Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
689 W 30th Av, Vancouver
An address in South Cambie, Vancouver, zoned RM-8A (Residential). 23 building permits are on file, most recently “Building 8 - To construct a 3-storey townhome containing five dwelling units. Refer BP-20…” (issued 16 November 2022). The City's 2026 assessed value for the 44 accounts at this address is $82,893,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150672, 857 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2022-11-16
Building 8 - To construct a 3-storey townhome containing five dwelling units. Refer BP-2021-04696 for site work, below grade facilities and common underground parking. VBBL-2019 - NFPA 13R
no contractor listed Issued -
2022-11-16
Building 7 - To construct a 4-storey townhome containing six dwelling units. Refer BP-2021-04696 for site work, below grade facilities and common underground parking. VBBL-2019 - NFPA 13
no contractor listed Issued -
2022-11-16
Building 6 - To construct a 4-storey townhome containing five dwelling units. Refer BP-2021-04696 for site work, below grade facilities and common underground parking. VBBL-2019 - NFPA 13.
no contractor listed Issued -
2022-11-16
Building 5 - To construct a 4-storey townhome containing six dwelling units. Refer BP-2021-04696 for site work, below grade facilities and common underground parking. VBBL-2019 - NFPA 13.
no contractor listed Issued -
2022-11-16
Building 4 - To construct a 3-storey townhome containing five dwelling units. Refer BP-2021-04696 for site work, below grade facilities and common underground parking. VBBL-2019 - NFPA 13R.
no contractor listed Issued -
2022-11-16
Building 3 - To construct a 3-storey townhome containing five dwelling units. Refer BP-2021-04696 for site work, below grade facilities and common underground parking. VBBL-2019 - NFPA 13R.
no contractor listed Issued -
2022-11-16
Building 2 - To construct a 3-storey townhome containing five dwelling units. Refer BP-2021-04696 for site work, below grade facilities and common underground parking. VBBL-2019 - NFPA 13R.
no contractor listed Issued -
2022-11-16
Building 1 - To construct a 3-storey townhome containing six dwelling units. Refer to BP-2021-04696 for site work, below-grade facilities, and common underground parking. VBBL-2019 - NFPA 13R.
no contractor listed Issued -
2022-10-03
To construction three, 4-storey (for 5, 6, & 7 bldg.) and five, 3-storey wood frame buildings totaling 43 townhomes over top of a common 1 level underground parkade. VBBL-2019 - NFPA 13/13R Building 1 - BP-2022-03158 Building 2 - BP-2022-03166 Building 3 - BP-2022-03171 Building 4 - BP-2022-03175 Building 5 - BP-2022-03179 Building 6 - BP-2022-03180 Building 7 - BP-2022-03181 Building 8 - BP-2022-03182 Stage 1 - Excavation and Shoring issued on July 21, 2022. Stage 2 - Foundation to Grade issued on Oct. 3, 2022. Stage 3 - Full Construction issue on Nov. 16, 2022. Rev #1 (Apr. 3, 2024) - Interior and exterior alterations and removing the vestibules at the parkade level related to the Arch, Mech, and Electrical changes. Please see the change letters for details. · $19,350,000
Conwest Bridge Ltd Issued -
2022-06-30
To demolish this one family dwelling building to grade. Ok for SIPs per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Fleck Contracting Ltd Issued -
2022-05-18
To demolish this one family dwelling with secondary suite building to grade. Ok for SIPs per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Fleck Contracting Ltd Issued -
2022-05-18
To demolish this one family dwelling building to grade. Ok for SIPs per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Fleck Contracting Ltd Issued -
2022-05-12
To demolish this one family building to grade Ok for SIPs per City staff)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 2) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Fleck Contracting Ltd Issued -
2022-05-11
To demolish this one family dwelling building to grade. Ok for SIPs per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Fleck Contracting Ltd Issued -
2022-05-06
To demolish this one family dwelling with secondary suite building to grade. Ok for SIPs per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Fleck Contracting Ltd Issued -
2022-05-06
To demolish this one family building to grade. Ok for SIPs per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Fleck Contracting Ltd Issued -
2022-04-27
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. Related Demo BP-2021-04831 QP is Adrian Lee of EPOCH Environmental Consulting Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house.
Fleck Contracting Ltd Issued -
2022-04-27
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. Related Demo BP-2021-04822 QP is Adrian Lee of EPOCH Environmental Consulting Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house.
Fleck Contracting Ltd Issued -
2022-04-27
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. Related Demo BP-2021-04820 QP is Adrian Lee of EPOCH Environmental Consulting Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house.
Fleck Contracting Ltd Issued -
2022-04-27
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. Related Demo BP-2021-04818 QP is Adrian Lee of EPOCH Environmental Consulting Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house.
Fleck Contracting Ltd Issued -
2022-04-27
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. Related Demo BP-2021-04815 QP is Adrian Lee of EPOCH Environmental Consulting Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house.
Fleck Contracting Ltd Issued -
2022-04-27
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. Related Demo BP-2021-04810 QP is Adrian Lee of EPOCH Environmental Consulting Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
Fleck Contracting Ltd Issued -
2022-04-27
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. Related Demo BP-2021-04797 QP is Adrian Lee of EPOCH Environmental Consulting Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
Fleck Contracting Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in South Cambie
Exterior alterations for building envelope repairs to this existing multiple dwelling building on this site. Scope of work includes: - Replacing the existing balcony guardrails with a fully face-mounted system - Replacing deteriorated wood trim and siding - Replacing the asphalt shingles on the mansard roof with new fibre-cement cladding Notes: 1. Exterior work only. 2. No interior or electrical work proposed. · no contractor listed2026-11-03
To demolish this existing single detached house (1928)(40,000.00) on this site (declared non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit(s): DP-2026-00487, BP-2026-01980, and BP-2026-01981 ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** •\tThis permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. · Mainline Excavation Ltd2026-10-29
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in stairs to second floor. · BLUEPOINT VENTURES LTD.2026-10-29