745 Thurlow St, Vancouver

An address in West End, Vancouver, zoned CD-1 (493) (Comprehensive Development). 29 building permits are on file, most recently “#420 - 4th Floor Interior alterations to provide improvements to this new office tenant o…” (issued 26 August 2026). The City's 2026 assessed value is $334,099,000.

Zoning
CD-1 (493) · Comprehensive Development
Neighbourhood
West End
Permits on file
29
Assessed value (2026)
$334,099,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 745 Thurlow St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153483, 869 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
869
Households
375
Median age
41.2
Median household income (2020)
$73,000
Own their home
47%
Vancouver: 45%
Average household size
1.7
Under 15
6%
65 and over
14%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-08-26 #420 - 4th Floor Interior alterations to provide improvements to this new office tenant on the 4th floor (#420) of this existing commercial building on site. Scope of work: Select demo of interior walls to create open work area and millwork, construct new partitions for meeting room, enclosed office area, electrical, mechanical and plumbing work to suit. TENANT: Innova of Italy, NA Inc · $115,000
    no contractor listed
    Issued
  2. 2026-06-29 #4th Floor - 745 Thurlow St. Interior alterations to provide improvements to the common corridor area on the 4th floor - 745 Thurlow St. of this existing commercial building on this site. Okay for DTI per City staff · $140,000
    no contractor listed
    Issued
  3. 2026-06-05 #1850- 18th floor - Demising into two units to be (#1810 & #1850) Interior alterations to the 18th floor to demise unit #1850 into two units to be #1810 & #1850 in this existing commercial building on this site. Scope of work. demolish 3 offices, construct new demising wall. Separate permit(s) required if future improvements are needed. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $8,500
    Central West Project Management Inc.
    Issued
  4. 2026-02-03 #2130 & #2110 - (combining) Interior alterations to provide improvement to an existing office tenant on the 21st floor by combining suite #2130 and #2110 (retaining #2110) in this existing commercial building on site. Scope of work: Remove the demising wall to combine the 2 suites. Demolish all the existing partitions, doors, frames to alter layout. New non-structural partitions, millwork, finishes., electrical, mechanical/plumbing and sprinkler work to suit. TENANT: Dimensional Fund Advisors Canada · $961,000
    no contractor listed
    Issued
  5. 2026-01-28 747 Thurlow Street Okay for BP Interior alterations to provide tenant improvements to this existing Retail Store for a new retail tenant on the ground floor of this existing commercial building on this site. Scope of work includes: partitions, doors, electrical, fire alarm, mechanical, sprinkler, plumbing, ceiling, furniture and fixtures This is a sprinklered building. Okay for Field Review as per City staff · $600,000
    Deborah Lewin & Nilton Tavares
    Issued
  6. 2026-01-26 #440 & #420 - 4th Floor Interior alterations on the 4th floor to an existing general office to expand unit into a portion of #420 thus increasing the size of suite #440 and to provide tenant improvements in this existing commercial building on site. Scope of work: Demolish and relocate the demising wall to increase the size of suite #440 and decrease #420. Remove a partition wall between 2 offices to create one big meeting room. New and bigger lunch area, open office workstations, electrical, mechanical/plumbing, sprinkler work to suit. TENANT: Ping Identity Canada Inc · $500,000
    Reotech Construction Ltd
    Issued
  7. 2025-08-26 #800 - 8th Floor Interior alterations to provide improvement for a new office tenant on the 8th Floor (#800) in this existing office of this commercial building on site. Scope of work: Construct new partition, 2 new doors and electrical work TENANT: Royal Bank of Canada · $26,000
    no contractor listed
    Issued
  8. 2025-08-26 #600 - 6th floor Interior alterations to provide minor alterations to this new office tenant on the 6th floor (#600) in this existing commercial building on site. Scope of work: Remove a partition, a new door and electrical work. TENANT: RBC Vancouver · $12,000
    no contractor listed
    Issued
  9. 2024-08-29 #1900 - 19th Floor Interior alterations to provide improvements to this existing tenant on the 19th floor (#1900) in this existing commercial building on site. Scope of work: Demo and construction to select areas to alter layout for new privacy walls and new sliding doors between offices. TENANT: RBC Wealth Management · $100,000
    no contractor listed
    Issued
  10. 2024-08-29 #2000 - 20th Floor Interior alterations to provide improvements to this existing tenant on the 20th floor (#2000) in this existing commercial building on site. Scope of work: Demolish and construction to select areas to alter layout for new offices, meeting room and open workstation. Electrical and sprinkler work to suit. TENANT: RBC Wealth Management · $250,000
    no contractor listed
    Issued
  11. 2023-08-08 #1500 - 15th Floor Interior alterations to provide improvements for this new office tenant on the 15th floor (#1500) in this existing commercial building. Scope of work: Demolish existing office partitions, ceiling grid & flooring. Construct new interior offices, meeting spaces, reception and lunch room. Electrical, plumbing and sprinkler work. TENANT: RBC Wealth Management · $1,800,000
    no contractor listed
    Issued
  12. 2022-09-16 #1600 - 16th floor (full floor tenant) Interior alterations to provide improvements for this new General Office tenant on the 16th floor (#1600) in this existing commercial building. Scope of work: remove/construct partition walls, doors, millwork, ceiling work, finishes, lighting, HVAC, electrical and sprinkler work. TENANT: Northbridge Financial Corporation · $490,000
    Counterpoint Interiors Inc
    Issued
  13. 2022-05-26 Interior alterations to construct a coffee shop kiosk in the main lobby of 745 Thurlow Street in this existing mixed-use building on this site. Scope of Work: Millwork installation, modifications to walls, HVAC, plumbing, and electrical. · $160,000
    Blue Rock Construction Management Ltd
    Issued
  14. 2022-03-28 #1400 - 14th floor (full floor tenant) Interior alterations to provide improvements for this new General Office tenant on the 14th floor (#1400) in this existing commercial building. Scope of work: remove/construct partition walls, doors, millwork, ceiling work, finishes, lighting, HVAC, electrical and sprinkler work. TENANT: Insurance Council of BC · $1,400,000
    Kinetic Construction Ltd
    Issued
  15. 2021-06-04 747 Thurlow Street Interior alterations to provide improvements to this Retail Store in this existing building on this site. Scope of work: Re and re lighting. Finishing and fixtures throughout. · $500,000
    no contractor listed
    Issued
  16. 2021-02-09 #420 - 4th Floor Interior alterations to provide tenant improvements to #420 on the 4th floor for a new office tenant in this existing commercial building on this site. Scope of work includes : remove partition walls and doors, construct new glazing partition walls, electrical and plumbing work. TENANT: Peninsula Employment Services Limited · $224,094
    no contractor listed
    Issued
  17. 2020-11-18 #1100 - 11th floor (full floor tenant) Interior alterations to provide tenant improvement for this existing office tenant on the 11th floor (#1100) in this existing mixed use building. Scope of work: remove/construct partition walls, doors to create new boardroom and reception area, relocate light fixtures, new finishes, power/data, electrical & sprinkler work. TENANT: SNC-Lavalin Inc. Building Sprinklered - No sprinkler work required as per City staff: N/A (BOMA BESt (Path 1)) OK For Field Review as per City staff · $35,000
    Fusion Project Management Ltd
    Issued
  18. 2020-09-11 #900-9th floor (full floor) Interior alterations to provide tenant improvement for a new office on the 9th floor (#900-entire floor) in this existing mixed use building. Scope of work per VBBL 2019: construct partition walls, new doors, glazing, millwork, gypsum board ceiling, finishes, furniture, card reader, lighting, electrical, mechanical and sprinkler work. · $1,150,000
    Wales McLelland Construction Company (1988) Ltd
    Issued
  19. 2020-09-11 #800-8th floor (full floor) Interior alterations to provide tenant improvement for a new office on the 8th floor (#800-entire floor) in this existing mixed use building. Scope of work per VBBL 2019: construct partition walls, new doors, glazing, millwork, gypsum board ceiling, finishes, furniture, card reader, lighting, electrical, mechanical and sprinkler work. · $1,150,000
    Wales McLelland Construction Company (1988) Ltd
    Issued
  20. 2020-09-10 #1000-10th floor (full floor) Interior alterations to provide tenant improvement for a new office on the 10th floor (#1000-entire floor) in this existing mixed use building. Scope of work per VBBL 2019: construct partition walls, new doors, glazing, millwork, gypsum board ceiling, finishes, furniture, card reader, lighting, electrical, mechanical and sprinkler work. · $1,150,000
    Wales McLelland Construction Company (1988) Ltd
    Issued
  21. 2020-08-18 #500 - 5th and 6th floors (interconnected) Interior alterations to the interconnected 5th and 6th floor (#500) for a new office tenant in this existing commercial building. Scope of work: Per the 2019 VBBL to remove/construct partition walls, doors, new accessible washrooms, ceiling work, finishes, lighting, electrical, plumbing, mechanical and sprinkler work. · $2,100,000
    Wales McLelland Construction Company (1988) Ltd
    Issued
  22. 2020-02-14 #700-7th floor (full floor) Interior alterations to provide tenant improvement for a new office on the 7th floor (#700-entire floor) in this existing mixed use building. Scope of work per VBBL 2019: construct partition walls, new doors, glazing, millwork, gypsum board ceiling, finishes, furniture, card reader, lighting, electrical, mechanical and sprinkler work. TENANT: Kabam Games Inc. · $600,000
    Canadian Turner Construction Company Ltd
    Issued
  23. 2020-01-07 #700-7th Floor (full floor) Interior alterations to provide tenant improvements on the 7th floor (#700) for a new tenant in this existing mixed use building. Scope of work per VBBL 2019: demolish partition walls, remove doors, glazing, millwork, lighting, ceiling, electrical and plumbing work. Energy upgrade exempt: Interior demolition only. Note: Some interior partition walls to remain. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to this space. TENANT: Kabam Games · $100,000
    Canadian Turner Construction Company Ltd
    Issued
  24. 2019-02-25 #1850 - 18th floor (full floor) Interior alteration to provide tenant improvement by expanding #1850 into #1830 to become full floor tenant in this existing commercial building on this site. Scope of work: remove portion of demising wall to expand, demo and new parition walls, millwork, electrical, plumbing, RCP, & finishes to change layout to expanded area. Okay for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $265,712
    no contractor listed
    Issued
  25. 2018-08-23 #1400-14th floor (full floor tenant) Interior alterations to provide improvements for this existing General Office Tenant in unit #1400 in this existing commercial building. Scope of work: remove partitions, millwork, fixtures, glazing, install new millwork, furniture, walls, flooring, TV's, sink, lighting, electrical, plumbing and sprinkler work. TENANT: Elastic Path Software Inc. OK for TIPS as per City staff · $115,000
    Matra Construction Inc
    Issued
  26. 2018-05-10 #2140 - 21st floor Interior alterations to provide tenant improvements to this existing office on the 21st floor (#2140) in this existing commercial building in this site. Scope of work: demolish partitions/doors, construct new partition walls, pony walls, doors, finishes, ceiling work, mechanical, electrical, plumbing and sprinkler work. TENANT: Intime Solutions · $310,000
    VPAC Construction Group Ltd
    Issued
  27. 2017-08-04 #1700 - 17th floor (#1760 & #1710 combining) Interior alterations to provide tenant improvements for this existing office tenant on the 17th floor (#1760) to expand into unit #1710 to become a full floor tenant in this this existing commercial building. Scope of work; demo portion of demising walls to expand into unit #1710, new partitions, HVAC, sprinklers, electrical & data/communications, fire alarm, millwork/countertops & new finishes for new layout in this expanded area. * Note: Unit #1760 and #1710 to be removed from the building and Unit #1700 to be clearly posted on the building prior to final inspection. OK for TIPS processing as per City staff. · $250,000
    Omicron Construction Ltd
    Issued
  28. 2017-04-12 #1760-17th floor Interior alterations to provide improvements for new office tenant on the 17th floor (#1760) in this existing office shell space in this existing commercial building. Scope of work: new partition walls, doors, glazing, card reader, millwork/countertops, finishes, ceiling, lighting, mechanical, fire alarm, electrical, plumbing, HVAC and sprinkler work for new tenant layout. TENANT: Trez Capital Group Limited Partnership Ok for field review per City staff the 17th floor into 2 units (#1710 and #1760). · $1,100,000
    Omicron Construction Ltd
    Issued
  29. 2017-02-21 #1710 & #1760-17TH FLOOR Interior alterations to demise the 17th floor into two suites (to be #1710 - #1760) , and provide alterations to the elevator lobby. Scope of work: new demising walls and doors to demise this floor into two units, new glazing, and stone work in the lobby. *NO WORK PROPOSED TO TENANT SPACES. SEPARATE PERMITS and ASHRAE WILL BE REQUIRED FOR TENANT IMPROVEMENTS. * Unit numbers to be posted prior to final inspection Energy Upgrade Exempt: Base Building built to 901.1-2007 and better. · $110,000
    Gibraltar Holdings Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1090 W Georgia St
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1090 W Georgia St
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1030 W Georgia St
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc
2026-10-30