Permit GopherAlberta and B.C. property, permit and zoning records

679 Denman St, Vancouver

An address in West End, Vancouver, zoned RM-6 (Residential). 3 building permits are on file, most recently “Per the 2019 VBBL - Interior alterations to this existing Health Care Office in conjuncti…” (issued 11 February 2020). The City's 2026 assessed value is $11,997,000.

Zoning
RM-6 · Residential
Neighbourhood
West End
Permits on file
3
Assessed value (2026)
$11,997,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 679 Denman St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153586, 1,105 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,105
Households
680
Median age
46.8
Median household income (2020)
$73,000
Own their home
20%
Vancouver: 45%
Average household size
1.6
Under 15
5%
65 and over
25%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2020-02-11 Per the 2019 VBBL - Interior alterations to this existing Health Care Office in conjunction with Small Scale Pharmacy at this existing commercial building on the site. OK for Field Review as per City staff. E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $20,000
    Eurostar Finishing Inc
    Issued
  2. 2019-08-16 Interior and exterior alterations: Interior alterations and a change of use for the entire 2nd floor and ground floor lobby area from Restaurant to Yoga Studio (fitness center) for this new tenant. Exterior alteration to replace the existing roof top unit with new. Exterior alterations for new roof top units cleared by Omar Aljebouri, Howie Chow, July 22, 2019. Note: "This permit has been reviewed under the 2014 Vancouver Building By-law (#10908)." · $400,000
    Prosperous Square Developments Ltd.
    Issued
  3. 2019-05-02 Interior alterations to provide interior non load-bearing walls, doors, ceiling, and doors removals to this existing Restaurant Class 1 space, leaving it as "Shell Restaurant" space in this existing commercial building on this site. OK for field review as per City staff: Interior Demolition - Shell NOTE: Restaurant Class 1 - Shell Space only. Separate permit is required for future tenant improvement work. · $40,000
    Pacific Solutions Contracting Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1090 W Georgia St
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1090 W Georgia St
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1030 W Georgia St
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.