) for 8 or less children at the 1 st floor, all over one level of underground parking, as approved under the DPMA DP-2021-00881. Note: This 6 storey Heather Place Building B is part of a larger development approved under the DE418891. The developer decided to split the work into two Phases: - Phase I includes only Building B - Phase II incudes only Building C. Building B and Building C share common entrance to underground parkade connected via a vehicle opening at the imaginary line separating Phase I and Phase II. Building B and Building C will operate under the same ownership and cannot be stratified due to shared sanitary lines and water lines between the two buildings. Note: This is a combustible building constructed to 3.2.2.50 requirements per VBBL 2019. The childcare facility on the first floor is allowed to accommodate only 8 (eight) children in order to be considered group C major occupancy and to allow combustible construction. Any increase of capacity of the child care would classify this facility as A-2 major occupancy, and will require the child care to be separated by a fire separation with at least a 2 hr. fire-resistance rating constructed of concrete, masonry, or encapsulated mass timber. 12-June-2023 - Full Construction Stage issued. REVISIONS: 13-Oct-2023 - Rev#1 issued. Changes to shoring arrangement to south wall. 01-Dec-2023 - Rev#2 issued. Building Permit Amendment to address sanitary upsizing for the project. 29-May-2025 - Rev#3 issued. Building Permit Amendment to address civil, water, sanitary, storm changes. Mechanical and Civil Change Letters on file. · $39,500,000
no contractor listed Issued -
2022-11-29
To demolish the existing multiple dwelling building, including underground parking lot and basement. Scope of work includes temporary shoring of the remaining foundation only for the proposed development, subject to conditions listed in the Letter of Agreement dated November 15, 2022. REVISION #1: To change the QP from Arcose Consulting to R.J. Associates Environmental Consulting - B.Wong - Jan 13/23 REVISION #2: · $56,250
MWL Demolition Ltd Issued -
2022-11-29
To demolish the existing multiple dwelling building, including underground parking lot and basement. Scope of work includes temporary shoring of the remaining foundation only for the proposed development, subject to conditions listed in the Letter of Agreement dated November 15, 2022. REVISION #1: To change the QP from Arcose Consulting to R.J. Associates Environmental Consulting - B.Wong - Jan 13/23 REVISION #2: · $56,250
MWL Demolition Ltd Issued -
2022-11-29
To demolish the existing multiple dwelling building, including underground parking lot and basement. Scope of work includes temporary shoring of the remaining foundation only for the proposed development, subject to conditions listed in the Letter of Agreement dated November 15, 2022. REVISION #1: To change the QP from Arcose Consulting to R.J. Associates Environmental Consulting - B.Wong - Jan 13/23 REVISION #2: · $56,250
MWL Demolition Ltd Issued -
2022-11-29
To demolish the existing multiple dwelling building, including underground parking lot and basement. Scope of work includes temporary shoring of the remaining foundation only for the proposed development, subject to conditions listed in the Letter of Agreement dated November 15, 2022. REVISION #1: To change the QP from Arcose Consulting to R.J. Associates Environmental Consulting - B.Wong - Jan 13/23 REVISION #2: · $56,250
MWL Demolition Ltd Issued -
2022-11-29
To demolish the existing multiple dwelling building, including underground parking lot and basement. Scope of work includes temporary shoring of the remaining foundation only for the proposed development, subject to conditions listed in the Letter of Agreement dated November 15, 2022. REVISION #1: To change the QP from Arcose Consulting to R.J. Associates Environmental Consulting - B.Wong - Jan 13/23 REVISION #2: · $56,250
MWL Demolition Ltd Issued -
2022-11-29
To demolish the existing multiple dwelling building, including underground parking lot and basement. Scope of work includes temporary shoring of the remaining foundation only for the proposed development, subject to conditions listed in the Letter of Agreement dated November 15, 2022. REVISION #1: To change the QP from Arcose Consulting to R.J. Associates Environmental Consulting - B.Wong - Jan 13/23 REVISION #2: · $56,250
MWL Demolition Ltd Issued -
2022-11-29
To demolish the existing multiple dwelling building, including underground parking lot and basement. Scope of work includes temporary shoring of the remaining foundation only for the proposed development, subject to conditions listed in the Letter of Agreement dated November 15, 2022. REVISION #1: To change the QP from Arcose Consulting to R.J. Associates Environmental Consulting - B.Wong - Jan 13/23 REVISION #2: · $56,250
MWL Demolition Ltd Issued -
2022-11-29
To demolish the existing multiple dwelling building, including underground parking lot and basement. Scope of work includes temporary shoring of the remaining foundation only for the proposed development, subject to conditions listed in the Letter of Agreement dated November 15, 2022. REVISION #1: To change the QP from Arcose Consulting to R.J. Associates Environmental Consulting - B.Wong - Jan 13/23 REVISION #2: · $56,250
MWL Demolition Ltd Issued -
2021-12-21
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. QP is Terence Tang of Arcose Consulting Ltd.
MWL Demolition Ltd Issued -
2021-11-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing multiple dwelling building. QP is Terence Tang of Arcose Consulting Ltd.
MWL Demolition Ltd Issued -
2021-11-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing multiple dwelling building. QP is Terence Tang of Arcose Consulting Ltd.
MWL Demolition Ltd Issued -
2021-11-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing multiple dwelling building. QP is Terence Tang of Arcose Consulting Ltd.
MWL Demolition Ltd Issued -
2021-11-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing multiple dwelling building. QP is Terence Tang of Arcose Consulting Ltd.
MWL Demolition Ltd Issued -
2021-11-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing multiple dwelling building. QP is Terence Tang of Arcose Consulting Ltd.
MWL Demolition Ltd Issued -
2021-11-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing multiple dwelling building. QP is Terence Tang of Arcose Consulting Ltd.
MWL Demolition Ltd Issued -
2021-11-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing multiple dwelling building. QP is Terence Tang of Arcose Consulting Ltd.
MWL Demolition Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Fairview
To replace the structural posts in the front covered area of this existing multiple dwelling building. OK to process as DTI as per City staff · no contractor listed2026-11-05
#300-1401 W 8th Avenue Interior alterations to provide tenant improvements to this existing Radio Communication Station to add one meeting room within unit #300 on the 3rd level of this existing commercial building on this site. Okay for FR as per City staff · Multigroup Enterprise Corp2026-11-05
Exterior alterations for targeted building envelope repairs to the south roof deck membrane in this existing multiple dwelling building on this site. The scope includes to remove and replace the sanitary piping on this roof deck. Ok for Field review per City staff · no contractor listed2026-11-04