Permit GopherAlberta and B.C. property, permit and zoning records

531 W 29th Av, Vancouver

An address in South Cambie, Vancouver, zoned RM-8A (Residential). 19 building permits are on file, most recently “To demolish this existing one family dwelling (1992) on this site. Notice of Demolition m…” (issued 3 December 2020). The City's 2026 assessed value for the 31 accounts at this address is $56,245,000.

Zoning
RM-8A · Residential
Neighbourhood
South Cambie
Permits on file
19
Assessed value (2026)
$56,245,000
31 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 531 W 29th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150672, 857 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
857
Households
375
Median age
36.8
Median household income (2020)
$99,000
Own their home
63%
Vancouver: 45%
Average household size
2.3
Under 15
10%
65 and over
18%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2020-12-03 To demolish this existing one family dwelling (1992) on this site. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition. This can be provided by requesting an inspection through your online account, or by calling 3-1-1 or [contact removed] outside Vancouver. · $20,000
    G & K Excavation and Demolition Services Ltd
    Issued
  2. 2020-12-01 To construct one - 3 storey containing 4 townhouse dwellings units. Building 8 (South/West - Front) Refer to BP-2019-03878 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    no contractor listed
    Issued
  3. 2020-12-01 To construct one - 3 storey containing 4 townhouse dwellings units. Building 7 (South - Front) Refer to BP-2019-03878 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    no contractor listed
    Issued
  4. 2020-12-01 To construct one - 2 storey containing 4 townhouse dwellings units. Building 6 (North/West - Rear) Refer to BP-2019-03878 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    no contractor listed
    Issued
  5. 2020-12-01 To construct one - 2 storey containing 4 townhouse dwellings units. Building 5 (North - Rear) Refer to BP-2019-03878 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    no contractor listed
    Issued
  6. 2020-12-01 To construct one - 2 storey containing 3 townhouse dwellings units. Building 4 (North - Rear) Refer to BP-2019-03878 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    no contractor listed
    Issued
  7. 2020-12-01 To construct one - 2 storey containing 3 townhouse dwellings units. Building 3 (North/East - Rear) Refer to BP-2019-03878 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    no contractor listed
    Issued
  8. 2020-12-01 To construct one - 3 storey containing 4 townhouse dwellings units. Building 2 (South - Front) Refer to BP-2019-03878 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    no contractor listed
    Issued
  9. 2020-12-01 To construct one - 3 storey containing 4 townhouse dwellings units. Building 1 (South/East - Front) Refer to BP-2019-03878 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis. STAGED CONSTRUCTION
    no contractor listed
    Issued
  10. 2020-12-01 To construct 8 new 2 / 3 storey residential groups/blocks of row townhomes, above a single level below grade basement storage garage project. Project will entail a total of 30 new multi-level row townhome dwelling units, within the noted 8 structures. VBBL 2014 - Reviewed during the 2020 pandemic crisis. Stage 1 - Excavation and Shoring issued on June 15th, 2020. Stage 2 - Full Construction issued on Dec. 1, 2020. · $14,025,000
    no contractor listed
    Issued
  11. 2020-11-09 To demolish this existing one family dwelling (1938) on this site. Recycling requirement 75% Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition. This can be provided by requesting an inspection through your online account, or by calling 3-1-1 or [contact removed] outside Vancouver. · $31,250
    G & K Excavation and Demolition Services Ltd
    Issued
  12. 2020-11-09 To demolish this existing one family dwelling (1938) on this site. Recycling requirement 75% Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition. This can be provided by requesting an inspection through your online account, or by calling 3-1-1 or [contact removed] outside Vancouver. · $31,250
    G & K Excavation and Demolition Services Ltd
    Issued
  13. 2020-11-09 To demolish this existing one family dwelling (1938) on this site. Recycling requirement 75% Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition. This can be provided by requesting an inspection through your online account, or by calling 3-1-1 or [contact removed] outside Vancouver. · $31,250
    G & K Excavation and Demolition Services Ltd
    Issued
  14. 2020-11-09 To demolish this existing one family dwelling (1939) on this site. Recycling requirement 75% Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition. This can be provided by requesting an inspection through your online account, or by calling 3-1-1 or [contact removed] outside Vancouver. · $31,250
    G & K Excavation and Demolition Services Ltd
    Issued
  15. 2020-08-25 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs per City staff
    Bold Construction Ltd
    Issued
  16. 2020-08-25 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs per City staff
    Bold Construction Ltd
    Issued
  17. 2020-08-25 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs per City staff
    Bold Construction Ltd
    Issued
  18. 2020-08-25 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs per City staff
    Bold Construction Ltd
    Issued
  19. 2020-08-25 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs per City staff
    Bold Construction Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in South Cambie

3278 Heather St
Exterior alterations for building envelope repairs to this existing multiple dwelling building on this site. Scope of work includes: - Replacing the existing balcony guardrails with a fully face-mounted system - Replacing deteriorated wood trim and siding - Replacing the asphalt shingles on the mansard roof with new fibre-cement cladding Notes: 1. Exterior work only. 2. No interior or electrical work proposed. · no contractor listed
2026-11-03
555 W 19TH Av
To demolish this existing single detached house (1928)(40,000.00) on this site (declared non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit(s): DP-2026-00487, BP-2026-01980, and BP-2026-01981 ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** •\tThis permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. · Mainline Excavation Ltd
2026-10-29
555 W 19TH Av
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in stairs to second floor. · BLUEPOINT VENTURES LTD.
2026-10-29
Something wrong on this page? Tell us and we'll check it against the City's records.