Permit GopherAlberta and B.C. property, permit and zoning records

650 W 41st Av, Vancouver

An address in Oakridge, Vancouver, zoned CD-1 (1) (Comprehensive Development). 173 building permits are on file, most recently “#4528 (Goh Ballet) First Tenant Improvement and change of use from Retail (Group E) to Fi…” (issued 6 October 2026). The City's 2026 assessed value is $1,937,227,000.

Zoning
CD-1 (1) · Comprehensive Development
Neighbourhood
Oakridge
Permits on file
173
Assessed value (2026)
$1,937,227,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 650 W 41st Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150544, 787 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
787
Households
440
Median age
56.8
Median household income (2020)
$48,400
Own their home
61%
Vancouver: 45%
Average household size
1.7
Under 15
10%
65 and over
39%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-10-06 #4528 (Goh Ballet) First Tenant Improvement and change of use from Retail (Group E) to Fitness Centre - Class 2 (Group A2) for this Ballet Studio on the Level 3 & 4 of the Oakridge Mall. Note: - AL-2026-00127 for sprinkler protected glazing in a rated fire separation. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on October 6, 2026. · $1,000,000
    no contractor listed
    Issued
  2. 2026-09-23 #1222 (Steve's Poke) First Tenant Improvement for this Retail - Limited Food Services (Group E) on the Level P2 of the Oakridge Mall. Mechanical Review Notes: - Class 5 Cooking Operation (No Hood). - Appliances are less than or equal to 6 kW. Cooking procedures producing significant grease laden vapours, or significant heat or steam are not permitted. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on September 23, 2026. · $300,000
    no contractor listed
    Issued
  3. 2026-07-22 #4101 (Altea) First Tenant Improvement and Change of Major Occupancy from Retail - shell (Group E) to Fitness Centre - Class 2 (Group A2) with ancillary Retail - Limited Food (smoothie bar) and Beauty & Wellness (limited to thermal therapy) for this unit on the Level 2 of the Oakridge Mall. Note: - This permit is for tenant improvement for #4101 only. Scope of demising original #4101 into 2 units is under DP-2026-00301 and base building BP revision. - Class 5 Cooking Operation (No Hood) is proposed for smoothie bar. Appliance is less than 6 kW. Cooking procedures producing significant grease laden vapours, or significant heat or steam are not permitted. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on July 22, 2026. · $15,310,000
    no contractor listed
    Issued
  4. 2026-06-16 #3517 (Leah Alexandra) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on June 16, 2026. · $400,000
    no contractor listed
    Issued
  5. 2026-06-09 #466 - 6001 Cambie Street (Strata Office for Building 6 & 7) First Tenant Improvement for this Office (Group D) on the Level 4 of the Oakridge Park Building 6. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on June 9, 2026. · $90,000
    no contractor listed
    Issued
  6. 2026-06-09 #654 - 672 W 41st Av (Strata Office for Building 4) First Tenant Improvement for this Office (Group D) on the Level 6 of the Oakridge Park Building 4. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on June 9, 2026. · $81,200
    no contractor listed
    Issued
  7. 2026-05-11 #2116 (The Nails) First Tenant Improvement for this nail salon (Group D) on the P1 Level of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on May 11, 2026. · $150,000
    Boas Construction Ltd
    Issued
  8. 2026-05-11 #3146 (Kith) First Tenant Improvement for this Retail Store (Group E) with ancillary Retail Limited Food Services on the ground floor of the Oakridge Mall. Scope of work includes an ice cream booth ("Kith Treats") as part of the retail store. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on May 11, 2026. Revision #1, May 20, 2026 - J. Chen - Update work description and Uses to add ancillary retail limited food services. · $2,750,000
    Prodigy Retail Construction Inc
    Issued
  9. 2026-04-29 #3210 (Delysées Desserts) First Tenant Improvement and Change of Use and Major Occupancy from Retail shell (Group E) to Restaurant - Class 1 (Group A2) for this tenant on the ground floor of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on April 29, 2026. · $700,000
    no contractor listed
    Issued
  10. 2026-04-17 #1210 (Teriyaki Experience) First Tenant Improvement for this Retail - Limited Food Services (Group E) on the Level P2 of the Oakridge Mall. Mechanical Review Notes: - Class 1 Cooking Operation (Grease-Laden Vapours): Commercial kitchen exhaust system to NFPA 96 (Type 1 hoods). ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on April 17, 2026. · $100,000
    no contractor listed
    Issued
  11. 2026-04-13 #2107 (Gold Key Insurance) First Tenant Improvement for this Retail Store (Group E) on the level P1 of the Oakridge Mall. Notes: - Permit application changed from BP to DB due to change of use. Ok per City staffl Construction Tenant Improvement (First TI) issued on April 13, 2026. · $200,000
    no contractor listed
    Issued
  12. 2026-04-09 #102 (Scotiabank) First Tenant Improvement and Change of Use and Major Occupancy from Retail - shell (Group E) to Financial Institution (Group D) for this Bank tenant on Level 1 and P1 of the Oakridge Mall. *** Reviewed under the VBBL 2025 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on April 9, 2026. · $1,400,000
    no contractor listed
    Issued
  13. 2026-03-16 #3579 (Magic Box) First Tenant Improvement and Change of Use and Major Occupancy from Retail - shell (Group E) to similar to Fitness Centre (Low Occupant Load Group A2 to be classified as Group D) for this tenant on the ground level of the Oakridge Mall. Notes: - Maximum occupant load cannot exceed 30 persons as per City staff.1.2.7., Division B of VBBL. - Permit application changed from BP to DB due to change of use. Ok per City staff Construction Tenant Improvement (First TI) issued on March 16, 2026. · $500,000
    Reotech Construction Ltd
    Issued
  14. 2026-03-06 #3449 (Celine) First Tenant Improvement for this Retail Store (Group E) on the ground floor of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 6, 2026. · $500,000
    no contractor listed
    Issued
  15. 2026-03-05 #3404 (Fendi) First Tenant Improvement for this Retail Store (Group E) on the ground floor of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 5, 2026. · $500,000
    no contractor listed
    Issued
  16. 2026-03-04 #1224 (Kerrisdale Oakridge Marpole Crime Prevention Society) First Tenant Improvement for this Office Space (Group D) on the level P2 of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 4, 2026. · $350,000
    Reotech Construction Ltd
    Issued
  17. 2026-02-12 #2104 (Mophead Hair Salon) First Tenant Improvement for this Hair Salon (Group D) on Level P1 of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 12, 2026. · $300,000
    no contractor listed
    Issued
  18. 2026-02-12 #3140 (Giorgio Armani Cafe) First Tenant Improvement and change of use and major occupancy from Retail shell (Group E) to Restaurant - Class 1 (Group A2) for this new tenant on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 12, 2026. · $250,000
    no contractor listed
    Issued
  19. 2026-02-05 #3337 (Sisley) First Tenant Improvement for this Retail Store (Group E) with ancillary beauty and wellness services on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Feb 5, 2026. Revision #1, May 20, 2026 - J. Chen - Update work description to add ancillary beauty and wellness services. · $467,000
    no contractor listed
    Issued
  20. 2026-01-30 #2101 (Purdys) First Tenant Improvement for this Retail Store (Group E) on the Level P1 of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on January 30, 2026. Revision #1, May 20, 2026 - J. Chen - Update work description to add ancillary retail limited food services. · $100,000
    no contractor listed
    Issued
  21. 2026-01-21 #2122 (Petit Pont) First Tenant Improvement for this Retail Store (Group E) on the Level P1 of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on January 21, 2026. · $150,000
    no contractor listed
    Issued
  22. 2026-01-21 #3188 (Longchamp) First Tenant Improvement for this Retail Store (Group E) on the ground floor of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on January 21, 2026. · $500,000
    no contractor listed
    Issued
  23. 2026-01-21 #3460 (Champagne Bar) First Tenant Improvement for this bar (Group A2) on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Jan 21, 2026. Revision #1, Mar 11, 2026 - J. Chen · $900,000
    no contractor listed
    Issued
  24. 2026-01-02 #2119 (Shifeon) First Tenant Improvement for this Retail Store (Group E) with ancillary Beauty and Wellness Services on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on January 2, 2026. Revision #1, May 20, 2026 - J. Chen - Update Uses to add ancillary beauty and wellness services. · $180,000
    no contractor listed
    Issued
  25. 2025-12-23 #3304 (Browns) First Tenant Improvement for this Retail Store (Group E) on the ground floor of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 23, 2025. · $200,000
    no contractor listed
    Issued
  26. 2025-12-23 #2124 (Oval Optical) First Tenant Improvement for this Retail Store (Group E) with ancillary health care office (optician) on Level P1 of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 23, 2025. · $230,000
    no contractor listed
    Issued
  27. 2025-12-17 #3184 (Alexander Wang) First Tenant Improvement for this Retail Store (Group E) on the ground floor of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 17, 2025. Revision #1, Jan 22, 2026 - J. Chen - Change back of house ceiling from open to acoustic tiles. · $571,350
    no contractor listed
    Issued
  28. 2025-12-17 #3138 (Giorgio Armani Boutique) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 17, 2025. · $1,500,000
    no contractor listed
    Issued
  29. 2025-12-17 #3403 / #S26 (Chanel Tailor Workshop & Staff Room) First Tenant Improvement for this Tailor Workshop (#3403) and Staff Room (#S26) ancillary to #3116 Chanel (Retail Store, Group E) on the ground level of the Oakridge Mall. Note: Ancillary tailor workshop (#3403) is on ground floor (L1) and staff room (#S26) is on P1 level, both can only be accessed from rear corridor. ***Reviewed under the VBBL 2025*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 17, 2025. · $1,000,000
    no contractor listed
    Issued
  30. 2025-12-05 #3222 (Hello Nori) First Tenant Improvement and Change of Major Occupancy and Use from Retail - shell (Group E) to Restaurant - Class 1 (Group A2) for this suite on the ground level of the Oakridge Mall. Mechanical Review Notes: - Class 1 Cooking Operation (Grease-Laden Vapours). Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). - Maximum occupant load cannot exceed 50 persons. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 5, 2025. · $565,000
    no contractor listed
    Issued
  31. 2025-12-05 #1213 (Umi Sushi) First Tenant Improvement for this Retail - Limited Food Service (Group E) suite on the lower level (P2) of the Oakridge Mall. Notes: - Class 1 Cooking Operation (Grease-Laden Vapours). - Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). - Exhaust will be discharged through base building pre-shaft to the roof. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 5, 2025. · $250,000
    no contractor listed
    Issued
  32. 2025-12-02 #106 (RBC) First Tenant Improvement and Change of Use/Major Occupancy from Retail (shell, Group E) to Financial Institution (Group D) for this Bank on the level 1 and level 2 of the Oakridge Mall. Notes: - OK for DB per City staff Construction Tenant Improvement (First TI) issued on December 2, 2025. · $6,649,367
    no contractor listed
    Issued
  33. 2025-11-04 #3518 (Chow Tai Fook) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on November 4, 2025. · $500,000
    no contractor listed
    Issued
  34. 2025-10-31 #1226 (Tree Cheesecake & Organic Coffee) First Tenant Improvement and Change of Major Occupancy and Use from Retail - shell (Group E) to Restaurant - Class 1 (Low Occupant Load to be classified as Group D) for this Coffee shop on the P2 level of the Oakridge Mall. Notes: - Occupant load is limited to a maximum of 30 persons. - Class 5 Cooking. Appliances are less than or equal to 6 kW. Cooking procedures producing significant grease laden vapours, or significant heat or steam are not permitted. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Oct 31, 2025. · $350,000
    Van de Fliert Construction Ltd
    Issued
  35. 2025-10-07 #3558 (Peninsula) Change of Major Occupancy and use from Retail (shell) to Restaurant - Class 1 (Group A2), and to provide First Tenant Improvement for this suite on the ground level of the Oakridge Mall. Notes: - Proposed occupant load is 250 persons (230 seats, 20 staff). - Class 1 Cooking Operation (Grease-Laden Vapours). - Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). - Okay for DB per City staff ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on October 7, 2025. Revision #1, Oct xx, 2026 - J. Chen · $500,000
    no contractor listed
    Issued
  36. 2025-10-07 #3590 (%Arabica) First Tenant Improvement for this Retail - Limited Food Services (Group E) on the ground floor of the Oakridge Mall. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on October 7, 2025. · $300,000
    no contractor listed
    Issued
  37. 2025-09-22 #2118 (Lush Brow Bar) First Tenant Improvement and Change of Major Occupancy and use from Retail - shell (Group E) to Beauty and Wellness space (Group D) on the level P1 of the Oakridge Mall. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on September 22, 2025. · $275,000
    no contractor listed
    Issued
  38. 2025-09-15 #1219 (Cha House) First Tenant Improvement for this Retail - Limited Food Service (Group E) suite on the lower level (P2) of the Oakridge Mall. Notes: - Class 5 Cooking Operation (No Hood). - Appliances are less than or equal to 6 kW. Cooking procedures producing significant grease laden vapours, or significant heat or steam are not permitted. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Sep 15, 2025. Revision #1, July 09, 2026 - J. Chen - Modifying plumbing fixture in the storage rooms #101 and #103. · $185,000
    no contractor listed
    Issued
  39. 2025-09-15 #3355 (Coach) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on September 15, 2025. · $731,000
    no contractor listed
    Issued
  40. 2025-08-15 #210 (Fairleigh Dickinson University) First Tenant Improvement for this Post Secondary School (Group A2) on the second level of the Oakridge Mall. Note: - Building 12. Change of use from Office to "School - University or College" is under DP-2025-00378. - Related to AL-2025-00054 for extended travel distance. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on August 15, 2025. Revision #1, Apr 10, 2026 - J. Chen - Removed washrooms and public corridor in the office area from this TI scope. See BP-2021-04313, Revision #6. - Reconfigured the floor layout around this area to suit. Revision #2, Apr 24, 2026 - J. Chen · $12,551,553
    Reotech Construction Ltd
    Issued
  41. 2025-07-22 Food Hall Patio (Time Out Market) To install outdoor seating areas (east and west patios) on Level 2 of Oakridge Park, to be used in conjunction with the food hall use. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on July 22, 2025. · $75,000
    Etro Construction Limited
    Issued
  42. 2025-06-30 #3190 (Thom Browne) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on June 30, 2025. · $700,000
    no contractor listed
    Issued
  43. 2025-06-26 #3213 (Sunglass Hut) First Tenant Improvement for the Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Jun 26, 2025. · $250,000
    no contractor listed
    Issued
  44. 2025-05-01 #2112 (Alive Health Centre) First Tenant Improvement for this Retail Store (Group E) on the Level P1 of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on May 1, 2025. · $250,000
    no contractor listed
    Issued
  45. 2025-04-19 #3520 (Lugaro) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on April 19, 2025. Revision #1, Jan 14, 2026 - J. Chen · $1,500,000
    no contractor listed
    Issued
  46. 2025-04-19 #3510 (Tudor) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on April 19, 2025. Revision #1, Oct 14, 2025 - J. Chen - AL-2025-00093 for " Electromagnetic Lock Release Operation on Egress Door" is accepted. - Changed plumbing fixture number and location. - Updated electrical power and lighting plans. Revision #2, Dec 18, 2025 - J. Chen · $2,000,000
    no contractor listed
    Issued
  47. 2025-04-17 #3434 (Dolce & Gabbana) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on April 17, 2025. · $700,000
    no contractor listed
    Issued
  48. 2025-04-09 #306 - 3rd floor (South medical tower) Interior alterations to provide improvements to this existing office space on the 3rd floor (#306) of this existing commercial building. Scope of work: to remove 1 partition wall and two doors/frames to create an open work space. RCP and electrical to suit. * District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $45,000
    1275093 BC Ltd
    Issued
  49. 2025-04-08 #601 Interior alterations only to the existing retail space in unit # 601 in the mixed use building on this site. Scope of work: This building is sprinklered. A separate sprinkler permit is required for all related work. OK for Field Review per City staff · $650,000
    no contractor listed
    Issued
  50. 2025-04-04 #4220 (Presentation Centre) First Tenant Improvement and Change of Use and Major Occupancy to Presentation Centre (Group D) for this Retail shell (Group E) on the level 2 of the Oakridge Mall. See BP-2025-01612 for #4226 (Sales Office). *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Apr 4, 2025. Revision #1, Dec 18, 2025 - J. Chen · $350,000
    City Wide Building Inc
    Issued
  51. 2025-04-04 #4226 (Sales Office) First Tenant Improvement and Change of Use and Major Occupancy to Realtor Office (Group D) for this Retail shell (Group E) on the level 2 of the Oakridge Mall. This permit is a spin off permit. All application documents and fees are under DB-2024-05074. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Apr 4, 2025. Revision #1, Dec 18, 2025 - J. Chen
    City Wide Building Inc
    Issued
  52. 2025-03-31 #3313 (Sandro) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Mar 31, 2025. Revision #1, Apr 21, 2026 - J. Chen · $1,050,000
    no contractor listed
    Issued
  53. 2025-03-27 #3316 (Maje) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 27, 2025. Revision #1, Mar 12, 2026 - J. Chen - Remove plumbing scope, including washroom and domestic water heating. Revision #2, Apr 21, 2026 - J. Chen · $950,000
    no contractor listed
    Issued
  54. 2025-03-27 #3176 (Tiffany) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 27, 2025. Revision #1 - Oct 28, 2025, J. Chen - To add a commercial dishwasher to the hospitality room. Revision #2 - Apr 24, 2026, J. Chen - Expansion of the back of the house - Reduction in size of the VIC salon - Addition of a catwalk platform above storefront · $900,000
    no contractor listed
    Issued
  55. 2025-03-20 #3416 (Prada) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 20, 2025. · $1,500,000
    no contractor listed
    Issued
  56. 2025-03-20 #3428 (Miu Miu) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 20, 2025. Revision #1, Aug 22, 2025 - J. Chen - Changed back-of-house layout and added a sink to staff area. · $900,000
    no contractor listed
    Issued
  57. 2025-03-13 #3516 (TAG Heuer) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 13, 2025. Revision #1, Jan 14, 2026 - J. Chen · $2,251,900
    no contractor listed
    Issued
  58. 2025-03-13 #3158 (Valentino) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Mar 13/25. Revision #1, Jan 14, 2026 - J. Chen · $2,000,000
    no contractor listed
    Issued
  59. 2025-03-07 #3446 (Loro Piana) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 7, 2025. · $1,100,000
    no contractor listed
    Issued
  60. 2025-03-07 #3340 (Sephora) First Tenant Improvement for this Retail Store (Group E) with ancillary beauty services on the ground level of the Oakridge Mall. ***Review under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 7, 2025. Revision #1, May 12, 2026 - J. Chen - Add beauty services to the operations. (No change to drawings) Revision #2, May 20, 2026 - J. Chen - Update work description to add ancillary beauty services. · $1,200,000
    no contractor listed
    Issued
  61. 2025-03-07 #2125 (VIP Styling Lounge) First Tenant Improvement for this Personal Service (Group D) on the P1 level of the Oakridge Mall. ***Review under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 7, 2025. Revision #1, Dec 18, 2025 - J. Chen · $550,000
    City Wide Building Inc
    Issued
  62. 2025-03-04 #1216 (A&W) First Tenant Improvement for this Retail - Limited Food (Group E) suite on the Level P2 of the Oakridge Mall. Notes: - Maximum 16 seats. Mechanical Review Notes: 1. Class 1 cooking operation (Grease-Laden Vapours). 2. Commercial kitchen exhaust system to NFPA 96 (Type 1 hood x 2). *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 4, 2025. Revision #1, Jan 14, 2026 - J. Chen · $640,000
    no contractor listed
    Issued
  63. 2025-03-03 #3570 (Aritzia) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Review under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 3, 2025. Revision #1, Jan 12, 2026 - J. Chen - Reconfigure Staff Area. - Add mop sink. - Leave space above electrical/communication room open. · $2,200,000
    no contractor listed
    Issued
  64. 2025-03-03 #3105 (Birks) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Review under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on March 3, 2025. Revision #1, May 27, 2026 - J. Chen - Reduce suite area (from 404 m2 to 66 m2) - Change suite number from #3107 to #3105 - Remove plumbing scope · $1,400,000
    no contractor listed
    Issued
  65. 2025-02-21 #3501 (Rolex) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Review under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 21, 2025. Revision #1, Aug 6, 2025 - J. Chen - Layout changes and coordination with alternative solution AL-2025-00048 for Electromagnetic Lock Release Operation on Egress Door. Revision #2, Dec 18, 2025 - J. Chen · $5,000,000
    no contractor listed
    Issued
  66. 2025-02-14 #3322 (Diptyque) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Review under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 14, 2025. Revision #1, Jan 14, 2026 - J. Chen · $400,000
    no contractor listed
    Issued
  67. 2025-02-14 #3170 (Dior) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Review under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 14, 2025. · $16,500,000
    no contractor listed
    Issued
  68. 2025-02-11 #3161 (Canada Goose) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Review under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 11, 2025. Revision #1, Nov 12, 2025 - J. Chen - Change floor layout. Revision #2, Jan 14, 2026 - J. Chen · $1,000,000
    no contractor listed
    Issued
  69. 2025-02-10 #3549 (Sporting Life) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. Note: - Storefront glazing to remain clear and unobstructed. No exterior alterations proposed. ***Review under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 10, 2025. · $2,700,000
    no contractor listed
    Issued
  70. 2025-02-07 #3513 (Chaumet) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 7, 2025. · $1,100,000
    no contractor listed
    Issued
  71. 2025-02-05 #2110 (WIRELESSWAVE) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 5, 2025. · $450,000
    no contractor listed
    Issued
  72. 2025-02-05 #3325 (Swarovski) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 5, 2025. · $400,000
    no contractor listed
    Issued
  73. 2025-02-04 #3352 (Hugo Boss) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on February 4, 2025. · $750,000
    no contractor listed
    Issued
  74. 2025-01-31 #3410 (Bulgari) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on January 31, 2025. Revision #1, Oct 14, 2025 - J. Chen - Add electromagnetic lock to the egress door between front and back of house for security reason. Maglock to comply with 3.4.6.16.(4). · $422,190
    no contractor listed
    Issued
  75. 2025-01-22 #3346 (Arc'Teryx) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on January 22, 2025. · $1,300,000
    no contractor listed
    Issued
  76. 2025-01-21 #3540 (Lululemon) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on January 21, 2025. · $3,000,000
    no contractor listed
    Issued
  77. 2025-01-21 #3149 (Maison Margiela) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on January 21, 2025. · $336,116
    no contractor listed
    Issued
  78. 2025-01-10 #1501 (BC Liquor Store) First Tenant Improvement for this Retail Store (Group E) on the P1 and P2 levels of the Oakridge Mall. Notes: - Level P2 will contain retail, office, storage, and warehouse spaces. - Level P1 will consist of a loading bay, waste room, and hospitality pick-up/storage area. - Freight elevators provide access from the loading bay on level P2 to the warehouse on Level P1. - Class 5 Cooking Operation (No Hood) at Tasting Bar. - Appliances are less than or equal to 6 kW. Cooking procedures producing significant grease laden vapours, or significant heat or steam are not permitted. - Related AL-2020-00078 for sprinkler protected glazing in a rated fire separation is under base building BP-2019-05239. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on January 10, 2025. Revision #1, Jan 22, 2026 - J. Chen · $4,000,000
    Gibraltar Holdings Ltd
    Issued
  79. 2024-12-18 #3331 (Alo Yoga) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December18, 2024. · $900,000
    Deborah Lewin & Nilton Tavares
    Issued
  80. 2024-12-18 #3522 (David Yurman) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 18, 2024. · $1,800,000
    no contractor listed
    Issued
  81. 2024-12-16 #3443 (Loewe) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. ***Reviewed under the VBBL 2029*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 16, 2024. · $1,000,000
    no contractor listed
    Issued
  82. 2024-12-16 #3419 (Brunello Cucinelli) First Tenant Improvement for the Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019*** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 16, 2024. Revision #1, Jan 14, 2026 - J. Chen · $950,000
    Deborah Lewin & Nilton Tavares
    Issued
  83. 2024-12-12 #3194 (Christian Louboutin) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 12, 2024. Revision #1, Mar 11, 2026 - J. Chen · $800,000
    no contractor listed
    Issued
  84. 2024-12-10 #3525 (Max Mara) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on December 10, 2024. Revision #1, Dec 18, 2025 - J. Chen · $100,000
    CE MILES PROJECTS LTD.
    Issued
  85. 2024-11-28 #3319 (Weekend Max Mara) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Nov 28, 2024. Revision #1, Dec 18, 2025 - J. Chen · $100,000
    CE MILES PROJECTS LTD.
    Issued
  86. 2024-11-28 #3142 (Acne Studios) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Nov 28, 2024. · $365,375
    no contractor listed
    Issued
  87. 2024-10-22 #3534 (Harry Rosen) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. Note: - Two storeys. - Amendment will be required to finalize the Vendor Areas. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Oct 22, 2024. · $2,100,000
    no contractor listed
    Issued
  88. 2024-10-02 #3310 (Veronica Beard) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on Oct 2, 2024. Revision #1, Jan 14, 2026 - J. Chen · $500,000
    no contractor listed
    Issued
  89. 2024-10-02 #3431 (Ferragamo) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on October 2, 2024. · $1,000,000
    no contractor listed
    Issued
  90. 2024-09-06 #3116 (Chanel Boutique) First Tenant Improvement for this Retail Store (Group E) with ancillary beauty and wellness services on the ground level of the Oakridge Mall. Note: - One Treatment Cabin is proposed and reviewed by VCH. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction TI issued on September 6, 2024. Revision #1, May 20, 2026 - J. Chen - Update work description to add ancillary beauty and wellness services. · $2,000,000
    no contractor listed
    Issued
  91. 2024-08-15 #3437 (Moncler) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction TI issued on Aug 15, 2024. Revision #1, Jan 14, 2026 - J. Chen · $800,000
    no contractor listed
    Issued
  92. 2024-08-02 #3122 (Louis Vuitton) First Tenant Improvement for this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction TI issued on August 2, 2024. Revision #1, Feb 13, 2025 - J. Chen - Layout changes to both the front of house and back of house areas. Revision #2, Apr 28, 2025 -J. Chen · $1,000,000
    no contractor listed
    Issued
  93. 2024-07-11 #3216 (Nespresso) First tenant improvement, interior renovation, for new retail boutique (Group E), Nespresso, on the ground level of the Oakridge Mall. Scope includes new partitions, interior storefront, plumbing, HVAC and electrical. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on July 11, 2024. · $1,000,000
    no contractor listed
    Issued
  94. 2024-06-25 #3425 (Versace) First tenant improvement or this Retail Store (Group E) on the ground level of the Oakridge Mall. *** Reviewed under the VBBL 2019 *** Stage 1 - Full Construction Tenant Improvement (First TI) issued on June 25, 2024. · $250,000
    no contractor listed
    Issued
  95. 2024-03-05 #226 - 2nd floor - South Office Towers Interior alterations to provide improvements for a new office tenant on the 2nd floor (#226) for a temporary Admin. office in this existing commercial building on this site. Scope of work: remove 3 office to create open layout. Ceiling, flooring, electrical to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $20,000
    1275093 BC Ltd
    Issued
  96. 2024-02-08 #1505 First tenant improvement for a Safeway grocery store. The store is located on level P1 and P2. Level P2 includes bakery, deli, meat, produce departments. Level P1 includes a pharmacy and sales department. A Starbucks kiosk on level P2 will be included in a future permit submission. Revision 1: to include Starbucks kiosk and some floor plan changes (issued July 24/24) · $8,000,000
    no contractor listed
    Issued
  97. 2023-11-14 Building Permit for BP-2022-02531 This permit includes upgrading to the existing Terraces/ Medical building in accordance to Part 11 (work is classified as repair and voluntary upgrade). Building permit fees are included in BP-2022-02531. Stage 1: Exterior envelope repairs and voluntary envelope upgrades to the existing South Tower. Modifications to the exterior envelope above the Level 4 slab (within the Terraces strata air space parcel) are excluded from the Stage 1 permit application and will be submitted at a future permit stage. Stage II: Construction of a new energy transfer station within an existing service room located in the basement level (issued May 1/2024)
    no contractor listed
    Issued
  98. 2023-07-27 To construct Oakridge District Energy Systems. including the central energy plant, geo-exchange fields and cooling towers. Note: The refrigerant exhaust stacks are not included in this permit. To be submitted as a future permit stage. Stage II: To construct ventilation exhaust towers at grade. · $70,000,000
    no contractor listed
    Issued
  99. 2023-07-17 Building Permit for BP-2021-02436 To construct four storeys of retail, food hall and restaurant space over three levels of underground parking. Shell permit. The work under this permit includes upgrades to the existing parkade and associated rooftop park (BP fees revised to include this scope of work). Stage I: Modifications and associated upgrades to exit stair ‘E’, reconfiguration of vehicular exit ramp and construction of a temporary exit stair to allow for the ongoing use of the existing parkade while modifications to stair ‘E’ are carried out.
    no contractor listed
    Issued
  100. 2023-07-13 Interior alterations (first TI) for a department store tenancy located on Levels 1 to 2 with vertical circulation areas extending to Levels P1 and P2. Levels 1 and 2 will contain retail, office , storage, and salon/spa spaces. The Project areas are considered a single suite under the management of a single tenant, Hudson’s Bay Company. Stage I issued July 13/ 23. · $17,000,000
    no contractor listed
    Issued
  101. 2023-05-05 To construct mixed-use development comprised of: one 34-storey tower (Building 6) and one 24-storey tower (Building 7) containing a total of 469 Dwelling Units and one 34-storey tower (Building 8) containing 286 Dwelling Units; atop a podium containing Retail/Office Uses; all over three levels of underground parking, and a portion of the future 9-acre Park. STAGED CONSTRUCTION SHELL PERMIT Stage I (excavation/shoring) permit issued without the issuance of related development permit. (issued June 11, 2020) Stage 2 (foundation to grade) issued December 18,2020. Stage 2, revision 2 (full construction parkade) issued May 5, 2021 N.B.: revision #1 skipped Stage 3:construction of podium levels issued October 6, 21. Stage 3, Rev.#1: To update floor levels (structural drawings only) issued issued June 21/ 22 Stage 4: Full construction of level 6 and above of Buildings 6&7. Interior finishes for the following areas: office and residential lobbies at level 1; below-grade elevator lobbies; common areas on office levels 6&7; phase 1 south retail mall interiors. · $687,298,861
    no contractor listed
    Issued
  102. 2023-04-28 To build a 32 story residential tower on a 5 storey podium containing retail & office use, all over 3 storeys of underground parking. Level 2 & 3 rooftops (over retail) are fully landscaped as a public park that includes public event space, a dog run and a walking/running loop. Shell permit (related to DP-2021-00512 DP-6) Stage I (excavation/shoring) issued March 15, 22. Stage II (parkade foundations) issued May 2, 22 Stage II revision 1: Structural revisions to the parkade structure issued July 26. Stage II Revision 2: full construction below grade (issued Jan 11/23) Stage III: Construction of Levels 1 to 6 (to the top of the Level 7 transfer slab). Interior finishes for the mall and Level P1 washrooms (issued April 28/ 23). · $374,793,905
    no contractor listed
    Issued
  103. 2022-12-02 To construct a new 5-storey civic centre (building 1) and a new 22-storey residential building containing 187 social housing units over 4 below grade levels (below grade construction is under BP-2019-01696). Shell permit. Stage I: Building 2 full structure (issued Dec. 16, 21). Stage II: building 1 (Civic Centre) full structure (issued May 20/22)) Stage III: Building 2 full construction (issued July 7/22) Stage IV: Building 1 full construction (issued Dec 2/22) Stage V: landscape scope Revision 1: BP changes made to the kitchen (issued May 28/2025) · $71,894,000
    no contractor listed
    Issued
  104. 2022-07-14 Building Permit for BP-2020-03879: To construct a new 22-storey residential building containing 187 social housing units.
    no contractor listed
    Issued
  105. 2022-07-14 Building Permit for BP-2020-03879: To construct a new 5-storey civic centre (building 1)
    no contractor listed
    Issued
  106. 2022-03-21 #226 Interior alterations to provide improvement and to change use of unit #226 from a health care office to a general office for this new tenant in this existing commercial building. Scope of work includes: reconfiguring interior partition walls, replacing acoustic ceiling tiles, lighting, millwork and finishes. New Tenant: QuadReal OK for field review as per City staff · $150,000
    1275093 BC Ltd
    Issued
  107. 2022-02-03 Demolition of the existing North East Office building · $3,343,786
    no contractor listed
    Issued
  108. 2022-01-19 To demolish the existing Transit Plaza. · $85,000
    no contractor listed
    Issued
  109. 2021-12-07 To construct four storeys of retail, food hall and restaurant space over three levels of underground parking. The work also includes upgrades to the existing parkade and associated rooftop park (BP fees revised to include this scope of work). this work is under BP-2023-01117. Stage I (excavation/shoring) issued December 7, 2021. Stage II (full construction below grade) issued April 8, 22 Stage III (construction above grade, shell permit) issued Jan 19/23 · $141,281,855
    no contractor listed
    Issued
  110. 2021-03-02 Building Permit for BP-2021-00439 To allow salvage and abatement of hazardous materials for the existing Transit Plaza.
    no contractor listed
    Issued
  111. 2021-01-29 To demolish the existing Oakridge mall within areas identified as Phase 2, Phase 1B and Phase 1Mid. Work to be conducted in accordance with Phase Demolition Sequence Plan. · $11,084,564
    no contractor listed
    Issued
  112. 2020-12-17 Building Permit for BP-2020-03569 To allow salvage and abatement of hazardous materials.
    no contractor listed
    Issued
  113. 2020-11-23 Building Permit for BP-2020-03442 To allow salvage and abatement of hazardous materials for the existing office building.
    no contractor listed
    Issued
  114. 2020-11-23 #S306 - Medical Level Interior alterations and a change of use from Health Care Office to General Office at #S306 on the 3rd Medical level of this commercial building on this site. Scope of work includes: removing and replacing interior partition walls, millwork, lighting, and finishes. OK for Field Review per City staff · $70,000
    Renaissance Facility Maintenance Ltd
    Issued
  115. 2020-07-17 Building Permit for BP-2019-05239 For the partial demolition of the existing Oakridge Mall (Phase I South). The phasing/sequence of the demolition and abatement is as per City staffawings and plans: 1. Phase 1 I. All Zones A, B, C services to be disconnected and rerouted. II. Fully abate all identified areas in Zone C III. Abatement work to commence in Zones A & B IV. Hoardings to be installed in Zone A & B & C if required V. QP to provide Hazmat Report Form and Clearance Letter to CoV confirming Zone C abatement work has been complete VI. CoV issues written approval to proceed with structural demolition of Zone C 2. Phase 2 I. Structural demolition of Zone C II. All Zone A services confirmed disconnected and/or rerouted III. Fully abate all identified areas in Zone A IV. Continue Zone B Abatement V. QP to provide Hazmat Report Form and Clearance Letter to CoV confirming Zone A abatement work has been complete VI. CoV issues written approval to proceed with structural demolition of Zone A 3. Phase 3 I. Remove remainder of Zone A finishes under general demolition procedures II. Structural demolition of Zone A III. All Zone B services confirmed disconnected and/or rerouted. (This work can occur during Phase 1). IV. Complete abatement in areas in Zone B V. QP to provide Hazmat Report Form and Clearance Letter to CoV confirming Zone B abatement work has been complete VI. CoV issues written approval to proceed with structural demolition of Zone B 4. Phase 4 I. Remove remainder of Zone A finishes under general demolition procedures II. Structural demolition of Zone B Written approval must be issued by City prior to demolition of each zone.
    no contractor listed
    Issued
  116. 2020-07-14 Building Permit for BP-2020-01016 Building Permit for BP-2019-05239 To allow salvage and abatement of hazardous materials for Phase I South of the redevelopment. The phasing/sequence of the demolition and abatement is as per City staffawings and plans: 1. Phase 1 I. All Zones A, B, C services to be disconnected and rerouted. II. Fully abate all identified areas in Zone C III. Abatement work to commence in Zones A & B IV. Hoardings to be installed in Zone A & B & C if required V. QP to provide Hazmat Report Form and Clearance Letter to CoV confirming Zone C abatement work has been complete VI. CoV issues written approval to proceed with structural demolition of Zone C 2. Phase 2 I. Structural demolition of Zone C II. All Zone A services confirmed disconnected and/or rerouted III. Fully abate all identified areas in Zone A IV. Continue Zone B Abatement V. QP to provide Hazmat Report Form and Clearance Letter to CoV confirming Zone A abatement work has been complete VI. CoV issues written approval to proceed with structural demolition of Zone A 3. Phase 3 I. Remove remainder of Zone A finishes under general demolition procedures II. Structural demolition of Zone A III. All Zone B services confirmed disconnected and/or rerouted. (This work can occur during Phase 1). IV. Complete abatement in areas in Zone B V. QP to provide Hazmat Report Form and Clearance Letter to CoV confirming Zone B abatement work has been complete VI. CoV issues written approval to proceed with structural demolition of Zone B 4. Phase 4 I. Remove remainder of Zone A finishes under general demolition procedures II. Structural demolition of Zone B
    no contractor listed
    Issued
  117. 2020-04-21 Soil remediation - To provide a Notification of Independent Remediation and a Completion of Independent Remediation per the requirements of the Ministry of Environment for this site. The site shall meet the Contaminated Site Regulation remediation standards to Commercial land use for the development lands (onsite), and to Residential land use for City property (off-site). This vacant site shall be back filled immediately to the previous elevation upon completion of the remediation work within 30 days from permit issuance. · $4,142,883
    no contractor listed
    Issued
  118. 2020-03-20 Building Permit for BP-2019-01696 Exterior and interior alterations (partial demolition) of the existing mall (Phase I North only). Work to be conducted in accordance with Phase 1 North Demolition & Abatement Sequence dated March 6, 2020. Written approval must be issued by City prior to demolition of each zone. Demolition and abatement sequencing plan: Phase 1 I. All Zone A/D services disconnected and rerouted II. Hoardings to be installed in Zone A/D III. Fully abate all identified areas in Zone A/D IV. QP to provide Hazmat Report Form and Clearance Letter to CoV confirming Zone A/D abatement work has been completed V. CoV issues written approval to proceed with structural demolition of Zone A/D Phase 2 I. Remove remainder of Zone A/D finishes under general demolition procedures II. Structural demolition of Zone A/D III. All Zone B services disconnected and rerouted (may be completed during Phase 1) IV. Zone B hoardings to be installed V. Fully Abate all identified areas in Zone B VI. QP to provide Hazmat Report Form and Clearance Letter to CoV confirming Zone B abatement work has been completed VII. CoV issues written approval to proceed with structural demolition of Zone B Phase 3 I. Remove remainder of Zone B finishes under general demolition procedures II. Commence structural demolition of Zone B, Zone A/D demolition continues III. All Zone C services disconnected and rerouted (if not completed in Phase 1/2) IV. Zone C hoardings to be installed V. Fully Abate all identified areas in Zone C VI. QP to provide Hazmat Report Form and Final Clearance Report to CoV confirming All abatement work has been completed VII. CoV completes S&A permit and issues written approval to proceed with structural demolition of Zone C Phase 4 I. Remove remainder of Zone C finishes under general demolition procedures II. Commence structural demolition of Zone C, Zone A/B/D demolition continues
    no contractor listed
    Issued
  119. 2020-01-28 Food court Interior renovations for Class I cooking operation for a new tenant in the existing food court. The scope of work also includes installation of new exhaust hood, exhaust fan on the roof deck and grease interceptor. · $110,000
    no contractor listed
    Issued
  120. 2020-01-24 #443 - Mall Level Interior alterations and change of use from Retail to General Office to be used as a temporary presentation centre (gallery) for the Oakridge Development in unit #443 in this existing Oakridge Mall for a limited period of time expiring on January 24, 2021. Scope of work: per City staffture and relocate existing ceiling fixture. TENANT: Westbank Projects Corp. · $60,000
    no contractor listed
    Issued
  121. 2019-12-17 Interior and limited exterior alterations on level 1 and level P1 for a new tenant (Sales Centre), including ancillary ballet studio, in the exiting mall. Revision 1: lower level existing washrooms to be demolished, dance studio configuration changed, new washrooms on Level 1, Level 1 ceiling layout revised. · $800,000
    no contractor listed
    Issued
  122. 2019-12-05 CRU#304 - Ground Level (mall) Interior alterations to provide tenant improvements for a new retail tenant on the ground level (CRU#304) in this existing retail mall building. Scope of work per VBBL 2019: construct partition walls for washroom and storage and consultation rooms, new storefront, folding grilles, new doors, finishes, lighting, electrical, mechanical, plumbing and sprinkler work. TENANT: Alive Health Centre · $70,000
    Gocan Contracting Ltd
    Issued
  123. 2019-11-29 Food court Interior renovations for Class I cooking operation for a new tenant in the existing food court. The scope of work also includes installation of new exhaust hood, exhaust fan on the roof deck and grease interceptor. · $150,000
    no contractor listed
    Issued
  124. 2019-11-21 #K14 - 650 W 41ST Ave Interior alterations to provide tenant improvements for a new Retail tenant in on the 1st floor of this existing commercial building (Oakridge Mall). Scope of work: some interior demolition, new millwork, enclosure gates, lighting, flooring, paint, wall finishes, mechanical, electrical, plumbing and sprinkler work. · $150,000
    no contractor listed
    Issued
  125. 2019-11-18 654 W 41st Av - 2nd Floor Interior alterations to provide improvements for a new temporary administration office tenant on the second floor of this existing mixed used building. Ok for field review per City staff: - remove mechanical shaft, stairs and landing for a new ramp, lighting, t-bar ceiling, flooring and exterior door - install new partition walls for new office layout, washrooms, servery room · $350,000
    Renaissance Facility Maintenance Ltd
    Issued
  126. 2019-10-23 Unit #300 Change of use from Retail Store to General Office and interior alterations to demise unit #300 into two units (#300 & #301) and provide improvement for new General Office tenant in unit #300 in this existing commercial building. · $40,000
    Black Dog Projects Ltd
    Issued
  127. 2019-10-23 Unit #301 Change of use from Retail Store to General Office and interior alterations to provide improvements for General office in unit #301 in this existing commercial building. OK for field review as per City staff · $60,000
    Black Dog Projects Ltd
    Issued
  128. 2019-10-22 Food Court Interior renovations for Class I cooking operation for a new tenant in the existing food court. The scope of work also includes installation of new exhaust hood, MAU and exhaust fan on the roof deck, and grease interceptor in the parking. · $235,000
    no contractor listed
    Issued
  129. 2019-10-21 CRU 24 - To permit interior alterations to move the Tim Horton's location in this exsting mall. Scope of work to include: Relocating the Tim Horton's to the new food court. Majority of kitchen equipment is to be reused, only 3 new hand sinks and a new doughnut shelf. OK For Field Review as per City staff.2019 Selected Energy Upgrade - L2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) · $50,000
    no contractor listed
    Issued
  130. 2019-09-27 F22 Interior alterations to provide improvements for new retail food tenant (Blenz) in the revised food court area of this existing shopping mall commercial/residential complex. Selected energy upgrade: E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Ok for field review per City staff: occupancy permit may not be issued until OC for the related BP-2018-04741 is issued. · $90,000
    no contractor listed
    Issued
  131. 2019-09-27 CRU#306 - Mall Interior alterations to provide improvements for a new Retail tenant on the ground level at CRU#306 (relocated from #183) in this existing commercial building (Oakridge Mall) Scope of work: complete tenant fit out to shell space including steel stud partitions, ceiling, t-bar ceiling, new electrical, plumbing, millwork, finishes, flooring, Tenant: Purdys Chocolatier OK for field review as per City staff. · $120,000
    TBI Management Ltd.
    Issued
  132. 2019-08-26 #161-Ground floor (mall) Interior alterations only to provide tenant fitout for a new Retail Limited Food Store dba. Starbucks at unit #161 at this existing commercial Building 1 - Oakridge Mall Centre. Scope of work includes some demolition, construct new interior partition walls, casework, equipment, finishes, electrical, mechanical and plumbing work. TENANT: Starbucks Coffee Canada · $200,000
    no contractor listed
    Issued
  133. 2019-08-21 #519 - 650 W 41ST Ave To provide interior and exterior alterations and change of use from preschool to Library in this existing commercial building for a limited period of time expiring December 31, 2023, unless extended in writing by the Director of Planning. It is the applicant's responsibility to request an extension prior to the expiry date. Scope of work: remove interior walls, washroom, add new interior walls create 2 staff rooms, closet, storage, staff washroom. Note: Energy trigger not required; BOMA BESt building. · $20,000
    City Wide Building Inc
    Issued
  134. 2019-08-20 #295 - Interior alterations to provide tenant improvements to this existing retail space in this existing mall (Oakridge Mall) Scope of work to include: Removing all old mill work and interior walls. New interior walls built for new change rooms. Installing new cabinetry for clothing racks and cashier station. Existing bathroom to remain. OK For Field Review as per City staff.2019 DBI to determine on site if any Schedules are required Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016) · $225,000
    no contractor listed
    Issued
  135. 2019-08-14 Building Permit for BP-2019-02923 To allow salvage and abatement of hazardous materials for Phase I North.
    no contractor listed
    Issued
  136. 2019-08-08 #251 - mall Interior alterations to provide tenant improvements for a new Retail tenant on the ground level (#251) of this existing commercial building. Scope of work: demo all doors, walls, finishes, and install new partitions, bathroom, millwork, shelving, RCP, finishings, lighting. Tenant: Swarovski North America OK for field review as per City staff. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $100,000
    no contractor listed
    Issued
  137. 2019-06-10 #221 Interior alterations to provide improvements for new Retail Store tenant in this existing commercial building. Scope of work: install new interior partitions, plumbing, electrical, lighting, mechanical, and millwork fixtures OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) · $500,000
    no contractor listed
    Issued
  138. 2019-06-10 Building Permit for BP-2018-04741 Civil works on Oakridge property to reroute services including temporary storm line installation, sanitary services, water meter relocation, etc. · $4,004,560
    no contractor listed
    Issued
  139. 2019-05-13 CRU #250 (mall) Interior alterations to provide tenant improvements for a new retail tenant on the ground level (CRU#250) of this existing commercial building on this site. Scope of work includes : remove partition walls and millwork, new partition walls and doors, and electrical work. * DBI to determine if a Sprinkler Permit is required. New tenant : Blue Ruby (relocated from cru#437) · $15,000
    no contractor listed
    Issued
  140. 2019-05-06 Interior alterations to an existing Presentation Centre (similar to General Office) to expand the existing space from 2584 square meters to 2751 square meters at this existing commercial building on this site. Related to: DP-2018-00412, BP-2018-02407 and DP-2019-00274. Okay for Field Review per City staff · $80,000
    City Wide Building Inc
    Issued
  141. 2019-04-29 Exterior and interior Alteration and change of major occupancy: Exterior and interior alterations to provide tenant improvements and change of major occupancy from auditorium to retail with ancillary pharmacy to unit #507 on the mall level of this existing Oakridge mall commercial Building. Note: This application is being reviewed under VBBL 2014. · $425,000
    no contractor listed
    Issued
  142. 2019-04-09 Unit #253 Including the letter of operation submitted by Joseph Wu, dated March 19, 2019 (for esthetic treatments/services), to permit interior alterations for tenant improvements for a new Retail Store with ancillary Beauty and Wellness Centre use in Oakridge Centre Mall. Scope of work includes interior demolition and new partitions, electrical, HVAC, plumbing, and sprinkler work. OK for Field Review as per City staff. · $180,000
    Final Choice Construction Inc
    Issued
  143. 2019-03-15 #169-Ground floor (Mall) Interior alterations to change of use from retail use to financial institution for a new office tenant (Scotia Bank) in this existing commercial building on this site. Scope of work: new tenant fit-out including new interior walls, glazing, doors, finishes, fixtures, millwork, one washroom, lighting, electrical, mechanical, plumbing and sprinkler work. · $710,000
    no contractor listed
    Issued
  144. 2019-03-01 #507 Interior non load-bearing demolition only for unit #507 in this existing building. Remaining unit will be SHELL SPACE ONLY. Separate permits will be required for future tenant improvements. · $120,000
    no contractor listed
    Issued
  145. 2019-02-27 #121 Interior alterations to provide improvements for new Retail Store tenant in this existing commercial building. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016) Rev. #1: - Less demo of walls and ceilings and less new drywall dropped ceiling - Keep existing T-bar ceiling - tying one new sink into existing piping in existing storage/washroom - adding new power supplies for display cabinets and adding one ceiling recessed light · $302,500
    GBS Construction Managers Inc
    Issued
  146. 2019-02-15 #115 - Mall Interior alterations to provide improvements for a new retail tenant in CRU #115 (relocated from #453) in this commercial building (Oakridge Mall) on this site. Scope of work: remove existing partition walls, millwork, finishes, (washroom and back door to remain). Construct new walls, millwork, ceiling, finishes, lighting, sprinkler alt to change layout. REVISION #1 - the following changes have been noted. May16/19 mk - Remove proposed VIP room and office to increase retail area. - Relocate coffee bar and lunch room and adjust related ceiling. ******************************************* OK for field review as per City staff · $500,000
    no contractor listed
    Issued
  147. 2019-02-12 #279 Interior alterations to provide tenant improvements to #279 for the existing relocated retail space in this existing commercial building. Scope of work: - remove existing interior walls and doors, carpet flooring, ceiling elements, metal wall fixtures - install new interior partitions, electrical, lighting, mechanical, and millwork fixtures · $280,000
    no contractor listed
    Issued
  148. 2019-01-22 #261 To change of use from retail to financial institution, and interior alterations for new financial institution tenant unit 261 on second floor of this existing commercial building. · $250,000
    no contractor listed
    Issued
  149. 2019-01-22 #279 Interior alterations to remove interior partitions, ceiling and lighting in this existing retail unit to create a shell unit in this existing commercial/residential building. Additional permit(s) required for any new work. Ok for field review per City staffil SHELL SPACE ONLY. Separate permit(s) are required prior to any future tenant improvements and/or occupancies.**** · $20,000
    Renaissance Facility Maintenance Ltd
    Issued
  150. 2019-01-18 Unit #165 & 169 - 650 W 41st Avenue Interior alterations to demolish all existing interior partition walls, doors, ceiling, finishes and millwork in this existing Retail space (units #165 & 169) and To demise the interior partition wall between units #165 & 169, thereby creating one large Retail (Shell) space (unit #169) in this existing commercial building on this site. OK for Field Review as per City staff. · $65,355
    no contractor listed
    Issued
  151. 2019-01-18 Unit #221 & 225 - 650 W 41st Avenue Interior alterations to demolish all existing interior partition walls, doors, ceiling, finishes and millwork in this existing Retail space (units #221 & 225) and To demise the interior partition wall between units #221 & 225, thereby creating one large Retail (Shell) space (unit #221) in this existing commercial building on this site. OK for Field Review as per City staff. · $76,283
    no contractor listed
    Issued
  152. 2019-01-04 Enabling works Interior and exterior alterations to the existing mall including: - reconfiguration of mall corridors; - reconfiguration of parking and loading spaces/access on Level P1; - new exit stairs at required locations for exiting; - relocation of a portion of the existing food court; and - addition of a temporary entrance along Cambie Street. The grease interceptor has been removed from this Building Permit application and will be submitted as part of the Tenant Improvement application. Revision 1 (issued July 18, 2019) includes: · $44,976,445
    no contractor listed
    Issued
  153. 2018-11-30 CRU #255- Level 1 (Mall) Interior alterations to provide tenant improvements for a new retail tenant in unit #255 (relocating from #441) in this commercial building (Oakridge Mall) on this site. Scope of work: No demolition of partition walls proposed. New partition added to extend a wall and new door, new fixed shelving, lighting, millwork, finishes. No changes to sprinklers (* Special Sprinkler Inspection REQUIRED) TENANT: Papyrus OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016) · $12,000
    Black Dog Projects Ltd
    Issued
  154. 2018-11-28 #257-Level 1 (Mall) Interior alterations only to provide improvements for a new retail tenant in unit #257 (relocating from #221) in this commercial building (Oakridge Mall) on this site. Scope of work: Demolition of the existing storefront, floor finishes, interior partition walls, millwork and ceiling. New partition added to extend a wall, new door, glazing, ceiling, cabinetry, lighting, electrical work. No changes to sprinklers (Special Sprinkler Inspection or Sprinkler permit is required). All existing CRU demising walls to remain. Tenant: Groupe Birks Inc. · $200,000
    no contractor listed
    Issued
  155. 2018-11-21 #218-Level 2 *Oakridge Mall* Interior alterations only and change of use from Retail Store at Level 2 to General Office for a construction field office at unit #218 at this existing Building #1 - Oakridge Mall. Scope of work includes construction of full height partition walls to enclose the Site Office and provide private office spaces, construction fencing will set the perimeter of the trade worker lunch area, all original sprinklers, pull stations, emergency lighting, exit signs remain with no alterations. No plumbing or washrooms in the space. DP-2018-00412 is approved for a General Office for a temporary sales presentation centre on Level 1 at unit #218. OK to process DB change of use with a flat rate of $928 as per City staff. OK for field review with no Site Plan required as per City staff. Energy upgrade exempt: Temporary construction office. · $8,500
    PCL CONSTRUCTORS WESTCOAST INC
    Issued
  156. 2018-11-16 #261-Level 1 *Oakridge Mall* Interior alterations only to provide for the demolition of the existing storefront, floor finishes, interior partition walls, ceiling, and water closet. Related electrical/plumbing reverts back to shell state. All existing CRU demising walls to remain. All sprinklers to remain as is (no alterations). All existing life safety and emergency lighting to remain at this existing unit #261 at this existing Building #1 - Oakridge Mall. OK for SIPS with no Site Plan drawing required as per City staff. Separate permit(s) and ASHRAE checklist required for any future tenant improvements to this space. Energy upgrade exempt: Interior demolition. Related to enabling scope of work under BP-2018-04741. · $21,500
    PCL CONSTRUCTORS WESTCOAST INC
    Issued
  157. 2018-10-11 #201 Interior alterations to provide improvements for new retail tenant at unit 201 in this existing commercial building. · $250,000
    no contractor listed
    Issued
  158. 2018-09-27 #304-3rd floor Interior alterations to provide improvements to this existing health care office tenant at #304 on the third floor of this commercial building on this site. Scope of work: demolish/construct partition walls, door changes, new door, ceiling work, new finishes, electrical and sprinkler work. TENANT: Colin Lau dba Sound idEARS inc. OK for field review per City staff. Note: Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $30,000
    Space in Time Project Management Ltd
    Issued
  159. 2018-08-14 To construct two high voltage electrical service rooms in the existing parkade. · $1,790,000
    PCL CONSTRUCTORS WESTCOAST INC
    Issued
  160. 2018-07-17 Building Permit for DP-2018-00412 To change the use from Retail Store to General Office for a temporary sales presentation centre (similar to general office under zoning) for a limited period of time expiring July 8th, 2017, unless extended in writing by the Director of Planning, and also interior alterations to consolidate two unit previously demised under BU467209 into one unit and enclose the elevator to separate ground and second floor, and to create a display bathroom and kitchen on the ground floor of this existing commercial building. Related to DP-2018-00412 Conditions: (1) The proposed presentation centre is approved for a limited period of time expiring May 3rd, 2019 unless extended in writing by the Director of Planning. (2) All mock-up display suite walls, kitchen equipment, and plumbing fixtures are to be removed on or before the expiry date or at the time the tenant vacates the building. (3) The display kitchen and bathroom fixtures are NON-WORKING fixtures only (not to be plumbed). · $906,000
    City Wide Building Inc
    Issued
  161. 2018-07-13 Oakridge Center Shopping Mall Exterior alterations to provide washrooms mechanical upgrade. Scope of works include to install a rooftop unit on the rooftop parkade and to provide 3 built out mechanical chases inside male & female washrooms OK for field review as per City staff Notes: · $150,000
    no contractor listed
    Issued
  162. 2018-06-13 #135 Interior Alterations to change of use from Office to Retail Store unit CRU#135 ground floor of this existing mall Building on this site. Work includes new light fixtures, framing, drywall ceiling, new storefront, mill work, and flooring. OK for field review per City staff: L2 - Lighting - Upgrade all hard wired Lighting within an occupied space to High Efficiency light systems. · $70,000
    Gocan Contracting Ltd
    Issued
  163. 2018-01-30 Mall - unit #424K Interior alterations to remove an existing (lotto) kiosk and replace with a new kiosk in the same location, on the ground floor (unit #424K) of this existing commercial building on this site. OK for field review per City staff. Note: Energy trigger exempt, tenant equipment. · $85,000
    Signature Editions Millwork Inc
    Issued
  164. 2018-01-30 Mall - unit #K2 Interior alterations to remove an existing (lotto) kiosk and replace with a new kiosk in the same location, on the ground floor (unit #K2) of this existing commercial building on this site. OK for field review per City staff. Note: Energy trigger exempt, tenant equipment. · $85,000
    Signature Editions Millwork Inc
    Issued
  165. 2017-12-06 Building Permit for DP-2016-00209 To change the use and major occupancy from 14 parking spaces (Group F3) to Motor Vehicle Wash (Group F3) on parking level 1 in this existing mixed used commercial building (Oakridge Center) on this site. Proposed work includes installation of a wire-link fence around a oil water separator, sump pump, and receptacle drums. Building Review Branch Notes: 1. The oil water separator and sump pump will be secured to the parking slab. 2. Approval for this Tenant only, should a new Tenant occupy this space, operation to be reviewed prior to license clearance. Permit Amendment #1- 2018-01-09- S.Le Alterations to the drawing plans to include a berm as per City staff catch basin. Catch basin to be equipped with a sand trap and connected to the oil water separator. · $5,000
    no contractor listed
    Issued
  166. 2017-04-12 CRU #447-Level 1 (Mall) Interior alterations to provide tenant improvements for a new Retail Store at CRU #447 in Oakridge Center Shopping Mall at this existing commercial building on this site. Scope of work: demolish partition walls, remove storefront, glazing, roll-down grill, new partition walls, storefront, millwork, drop ceiling, lighting, finishes, convenience washroom, staff kitchen area, electrical, plumbing, mechanical, sprinkler work. TENANT: Marc Cain Canada · $400,000
    no contractor listed
    Issued
  167. 2017-04-06 (#270) Interior alterations to existing retail cru on the main floor to provide improvements for existing retail tenant in this existing commercial/residential building. Scope includes new sprinkler, HVAC, and lighting layout, and new sink, finishes and millwork. Ok for field review per City staff: A/B (Arch) by Simona Sund, Arch.- [contact removed] · $215,000
    no contractor listed
    Issued
  168. 2017-04-05 Voluntary upgrade of existing fire alarm system in this existing tenant space (#2 Safeway). This FAS upgrade is limited to the replacement of control unit, annunciator and all field devices without altering the existing wiring and outlet boxes. This permit has been issued based on item #3 of Bulletin 2006-004-BU/EL. · $5,000
    no contractor listed
    Issued
  169. 2017-03-30 CRU #265-Level 1 (Mall) Interior alterations for an existing retail tenant (Swarovski) in this existing commercial building to provide improvements by relocating a partition wall and replacing fixtures, fittings and surfaces. Scope of work includes demolition/construction of partition walls, new storefront wall, new glazed storefront, glazed door, ceiling, millwork, lighting, finishes, removal of convenience washroom, mechanical, electrical, plumbing and sprinkler work. TENANT: Paul O'Leary (Swarovski) Ok for field review per City staff · $200,000
    no contractor listed
    Issued
  170. 2017-03-10 (#286-Mall Level) Interior alterations to provide tenant improvements for existing retail tenant on the mall level and to combine units #285 and #286; retaining #286 of this existing Oakridge mall commercial building. Scope of work includes demolition/construction of partition walls/doors, relocate new washroom and kitchen, demolition of existing interior storefront and replace with new, finishes, new fitting rooms, electrical, plumbing, sprinkler work. Tenant: Hugo Boss Canada · $300,000
    no contractor listed
    Issued
  171. 2017-02-17 Interior alterations to replace the existing fire alarm panel for The Bay in the existing Oakridge mall building on this site. This FAS upgrade is limited only to the replacement of control unit for the existing fire alarm system without altering the existing wiring and existing outlet boxes. This permit has been issued based on item #3 of Bulletin 2006-004-BU/EL. OK for SIPs without drawings per City staff. · $5,000
    City Spark Electrical Ltd
    Issued
  172. 2017-02-14 (#457) Including the letter of operation submitted by Joseph Wu, dated Jan 24, 2017 (for esthetic treatments/services), to permit interior alterations for tenant improvements for a new Retail Store with ancillary Beauty and Wellness Centre use in Oakridge Centre Mall. Scope includes interior demolition and new partitions, electrical work, HVAC and plumbing. OK for field review as per City staff. Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $150,000
    no contractor listed
    Issued
  173. 2017-01-13 Interior alterations to provide improvements for this existing retail tenant at unit #237 on the Mall level at this existing Oakridge Mall commercial building. Tenant: Harry Rosen Inc OK for field review per City staff. · $835,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Oakridge

1079 W 46TH Av
Interior alterations to change the use from Single Detached House to Single Detached House with Secondary Suite. OK for field review by Jamie Z. on Sept 21, 2026 Note: · KHY Contracting Inc
2026-11-05
6891 Laurel St
To Construct a Multiple Dwelling "Multiplex" with two three storey 2-unit front buildings and two two-storey 1-unit rear buildings with 5 surface parking spaces having access from the lane. The permit is for building 4. 1. BP-2025-01648 - NE Front Building (2 units) - $767,000 2. BP-2025-01649 - SE Front Building (2 units) - $767,000 3. BP-2025-01650 - SW Rear Building (1 unit) - $383,000 4. BP-2025-01651 - NW Rear Building (1 unit) - $383,000 Related DP: DP-2024-01051 ******THIS PERMIT HAS BEEN REVIEWED & ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 AND AMENDMENT EFFECTIVE FEBRUARY 27, 2025 ******** Building Review Branch Notes: 1.\tThis lot is NOT Stratified. 2.\tSch B- STR & GEO are submitted. 3.\tAll dwelling units have separate exterior entrances. 4.\tEntire building to be sprinkler to NFPA 13D requirement. 5.\tAll new windows, doors, and skylights shall conform to AAMA/WDMA/CSA101/I.S.2/A440, NAFS. · MANAV Developments Inc
2026-11-02
6891 Laurel St
To Construct a Multiple Dwelling "Multiplex" with two three storey 2-unit front buildings and two two-storey 1-unit rear buildings with 5 surface parking spaces having access from the lane. This permit is for site and building 1. 1. BP-2025-01648 - NE Front Building (2 units) - $767,000 2. BP-2025-01649 - SE Front Building (2 units) - $767,000 3. BP-2025-01650 - SW Rear Building (1 unit) - $383,000 4. BP-2025-01651 - NW Rear Building (1 unit) - $383,000 Related DP: DP-2024-01051 ******THIS PERMIT HAS BEEN REVIEWED & ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 AND AMENDMENT EFFECTIVE FEBRUARY 27, 2025 ******** Building Review Branch Notes: 1.\tThis lot is NOT Stratified. 2.\tSch B- STR & GEO are submitted. 3.\tAll dwelling units have separate exterior entrances. 4.\tEntire building to be sprinkler to NFPA 13D requirement. 5.\tAll new windows, doors, and skylights shall conform to AAMA/WDMA/CSA101/I.S.2/A440, NAFS. · MANAV Developments Inc
2026-11-02
Something wrong on this page? Tell us and we'll check it against the City's records.