Permit GopherAlberta and B.C. property, permit and zoning records

633 W King Edward Av, Vancouver

An address in South Cambie, Vancouver, zoned CD-1 (660) (Comprehensive Development). 9 building permits are on file, most recently “CONSTRUCTION of a new two-storey townhouse block (three units) at the back over one level…” (issued 6 March 2018). The City's 2026 assessed value for the 32 accounts at this address is $44,377,000.

Zoning
CD-1 (660) · Comprehensive Development
Neighbourhood
South Cambie
Permits on file
9
Assessed value (2026)
$44,377,000
32 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 633 W King Edward Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150674, 549 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
549
Households
230
Median age
39.6
Median household income (2020)
$154,000
Own their home
76%
Vancouver: 45%
Average household size
2.6
Under 15
14%
65 and over
14%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2018-03-06 CONSTRUCTION of a new two-storey townhouse block (three units) at the back over one level of underground parking accesses from the lane. Sub-permit of BP-2016-01795 Stage# 1 - Excavation and shoring only- issued 2017 Oct.20 Stage# 2 - full structural work up to roof - issued 2017 Nov.29 Stage #3 - Full construction - issued 2018 Mar.06 Building 1 - Front apartment building - BP-2018-00429 Building 2 - Rear townhouse building - BP-2018-00430 See BP-2016-01795 for details
    Aragon Construction Management Corporation
    Issued
  2. 2018-03-06 CONSTRUCTION of a new four-storey residential building over one level of underground parking accesses from the lane. Sub-permit of BP-2016-01795 Stage# 1 - Excavation and shoring only- issued 2017 Oct.20 Stage# 2 - full structural work up to roof - issued 2017 Nov.29 Stage #3 - Full construction - issued 2018 Mar.06 Building 1 - Front apartment building - BP-2018-00429 Building 2 - Rear townhouse building - BP-2018-00430 See BP-2016-01795 for details
    Aragon Construction Management Corporation
    Issued
  3. 2017-11-29 CONSTRUCTION of a new four-storey residential building with a two-storey townhouse block (three units) at the back over one level of underground parking accesses from the lane. This permit has been issued for all site work and below grade facilities including 1 levels common underground parking for the propose development: Stage# 1 - Excavation and shoring only- issued 2017 Oct.20 Stage# 2 - full structural work up to roof - issued 2017 Nov.29 Stage #3 - Full construction - issued 2018 Mar.06 Building 1 - Front apartment building - BP-2018-00429 Building 2 - Rear townhouse building - BP-2018-00430 Revision #1 - Add 3 windows on the 2 level townhouses - issued 2019 Jan. 18 Revision # 2 - conversion of a mechanical room to storage and alterations to the landscape plan as approved per DP-2019-00882 - issued 2019-11-19 · $8,088,000
    Aragon Construction Management Corporation
    Issued
  4. 2017-09-01 To demolish the existing one family dwelling building ($15,000) on this site by means of deconstruction. Demo Declaration – Aragon Construction Management Corp [contact removed] This permit is subject to the Green Demolition Bylaw (11023) Note: Recycling requirement: 75% of non-hazardous construction waste The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. Reference to: DB-2017-02379, S&A BP-2017-02389 DB-2017-02382, S&A BP-2017-02390 DB-2017-02384, S&A BP-2017-02391 · $15,000
    Hans Demolition and Excavating Ltd.
    Issued
  5. 2017-08-28 To demolish the existing one family dwelling building ($15,000) on this site by means of deconstruction. Demo Declaration – Aragon Construction Management Corp [contact removed] This permit is subject to the Green Demolition Bylaw (11023) Note: Recycling requirement: 75% of non-hazardous construction waste The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. Reference to: DB-2017-02379, S&A BP-2017-02389 DB-2017-02382, S&A BP-2017-02390 DB-2017-02384, S&A BP-2017-02391 · $15,000
    Hans Demolition and Excavating Ltd.
    Issued
  6. 2017-08-28 To demolish the existing one family dwelling building ($15,000) on this site by means of deconstruction. Demo Declaration – Aragon Construction Management Corp [contact removed] This permit is subject to the Green Demolition Bylaw (11023) Note: Recycling requirement: 75% of non-hazardous construction waste The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. Reference to: DB-2017-02379, S&A BP-2017-02389 DB-2017-02382, S&A BP-2017-02390 DB-2017-02384, S&A BP-2017-02391 · $15,000
    Hans Demolition and Excavating Ltd.
    Issued
  7. 2017-07-13 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Reference to: DB-2017-02379, S&A BP-2017-02389 DB-2017-02382, S&A BP-2017-02390 DB-2017-02384, S&A BP-2017-02391
    Aragon Construction Management Corporation
    Issued
  8. 2017-07-13 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Reference to: DB-2017-02379, S&A BP-2017-02389 DB-2017-02382, S&A BP-2017-02390 DB-2017-02384, S&A BP-2017-02391
    Aragon Construction Management Corporation
    Issued
  9. 2017-07-13 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Reference to: DB-2017-02379, S&A BP-2017-02389 DB-2017-02382, S&A BP-2017-02390 DB-2017-02384, S&A BP-2017-02391
    Aragon Construction Management Corporation
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in South Cambie

3278 Heather St
Exterior alterations for building envelope repairs to this existing multiple dwelling building on this site. Scope of work includes: - Replacing the existing balcony guardrails with a fully face-mounted system - Replacing deteriorated wood trim and siding - Replacing the asphalt shingles on the mansard roof with new fibre-cement cladding Notes: 1. Exterior work only. 2. No interior or electrical work proposed. · no contractor listed
2026-11-03
555 W 19TH Av
To demolish this existing single detached house (1928)(40,000.00) on this site (declared non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit(s): DP-2026-00487, BP-2026-01980, and BP-2026-01981 ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** •\tThis permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. · Mainline Excavation Ltd
2026-10-29
555 W 19TH Av
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in stairs to second floor. · BLUEPOINT VENTURES LTD.
2026-10-29
Something wrong on this page? Tell us and we'll check it against the City's records.