Permit GopherAlberta and B.C. property, permit and zoning records

528 W King Edward Av, Vancouver

An address in South Cambie, Vancouver, zoned CD-1 (640) (Comprehensive Development). 8 building permits are on file, most recently “To construct a new 2 storey Multiple Dwelling-townhouse building (Building 2) at rear of …” (issued 16 May 2018). The City's 2026 assessed value for the 71 accounts at this address is $64,841,000.

Zoning
CD-1 (640) · Comprehensive Development
Neighbourhood
South Cambie
Permits on file
8
Assessed value (2026)
$64,841,000
71 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 528 W King Edward Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150673, 946 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
946
Households
460
Median age
34.4
Median household income (2020)
$93,000
Own their home
59%
Vancouver: 45%
Average household size
2.1
Under 15
11%
65 and over
14%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2018-05-16 To construct a new 2 storey Multiple Dwelling-townhouse building (Building 2) at rear of site consisting of 4 units all over of 2 levels of underground parking. The development will consist of one 6 storey 66 unit tower (Building 1) at the front and a block of four 2 storey townhouses (Building 2) at the rear of this site (total of 70 residential units). Related to BP-2017-01273 (Site Permit)
    Magil Construction Pacific Inc
    Issued
  2. 2017-10-24 To construct a new 70 unit multi-family strata residential development with two levels of underground parking. The development will consist of one 6-storey tower with a block of 2 storey townhouses. All fees for the entire development on this site applied against this permit. Related Building Permits: BP-2017-04245 - Building 1 ( 66 units, Multiple Dwelling building at front of site); primary building address - 528 W King Edward Av – residential lobby 1st – 6th storey BP-2017-04248 - Building 2 (4 units, Multiple Dwelling-townhouse building at rear of site); primary building address - 530 W King Edward Av. 24-Oct-2017 - Stage 1(excavation and shoring) issued. 11-Jan-2018 - Stage 2 (foundation to grade- structural only) issued. 16-May-2018 - Stage 3 (full construction) issued. · $18,250,000
    Magil Construction Pacific Inc
    Issued
  3. 2017-08-14 To demolish to grade this existing one-family dwelling (1985) on this site. Note: 1) 75% recycling as a condition of rezoning (no deposit); 2) DP to construct to be issued prior to issuance of demo permit; 3) TP-2017-00264 issued April 1, 2017; 4) No tree barriers required. · $30,000
    no contractor listed
    Issued
  4. 2017-08-14 To demolish to grade this existing one-family dwelling (1946) on this site. Note: 1) 75% recycling as a condition of rezoning (no deposit); 2) DP to construct to be issued prior to issuance of demo permit; 3) TP-2017-00264 issued April 1, 2017; 4) No tree barriers required. · $30,000
    no contractor listed
    Issued
  5. 2017-08-14 To demolish to grade this existing one-family dwelling (1945) on this site. Note: 1) 75% recycling as a condition of rezoning (no deposit); 2) DP to construct to be issued prior to issuance of demo permit; 3) TP-2017-00264 issued April 1, 2017; 4) No tree barriers required. · $30,000
    no contractor listed
    Issued
  6. 2017-04-18 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building.
    no contractor listed
    Issued
  7. 2017-04-18 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building.
    no contractor listed
    Issued
  8. 2017-04-18 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building.
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in South Cambie

3278 Heather St
Exterior alterations for building envelope repairs to this existing multiple dwelling building on this site. Scope of work includes: - Replacing the existing balcony guardrails with a fully face-mounted system - Replacing deteriorated wood trim and siding - Replacing the asphalt shingles on the mansard roof with new fibre-cement cladding Notes: 1. Exterior work only. 2. No interior or electrical work proposed. · no contractor listed
2026-11-03
555 W 19TH Av
To demolish this existing single detached house (1928)(40,000.00) on this site (declared non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit(s): DP-2026-00487, BP-2026-01980, and BP-2026-01981 ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** •\tThis permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. · Mainline Excavation Ltd
2026-10-29
555 W 19TH Av
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in stairs to second floor. · BLUEPOINT VENTURES LTD.
2026-10-29
Something wrong on this page? Tell us and we'll check it against the City's records.