7858 Oak St, Vancouver

An address in Marpole, Vancouver, zoned RM-8 (Residential). 10 building permits are on file, most recently “To construct a three level 5 townhouse units facing Oak street access through the court y…” (issued 23 July 2020). The City's 2026 assessed value for the 17 accounts at this address is $28,306,000.

Zoning
RM-8 · Residential
Neighbourhood
Marpole
Permits on file
10
Assessed value (2026)
$28,306,000
17 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 7858 Oak St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153266, 836 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
836
Households
295
Median age
41.2
Median household income (2020)
$70,000
Own their home
81%
Vancouver: 45%
Average household size
2.8
Under 15
16%
65 and over
17%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2020-07-23 To construct a three level 5 townhouse units facing Oak street access through the court yard. Refer to BP-2019-00837 for site work, below grade facilities and common underground parking. Reviewed during the 2020 pandemic crisis.
    no contractor listed
    Issued
  2. 2020-07-23 To construct a three level 5 townhouse units facing Park Street. Refer to BP-2019-00837 for site work, below grade facilities and common underground parking. Reviewed during the 2020 pandemic crisis. Revision 1 - (Mar. 11, 2022) - Primary addressing change.
    no contractor listed
    Issued
  3. 2020-07-23 To construct a three level 6 townhouse units facing Oak street. Refer to BP-2019-00837 for site work, below grade facilities and common underground parking. Reviewed during the 2020 pandemic crisis. Revision 1 - (Mar. 11, 2022) - Primary addressing change.
    no contractor listed
    Issued
  4. 2020-04-30 To demolish this existing 1932 character multiple conversion dwelling containing two dwelling units. Green demo 90 recycling required Hold til BU is issuable Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $10,000
    Mash Construction Ltd.
    Issued
  5. 2020-04-30 To demolish this existing 1952 one family dwelling on this site Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $10,000
    Mash Construction Ltd.
    Issued
  6. 2020-04-30 To demolish the existing 1924 character one family dwelling on this site. Green demo 90% recycling Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $10,000
    Mash Construction Ltd.
    Issued
  7. 2020-04-28 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc.
    Mash Construction Ltd.
    Issued
  8. 2020-04-28 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc.
    Mash Construction Ltd.
    Issued
  9. 2020-04-28 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc.
    Mash Construction Ltd.
    Issued
  10. 2020-04-09 To construct 3 new residential structures consisting of a total 16 dwelling units, all constructed above a common single level non-combustible storage garage as one building. All 3 structures are of combustible construction in townhouse units, and there are no stacked unit conditions. The project will be sprinklered and equipped with a monitored fire alarm system. Note: VBBL 2014. - Reviewed during the 2020 pandemic crisis. Townhouse 1 facing Oak St. have 6 units. is under BP-2019-03400. Townhouse 2 facing Park St. have 5 unit is under BP-2019-03402. Townhouse 3 facing Oak St. access through the court yard have 5 units is under BP-2019-03403. STAGE 1 - Excavation and Shoring issued on April 9, 2020. STAGE 2 - Full Construction issued on July 23, 2020. Revision 1 - (Mar. 11, 2022) - Primary address change to the following two spinoff permits: BP-2019-03400 & BP-2019-03402. · $7,500,000
    Allaire Construction Inc
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Marpole

8188 Manitoba St
#352 - 8250 Manitoba St Interior alteration to provide first tenant improvements for a new Wholesale class B (F2) tenant at this industrial building on this site. Ok for field review per City staff: Noteworthy Stationary Supplies · no contractor listed
2026-10-30
8188 Manitoba St
#426 Landlord improvement for an existing Textile manufacturing shell space in this existing industrial building on this site. Notes: Separate permits will be required for future tenant. Ok for field review per City staff · no contractor listed
2026-10-27
8433 Ash St
670 SW Marine Drive Interior alterations to provide first tenant improvements and a change of use/occupancy for this existing Retail - Shell (Group E) unit for a new Fitness Centre - Class 1 ( Low Occupant Assembly, Group D) tenant in unit 670 SW Marine Drive on the 2nd level of this existing mixed-use building on this site. · Sian Group Investments Inc
2026-10-27
Something wrong on this page? Tell us and we'll check it against the City's records.