An address in Oakridge, Vancouver, zoned CD-1 (55) (Comprehensive Development). 23 building permits are on file, most recently “100 W 49th Interior alterations to provide tenant improvements the existing continuing ed…” (issued 15 April 2026). The City's 2026 assessed value for the 6 accounts at this address is $316,807,543.

Zoning
CD-1 (55) · Comprehensive Development
Neighbourhood
Oakridge
Permits on file
23
Assessed value (2026)
$316,807,543
6 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 6655 Ontario St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153261, 664 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
664
Households
355
Median age
58
Median household income (2020)
$70,500
Own their home
65%
Vancouver: 45%
Average household size
1.9
Under 15
10%
65 and over
42%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-04-15 100 W 49th Interior alterations to provide tenant improvements the existing continuing education office for Continuing Studies (CS) RMT Clinic on the ground floor of this existing community college (Langara College) building on this site. All work to sprinkler systems require a separate sprinkler permit to be applied for by applicant. · $1,300,000
    no contractor listed
    Issued
  2. 2025-10-29 Interior alteration to the 3rd and 5th floor of this existing Science Building on this School site(Langara College). Reviewed under VBBL 2025 Ok to proceed under Field Review - Jeffrey Wong, Oct 2, 2025 This is a sprinklered building. Sprinkler Contractor: Gisborne Industrial Construction Ltd Revision #1 - Oct 2, 2026 Level 5 Physics Lab Removals: - removed work for Room 530 across multiple sheets - removed Level 5 from the door schedule (A-050). Drawing & Plan Updates: - added wall sections (A-400) and details (A-401, A-580) - added Level 2 CRP plans (A-100, A-250) - added an enclosure for the existing plumbing stack (A-600) Interior Elevation Revisions: - scaled interior elevations - revised sheets A-650 to A-652 No Increase in work cost Finishes & Scope Adjustments: Updated ceiling types in rooms 340, 362b, and 358b (referencing detail SF4P on A-081 and A-250), and removed custom millwork/tables from the scope (A-601). · $2,600,000
    no contractor listed
    Issued
  3. 2025-06-04 Interior/exterior alterations for an elevator modernization and related fire alarm system to meet the CSA B44-16 requirements to this existing School – University (Langara College) building on this site. Notes: 1. Exterior work only includes work around the roof condensing unit support and the AC ductless penetration. 2. Main Recall Level: Level 1 3. Alternate Recall Level: Level 2 4. Permit reviewed and approved to VBBL #12511 (2019) · $927,488
    no contractor listed
    Issued
  4. 2025-03-18 100 W 49th Ave Exterior alterations to replace only two sets of stairs at this existing School-University (Langara College)Building A on this site. OK for Field Review per City staff · $200,000
    no contractor listed
    Issued
  5. 2024-12-11 Interior alterations for mechanical system upgrades to this existing School-University (Langara College)Building A and C on this site. the scope includes to expand the mechanical room into the carpenter shop on the main floor. 2019 VBBL Revision 1 - to change the fire rated wall between the storage room and the carpenter shop to an unrated wall as it is not required to be rated. · $5,500,000
    no contractor listed
    Issued
  6. 2022-12-02 Exterior and interior alterations to install underground piping and to interconnect heating /building heating system with new district piping system tied to the existing heating plant at this School site (Langara College) OK for field review per City staff · $4,500,000
    no contractor listed
    Issued
  7. 2022-08-16 Interior alterations to provide improvements to Stuidio-58 in the basement level of Building A School-University (Langara College) building on this site. Work to demolish the bleachers and add a new steel catwalk with storage beneath. Revision #1 - Update door schedule - Update building code summary - Existing paint sink shown on existing plans with additional demolition notes - Retractable bleachers included - New paint sink and new extra step added to existing stairs two new opening in CMU wall - Steel guardrail replaced with plywood clad steel structure wall, steel cover plate - Additional sections and details that were needed for construction drawings OK for Field Review per City staff · $295,000
    no contractor listed
    Issued
  8. 2021-11-23 Student Union Building - Bldg 'S' - 2nd floor Interior alterations to provide improvements to the existing union office on the 2nd floor of this existing school/college building. Scope of work: demo and construct partition walls to reconfigure space, new finishes, acoustical ceilings, and LED upgrades. OK For Field Review, per City staff: L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems · $600,000
    no contractor listed
    Issued
  9. 2021-03-10 SPECIAL EVENT: To erect and install 1 - 30' x 45' tent for the Langara College Studio 58 event for a limited period of time expiring July 31st, 2021. · $3,500
    no contractor listed
    Issued
  10. 2020-04-21 4th floor Interior alterations to convert this existing classroom into a biology research/ teaching lab, a computer teaching lab and 6 offices on the 4th floor of this existing science building at Langara College on this site. · $512,000
    no contractor listed
    Issued
  11. 2019-08-28 Interior alteration to provide tenant improvements to this existing retail limited food tenant (Starbucks Coffee) at the Langara College Library building on this site. Scope of work includes : back bar update, re&re cooking equipments, new grease interceptor in parkade, and electrical and plumbing work. · $60,000
    no contractor listed
    Issued
  12. 2019-06-18 Interior alterations to provide tenant improvements to the 2nd storey of this existing School- University/College (Group A2) building. Proposed work includes conversion of existing classroom spaces to ancillary offices and support spaces. · $1,500,000
    no contractor listed
    Issued
  13. 2019-06-17 Interior alterations to provide tenant improvements to this existing school. Location of work to be on second floor, A266, A267 , A262 A262a, A262b Scope of work to include: Reconfigure interior space to convert existing classrooms into computer lab, classroom and resource centre. New glazed assemblies, updated kitchenette for staff, new acoustical ceiling and LED lights. OK For Field Review as per City staff.2019 · $400,000
    no contractor listed
    Issued
  14. 2019-06-12 To erect and install 1 - 50' x 30' and 1 - 20' x 36' stage for the 49 event for a limited period of time expiring June 16, 2019. · $9,000
    no contractor listed
    Issued
  15. 2019-06-12 Interior alterations to provide tenant improvements to the School- University College (Group A2) building at 100 W 49th Avenue (Building A) on this site. Proposed work is limited to the ancillary office spaces located at the "International Education Center" and includes upgrading of the HVAC system. Permit Amendment #1- 2019-09-10- S.Le · $1,200,000
    no contractor listed
    Issued
  16. 2018-11-22 Interior Alterations to provide improvements for a new RBC Information Booth to give banking advices to Langara Students at the ground floor lobby of this Langara College. Scope of work to include: Construct 2 New partition walls, add new lighting, and furniture. OK for Field Review as per City staff. 19.2018 Operational Letter supplied by : Royal Bank of Canada · $6,000
    no contractor listed
    Issued
  17. 2018-06-08 Interior alterations to provide improvements and to alter the layout of the 3rd floor of this existing college Bldg A including converting existing biology lab to classrooms and new corridor. Scope of work include demo & addition of interior partitions, millwork, doors, glazing, floor, finishes, electrical, plumbing fixtures and sprinkler. OK for FLD RVW per City staff. · $1,000,000
    no contractor listed
    Issued
  18. 2017-11-08 Interior alterations on the second floor to demise the existing science lab and create four new classrooms, art room, production space and work shop which includes a spray booth (not for commercial use) for this existing college building A on this site. Okay for field review per City staff. · $800,000
    no contractor listed
    Issued
  19. 2017-09-13 Interior alterations to demolish three existing classrooms (C120 and C140) to create a new Aboriginal Student Support space and a new student co-op educational space for Langara College on this site. (Building C) Ok for field review S. Dugaro - Aug 02, 2017 · $300,000
    no contractor listed
    Issued
  20. 2017-08-22 Interior alterations to provide interior demolition to the existing chemistry lab and associated offices (A269 to A274) on the second floor of building A for Langara College. Work to include the removal of the flue in rooms A011/A109/A367 and the roof - all work to be made good. OK for field review per City staff: Additional permits required for future tenant improvements. · $100,000
    no contractor listed
    Issued
  21. 2017-08-11 Alterations to repair a storm drain leak and waterproofing of below grade membrane, work includes removal and replacement of existing exterior stair, guard, and handrail to match existing. Ok for field review as per City staff: · $89,925
    Dura Seal Ltd
    Issued
  22. 2017-06-23 Interior alterations to convert the existing lab room into two classrooms on the fourth floor of this existing science building at Langara College. Notes: 1. Any increase in occupant load may require further review of the VBBL. 2. Maximum occupant load to student lounge area: 20 · $150,000
    no contractor listed
    Issued
  23. 2017-01-24 Improvements to convert an existing designated mechanical room into a data centre in the south east portion of the basement level of this existing college building. Ok for field review per City staff: · $500,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Oakridge

1079 W 46TH Av
Interior alterations to change the use from Single Detached House to Single Detached House with Secondary Suite. OK for field review by Jamie Z. on Sept 21, 2026 Note: · KHY Contracting Inc
2026-11-05
6891 Laurel St
To Construct a Multiple Dwelling "Multiplex" with two three storey 2-unit front buildings and two two-storey 1-unit rear buildings with 5 surface parking spaces having access from the lane. The permit is for building 4. 1. BP-2025-01648 - NE Front Building (2 units) - $767,000 2. BP-2025-01649 - SE Front Building (2 units) - $767,000 3. BP-2025-01650 - SW Rear Building (1 unit) - $383,000 4. BP-2025-01651 - NW Rear Building (1 unit) - $383,000 Related DP: DP-2024-01051 ******THIS PERMIT HAS BEEN REVIEWED & ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 AND AMENDMENT EFFECTIVE FEBRUARY 27, 2025 ******** Building Review Branch Notes: 1.\tThis lot is NOT Stratified. 2.\tSch B- STR & GEO are submitted. 3.\tAll dwelling units have separate exterior entrances. 4.\tEntire building to be sprinkler to NFPA 13D requirement. 5.\tAll new windows, doors, and skylights shall conform to AAMA/WDMA/CSA101/I.S.2/A440, NAFS. · MANAV Developments Inc
2026-11-02
6891 Laurel St
To Construct a Multiple Dwelling "Multiplex" with two three storey 2-unit front buildings and two two-storey 1-unit rear buildings with 5 surface parking spaces having access from the lane. This permit is for site and building 1. 1. BP-2025-01648 - NE Front Building (2 units) - $767,000 2. BP-2025-01649 - SE Front Building (2 units) - $767,000 3. BP-2025-01650 - SW Rear Building (1 unit) - $383,000 4. BP-2025-01651 - NW Rear Building (1 unit) - $383,000 Related DP: DP-2024-01051 ******THIS PERMIT HAS BEEN REVIEWED & ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 AND AMENDMENT EFFECTIVE FEBRUARY 27, 2025 ******** Building Review Branch Notes: 1.\tThis lot is NOT Stratified. 2.\tSch B- STR & GEO are submitted. 3.\tAll dwelling units have separate exterior entrances. 4.\tEntire building to be sprinkler to NFPA 13D requirement. 5.\tAll new windows, doors, and skylights shall conform to AAMA/WDMA/CSA101/I.S.2/A440, NAFS. · MANAV Developments Inc
2026-11-02