Permit GopherAlberta and B.C. property, permit and zoning records

5630 Heather St, Vancouver

An address in South Cambie, Vancouver, zoned CD-1 (896) (Comprehensive Development). 6 building permits are on file, most recently “To demolish to grade this existing Single Detached House with Childcare Facilities (1960)…” (issued 9 October 2025). The City's 2026 assessed value is $14,841,000.

Zoning
CD-1 (896) · Comprehensive Development
Neighbourhood
South Cambie
Permits on file
6
Assessed value (2026)
$14,841,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 5630 Heather St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150543, 1,525 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,525
Households
635
Median age
35.2
Median household income (2020)
$83,000
Own their home
57%
Vancouver: 45%
Average household size
2.3
Under 15
13%
65 and over
18%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-10-09 To demolish to grade this existing Single Detached House with Childcare Facilities (1960) on the site. · $52,000
    MWL Demolition Ltd
    Issued
  2. 2025-10-09 To demolish to grade this existing Single Detached House (1958) on the site. · $52,000
    MWL Demolition Ltd
    Issued
  3. 2025-10-09 To demolish to grade this existing Single Detached House (1959) on the site. · $52,000
    MWL Demolition Ltd
    Issued
  4. 2025-08-22 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2025-02431. Issued separately
    MWL Demolition Ltd
    Issued
  5. 2025-08-22 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2025-02430. Issued separately
    MWL Demolition Ltd
    Issued
  6. 2025-08-22 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2025-02429. Issued separately
    MWL Demolition Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in South Cambie

555 W 19TH Av
To demolish this existing single detached house (1928)(40,000.00) on this site (declared non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit(s): DP-2026-00487, BP-2026-01980, and BP-2026-01981 ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** •\tThis permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. · Mainline Excavation Ltd
2026-10-29
555 W 19TH Av
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in court yard. Interior component located in exterior accessed mech. room below stairs to second floor. · no contractor listed
2026-10-29
555 W 19TH Av
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in stairs to second floor. · BLUEPOINT VENTURES LTD.
2026-10-29
Something wrong on this page? Tell us and we'll check it against the City's records.