Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
520 W 28th Av, Vancouver
An address in South Cambie, Vancouver, zoned RM-8A (Residential). 23 building permits are on file, most recently “Building 8 - To Construct one - 3 storey multiple dwelling townhouse containing 11 dwelli…” (issued 25 January 2022). The City's 2026 assessed value for the 59 accounts at this address is $73,277,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150672, 857 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2022-01-25
Building 8 - To Construct one - 3 storey multiple dwelling townhouse containing 11 dwelling units. Refer to 2019-01517 for site work, below-grade facilities, and common underground parking. Stg 2 Rev 3 - (Dec. 6th, 2022) - To decrease from 12 Dwelling Units to 11 Dwelling Units. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
Intergulf Investment Corporation Issued -
2022-01-25
Building 7 - To Construct one - 3 storey multiple dwelling townhouse containing 8 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
Intergulf Investment Corporation Issued -
2022-01-25
Building 6 - To Construct one - 3 storey multiple dwelling townhouse containing 5 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
Intergulf Investment Corporation Issued -
2022-01-25
Building 5 - To Construct one - 3 storey multiple dwelling townhouse containing 5 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
Intergulf Investment Corporation Issued -
2022-01-25
Building 4 - To Construct one - 3 storey multiple dwelling townhouse containing 8 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
Intergulf Investment Corporation Issued -
2022-01-25
Building 3 - To Construct one - 3 storey multiple dwelling townhouse containing 8 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
Intergulf Investment Corporation Issued -
2022-01-25
Building 2 - To Construct one - 3 storey multiple dwelling townhouse containing 5 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
Intergulf Investment Corporation Issued -
2022-01-25
Building 1 - To Construct one - 3 storey multiple dwelling townhouse containing 8 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
Intergulf Investment Corporation Issued -
2021-10-13
To construct eight (8) multiple 3-storey dwelling townhouses; a total of fifty-eight (58) market dwelling units, over 1 level of underground parking having vehicular access connecting through adjacent site's underground parking and ramp from rear lane, including: (22) 1-bedroom units (L1 of stacked townhouses facing streets) (21) 2-bedroom units (L2+3 of stacked townhouses facings streets) (15) 3-bedroom units (rowhouses facing lane) Building 1 is under BP-2021-00194. Building 2 is under BP-2021-00195. Building 3 is under BP-2021-00196. Building 4 is under BP-2021-00197. Building 5 is under BP-2021-00198. Building 6 is under BP-2021-00199. Building 7 is under BP-2021-00200. Building 8 is under BP-2021-00201. VBBL 2014 - Reviewed during the 2020/21 pandemic crisis. STAGE 1 for Excavation & Shoring issued on Feb. 25, 2021. STAGE 1 - Rev. 1 - Excavation & Shoring to accommodate larger detention tank required for final rain water management plan issued on Apr. 21, 2021. STAGE 2 for Full Construction issued on Oct. 13th, 2021. STAGE 2 - Rev. 2 (Jan. 25, 2022)- Revised the Terms for this permit. STAGE 2 - Rev 3 (Dec. 6, 2022) - To combine two units into one unit for Building 8 and to decrease the total number of units from 59 to 58. · $12,836,467
Intergulf Investment Corporation Issued -
2021-07-27
To demolish this existing one-family dwelling building. This building has been assessed as being a Character pre 1950 house and will need to meet the green demo by-law with recycling requirements of 90%. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. The deconstruction shall be in accordance with the submitted "Recycling & Reuse Plan for Green Demolition & Wood Salvage" and to be confirmed through an acceptable "Recycling & Reuse Compliance Report for Green Demolition" with copies of recycling and disposal facility receipts. · $15,000
applicant withheld (individual) Issued -
2021-07-12
To demolish this existing one-family dwelling building. This building has been assessed as being a Character pre 1950 house and will need to meet the green demo by-law with recycling requirements of 90%. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. The deconstruction shall be in accordance with the submitted "Recycling & Reuse Plan for Green Demolition & Wood Salvage" and to be confirmed through an acceptable "Recycling & Reuse Compliance Report for Green Demolition" with copies of recycling and disposal facility receipts. · $15,000
applicant withheld (individual) Issued -
2021-07-12
To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
applicant withheld (individual) Issued -
2021-07-12
To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
applicant withheld (individual) Issued -
2021-07-12
To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
applicant withheld (individual) Issued -
2021-07-12
To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
applicant withheld (individual) Issued -
2021-07-07
To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
applicant withheld (individual) Issued -
2021-03-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
Kare Earthworks Ltd. Issued -
2021-03-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
Kare Earthworks Ltd. Issued -
2021-03-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
Kare Earthworks Ltd. Issued -
2021-03-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
Kare Earthworks Ltd. Issued -
2021-03-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
Kare Earthworks Ltd. Issued -
2021-03-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
Kare Earthworks Ltd. Issued -
2021-03-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
Kare Earthworks Ltd. Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in South Cambie
To demolish this existing single detached house (1928)(40,000.00) on this site (declared non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit(s): DP-2026-00487, BP-2026-01980, and BP-2026-01981 ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** •\tThis permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. · Mainline Excavation Ltd2026-10-29
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in court yard. Interior component located in exterior accessed mech. room below stairs to second floor. · no contractor listed2026-10-29
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in stairs to second floor. · BLUEPOINT VENTURES LTD.2026-10-29