5755 Oak St, Vancouver

An address in Oakridge, Vancouver, zoned CD-1 (874) (Comprehensive Development). 6 building permits are on file, most recently “To construct a mixed-use building consisting of two towers (North Tower, 26 storey & Sout…” (issued 24 April 2025). The City's 2026 assessed value is $49,448,000.

Zoning
CD-1 (874) · Comprehensive Development
Neighbourhood
Oakridge
Permits on file
6
Assessed value (2026)
$49,448,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 5755 Oak St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150550, 641 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
641
Households
225
Median age
41.6
Median household income (2020)
$98,000
Own their home
69%
Vancouver: 45%
Average household size
2.8
Under 15
16%
65 and over
20%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-04-24 To construct a mixed-use building consisting of two towers (North Tower, 26 storey & South tower, 18 storey) connected with an 8 storey podium. The building contains 2 retail units (Drug Store and Retail Store) and 361 residential units and one (1) guest suite. The project consists of following components: PODIUM: 8 storey (7-Level Z/D Bylaw) Podium: Level 1 - CRU’s, residential lobbies garbage & recycle room, Level 1-Upper- Bike rooms, and storage space for the retail at 5725 Oak St. Level 2 - Residential suites and amenity multi purpose room, fitness center Levels 3 to 6 - Residential suites Level 7 - Residential suites, indoor amenity & rooftop amenity Two Towers: Levels 8 to 17- Residential suites Levels 18 to 25 – residential suites in North Tower only, all over 3 levels of underground parking. This building is equipped with radio antenna system. VBBL2019 Stage 1 (E & S) issued - 26-Sep-2024 Stage 2 (Full permit) issued - 24-Apr-2025 · $111,993,200
    Wesgroup Contracting Ltd
    Issued
  2. 2024-12-06 To demolish this commercial building to grade. Demo Contractor: Oriol Torres of [name withheld] 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $250,000
    applicant withheld (individual)
    Issued
  3. 2024-09-18 Salvage & Abatement Permit for BP-2024-02358 To demolish this commercial building to grade. QP: Harvey Wong of Kinetic OHS Services LTD
    applicant withheld (individual)
    Issued
  4. 2019-02-14 5771 Oak Street Interior alterations and a change of use from Beauty and Wellness Center to a Temporary Sales Office (Presentation Center) including a display suite and vignette kitchen at 5771 Oak Street on the ground floor of this commercial building on this site. OK for DB per City staff. OK for field review per City staff. · $10,000
    Vanwell Homes Ltd
    Issued
  5. 2017-08-31 To demolish this existing Chevron Split Island Gas Station building and fueling system at this site. OK for field review without plans as per City staff. · $125,000
    Colt Construction Ltd
    Issued
  6. 2017-08-18 Alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Chevron Split Island Gas Station building and fueling system at this site. A separate building permit is required to demolish or deconstruct the building. OK for SIPS processing without plans as per City staff. Abatement QP: Tricia Drover (c/o Enviro Vac), [contact removed]
    Colt Construction Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Oakridge

5750 Cambie St
# 480 - 5750 Cambie St Interior alterations to combine the two existing office units #480 and #485 into one new Unit # 480 and provide tenant improvements for a Health Care Office on the 4th floor of this existing mixed-use building on this site. Ok for BP - field review per City staff: Dr. Rui Chen Inc. dba. ACE Health Care · no contractor listed
2026-10-22
133 W 49TH Av
Interior alterations to provide first tenant improvements to this existing Retail space for a retail limited food service tenant on the ground floor of this existing mixed-use building on this site. · no contractor listed
2026-10-15
6850 Heather St
To demolish this existing single detached house (1958) on the site ($45,000). Declared non rental • This demolition permit also permits abatement work to be completed to WorkSafe standards. • Demo to grade only. No soil disturbance or excavation of soil other than that which is incidental to the demolition is permitted under this permit. • Hazardous Building Materials Report Form signed by the QP, WorkSafeBC compliant Hazardous Materials Inspection Report, and WorkSafeBC compliant Post-Abatement Inspection Report must be submitted prior to calling for the Notice of Demolition This demolition was reviewed under VBBL 2025. · Knight Demolition & Excavation Ltd
2026-10-09