Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
525 E 12th Av, Vancouver
An address in Mount Pleasant, Vancouver, zoned R3-2 (Residential). 2 building permits are on file, most recently “To construct a two-storey one-family Infill dwelling with an attached garage serving the …” (issued 6 February 2020). The City's 2026 assessed value is $2,079,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150726, 518 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2020-02-06
To construct a two-storey one-family Infill dwelling with an attached garage serving the infill and has vehicular access from lane. (and alter the rear of the existing Heritage 'B' Multiple Conversion Dwelling building containing two dwelling units, under separate permit) Building Review Branch Notes: - Building Permit for DP-2018-01024 - Infill building to be Sprinkler to NFPA 13D - $45k for main house alteration. - Reviewed as per VBBL 2014 Revision #1 (Adessa, March 4th, 2020) - Added 4 pages of structural drawing for main house rear deck alteration Revision #2 (Adessa, June 29th, 2020) - Revise wall assemblies and new pre-permit checklist submitted. Issued during 2020 pandemic crisis. · $450,000
Lanefab Design Build Ltd Issued -
2020-02-04
To alter the rear of the existing Heritage 'B' Multiple Conversion Dwelling building containing two dwelling units. Building Review Branch Notes: - Building Permit for DP-2018-01024 - Refer to main permit BP-2019-03680 for docs, fees, etc. - Exposing building face is not required to have a fire resistance rating if the building is sprinklered as per Table 11.5.1.1. The existing main house is sprinklered, refer to BU422174 Revision #1 (Adessa, March 4th, 2020) - Added 4 pages of structural drawing for main house rear deck alteration
Lanefab Design Build Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Mount Pleasant
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed2026-10-30
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.2026-10-30
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes2026-10-16