Permit GopherAlberta and B.C. property, permit and zoning records

5656 Fraser St, Vancouver

An address in Kensington-Cedar Cottage, Vancouver, zoned C-2A (Commercial). 3 building permits are on file, most recently “To construct a 6-storey mixed-use building consisting of: 1st storey & mezzanine - animal…” (issued 10 September 2024). The City's 2026 assessed value is $3,549,000.

Zoning
C-2A · Commercial
Neighbourhood
Kensington-Cedar Cottage
Permits on file
3
Assessed value (2026)
$3,549,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 5656 Fraser St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150386, 614 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
614
Households
175
Median age
40
Median household income (2020)
$88,000
Own their home
60%
Vancouver: 45%
Average household size
3.0
Under 15
15%
65 and over
19%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2024-09-10 To construct a 6-storey mixed-use building consisting of: 1st storey & mezzanine - animal clinic (Group D - shell only) 2nd storey - animal clinic (Group D - shell only) interconnected w/ 1st storey; indoor & outdoor amenities 3rd to 6th storeys - 15 dwelling units all over 3 levels of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of the VBBL 2019. 2. A radio antenna system is required. 3. One 2-hr vertical shaft is proposed from the ceiling of ground floor CRU to the roof. Duct and exhaust fan will be installed by future tenant. STAGED CONSTRUCTION STAGE I: Excavation & Shoring (S.Yoo) ISSUED: Oct. 26, 2022 REVISION I: Revisions to Excavation & Shoring Drawings (S.Yoo) ISSUED: Jun. 21, 2023 STAGE II: Foundation to Grade (S.Yoo) ISSUED: Jun. 21, 2023 STAGE III: Full Construction (S.Yoo) ISSUED: Sept. 10, 2024 REVISION II: Vertical Addition of 2 Storeys, Increasing the Total Number of Storeys from 4 to 6 (adding 8 dwelling units for a total of 15), per City staff(S.Yoo) ISSUED: Feb. 19, 2026 REVISION III: Change of General Contractor (S.Yoo) ISSUED: Mar. 24, 2026 · $11,020,000
    Dhaliwal and Bhullar Premium Homes Ltd.
    Issued
  2. 2022-04-13 To demolish this existing restaurant building on the site. OK for Sips per City staff: 1) The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 2) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $50,000
    Bhullar Excavating and Demolition
    Issued
  3. 2022-04-04 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing commercial building Related Demo BP-2021-05253 QP is Ramin Hamidnejad of Kenetic OHS Services Ltd. OK for Sips per City staff: This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please upload all documents digitally signed and sealed related to S/A using the City's electronic permitting system as per BULLETIN 2015-008-EV.
    Bhullar Excavating and Demolition
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Kensington-Cedar Cottage

1641 E 37TH Av
To demolish the existing single detached house ($40,000) on this site - declared non rental 75% green demo Demo to grade only. No soil disturbance or excavation of soil other than that which is incidental to the demolition is permitted under this permit. This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, Pre-1910 homes and pre-1950 heritage homes require demolition by means of deconstruction, resulting in the salvage of at least 3 tonnes of wood. Demo: N. Parsad - 1167245 BC Ltd QP: MCA Environmental Consulting Inc. (Tarlochan Sunar ) · no contractor listed
2026-10-28
1641 E 37TH Av
*****PART 5***** To construct a three-storey four-unit Multiple Dwelling "Multiplex" building with four surface parking spaces in the rear yard, having vehicular access from the lane. VBBL 2025 - NFPA 13D · Kang Bros Holdings Ltd
2026-10-28
4375 Ross St
Exterior alterations to add a new roof cover over the existing deck at the rear of the second floor of this existing single detached house on this inside with lane site as approved by the Board of Variance Appeal Z36309 dated March 10, 2026, thereby overturning the decision of the Director of Planning and relaxing the overall floor area to 2,593sf. Related to Issued DP-2025-00980 Full-height privacy screen to be installed on the south elevation. · no contractor listed
2026-10-26
Something wrong on this page? Tell us and we'll check it against the City's records.