Permit GopherAlberta and B.C. property, permit and zoning records

7525 Yukon St, Vancouver

An address in Marpole, Vancouver, zoned RM-9 (Residential). 13 building permits are on file, most recently “To construct a 4 storey townhouse block (building #3) containing 8 dwelling units. This p…” (issued 28 November 2018). The City's 2026 assessed value for the 33 accounts at this address is $49,084,500.

Zoning
RM-9 · Residential
Neighbourhood
Marpole
Permits on file
13
Assessed value (2026)
$49,084,500
33 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 7525 Yukon St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150487, 810 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
810
Households
295
Median age
33.6
Median household income (2020)
$88,000
Own their home
56%
Vancouver: 45%
Average household size
2.6
Under 15
15%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2018-11-28 To construct a 4 storey townhouse block (building #3) containing 8 dwelling units. This permit is related to BP-2017-02965 see this file for documents and fees. Stage 1 issued June 8/18 Stage 2 issued Sept.12/18 Stage 3 issued Nov.28/18
    no contractor listed
    Issued
  2. 2018-11-28 To construct a 4 storey townhouse block (building #1) containing 8 dwelling units. This permit is related to BP-2017-02965 see this file for documents and fees. stage 1 issued June 8/18 stage 2 issued Sept.12/18 stage 3 issued Nov.28/18
    no contractor listed
    Issued
  3. 2018-09-12 To construct a 4 storey townhouse block (building #4) containing 9 dwelling units. This permit is related to BP-2017-02965 see this file for documents and fees. Stage 1 issued June 8/18 Stage 2 issued Sept.12/18 Stage 3 issued Nov.28/18
    no contractor listed
    Issued
  4. 2018-09-12 To construct a 4 storey townhouse block (building #2) containing 7 dwelling units. This permit is related to BP-2017-02965 see this file for documents and fees. Stage 1 issued June 8/18 stage 2 issued Sept.12/18 Stage 3 issued Nov.28/18
    no contractor listed
    Issued
  5. 2018-06-08 To construct a 4-storey residential building complex on top of 3-storey of below grade parking. The building complex consists of four 4-storey stacked townhouse clusters. The building cluster will be fully sprinklered and provided with a monitored fire alarm system. This permit is for site works and parkade. This permit is also related to BP-2018-02864, BP-2018-02865, BP-2018-02866, BP-2018-02868 for the townhouse blocks. this is a CP project with Susana Chui as CP STAGED CONSTRUCTION stage 1 - excavation and shoring issued June. 8/18 stage 2 - full structural and change of CP issued Sept.12/18 stage 3 - full construction issued Nov.28/18 stage 4 - revision #1 - to change the interior layout of of unit A1 and to show a window on the floor plan of unit type CC that was previously only shown on the elevation drawings. - accepted Jan.20/21 · $17,860,000
    no contractor listed
    Issued
  6. 2018-04-23 To demolish the existing one family dwelling building on this site. OK for SIPS per City staff: Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver · $18,000
    Allaire Construction Inc
    Issued
  7. 2018-04-23 To demolish the existing one family dwelling building on this site. OK for SIPS per City staff: Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver · $18,000
    Allaire Construction Inc
    Issued
  8. 2018-04-18 To demolish the existing one family dwelling building on this site. OK for SIPS per City staff: Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver · $18,000
    no contractor listed
    Issued
  9. 2018-04-13 To demolish the existing one family dwelling building on this site. OK for SIPS per City staff: Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver · $18,000
    no contractor listed
    Issued
  10. 2018-03-15 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc., [contact removed] Rel to: DB-2018-00794
    no contractor listed
    Issued
  11. 2018-03-15 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc., [contact removed] Rel to: DB-2018-00793
    no contractor listed
    Issued
  12. 2018-03-15 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc., [contact removed] Rel to: DB-2018-00792
    no contractor listed
    Issued
  13. 2018-03-15 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Rel to: DB-2018-00790 QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc., [contact removed]
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Marpole

8675 French St
Exterior alterations to provide residential improvements in the replacement of windows on multiple floors and units of this existing multiple dwelling building on this site. Okay for Field Review as per City staff · no contractor listed
2026-11-04
8188 Manitoba St
#352 - 8250 Manitoba St Interior alteration to provide first tenant improvements for a new Wholesale class B (F2) tenant at this industrial building on this site. Ok for field review per City staff: Noteworthy Stationary Supplies · no contractor listed
2026-10-30
8433 Ash St
670 SW Marine Drive Interior alterations to provide first tenant improvements and a change of use/occupancy for this existing Retail - Shell (Group E) unit for a new Fitness Centre - Class 1 ( Low Occupant Assembly, Group D) tenant in unit 670 SW Marine Drive on the 2nd level of this existing mixed-use building on this site. · Sian Group Investments Inc
2026-10-27
Something wrong on this page? Tell us and we'll check it against the City's records.