Permit GopherAlberta and B.C. property, permit and zoning records

520 W 28th Av, Vancouver

An address in South Cambie, Vancouver, zoned RM-8A (Residential). 23 building permits are on file, most recently “Building 8 - To Construct one - 3 storey multiple dwelling townhouse containing 11 dwelli…” (issued 25 January 2022). The City's 2026 assessed value for the 59 accounts at this address is $73,277,000.

Zoning
RM-8A · Residential
Neighbourhood
South Cambie
Permits on file
23
Assessed value (2026)
$73,277,000
59 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 520 W 28th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150672, 857 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
857
Households
375
Median age
36.8
Median household income (2020)
$99,000
Own their home
63%
Vancouver: 45%
Average household size
2.3
Under 15
10%
65 and over
18%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2022-01-25 Building 8 - To Construct one - 3 storey multiple dwelling townhouse containing 11 dwelling units. Refer to 2019-01517 for site work, below-grade facilities, and common underground parking. Stg 2 Rev 3 - (Dec. 6th, 2022) - To decrease from 12 Dwelling Units to 11 Dwelling Units. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    Intergulf Investment Corporation
    Issued
  2. 2022-01-25 Building 7 - To Construct one - 3 storey multiple dwelling townhouse containing 8 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    Intergulf Investment Corporation
    Issued
  3. 2022-01-25 Building 6 - To Construct one - 3 storey multiple dwelling townhouse containing 5 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    Intergulf Investment Corporation
    Issued
  4. 2022-01-25 Building 5 - To Construct one - 3 storey multiple dwelling townhouse containing 5 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    Intergulf Investment Corporation
    Issued
  5. 2022-01-25 Building 4 - To Construct one - 3 storey multiple dwelling townhouse containing 8 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    Intergulf Investment Corporation
    Issued
  6. 2022-01-25 Building 3 - To Construct one - 3 storey multiple dwelling townhouse containing 8 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    Intergulf Investment Corporation
    Issued
  7. 2022-01-25 Building 2 - To Construct one - 3 storey multiple dwelling townhouse containing 5 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    Intergulf Investment Corporation
    Issued
  8. 2022-01-25 Building 1 - To Construct one - 3 storey multiple dwelling townhouse containing 8 dwelling units. Refer to 2019-01517 for site work, below grade facilities and common underground parking. VBBL 2014 - Reviewed during the 2020 pandemic crisis.
    Intergulf Investment Corporation
    Issued
  9. 2021-10-13 To construct eight (8) multiple 3-storey dwelling townhouses; a total of fifty-eight (58) market dwelling units, over 1 level of underground parking having vehicular access connecting through adjacent site's underground parking and ramp from rear lane, including: (22) 1-bedroom units (L1 of stacked townhouses facing streets) (21) 2-bedroom units (L2+3 of stacked townhouses facings streets) (15) 3-bedroom units (rowhouses facing lane) Building 1 is under BP-2021-00194. Building 2 is under BP-2021-00195. Building 3 is under BP-2021-00196. Building 4 is under BP-2021-00197. Building 5 is under BP-2021-00198. Building 6 is under BP-2021-00199. Building 7 is under BP-2021-00200. Building 8 is under BP-2021-00201. VBBL 2014 - Reviewed during the 2020/21 pandemic crisis. STAGE 1 for Excavation & Shoring issued on Feb. 25, 2021. STAGE 1 - Rev. 1 - Excavation & Shoring to accommodate larger detention tank required for final rain water management plan issued on Apr. 21, 2021. STAGE 2 for Full Construction issued on Oct. 13th, 2021. STAGE 2 - Rev. 2 (Jan. 25, 2022)- Revised the Terms for this permit. STAGE 2 - Rev 3 (Dec. 6, 2022) - To combine two units into one unit for Building 8 and to decrease the total number of units from 59 to 58. · $12,836,467
    Intergulf Investment Corporation
    Issued
  10. 2021-07-27 To demolish this existing one-family dwelling building. This building has been assessed as being a Character pre 1950 house and will need to meet the green demo by-law with recycling requirements of 90%. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. The deconstruction shall be in accordance with the submitted "Recycling & Reuse Plan for Green Demolition & Wood Salvage" and to be confirmed through an acceptable "Recycling & Reuse Compliance Report for Green Demolition" with copies of recycling and disposal facility receipts. · $15,000
    applicant withheld (individual)
    Issued
  11. 2021-07-12 To demolish this existing one-family dwelling building. This building has been assessed as being a Character pre 1950 house and will need to meet the green demo by-law with recycling requirements of 90%. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. The deconstruction shall be in accordance with the submitted "Recycling & Reuse Plan for Green Demolition & Wood Salvage" and to be confirmed through an acceptable "Recycling & Reuse Compliance Report for Green Demolition" with copies of recycling and disposal facility receipts. · $15,000
    applicant withheld (individual)
    Issued
  12. 2021-07-12 To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
    applicant withheld (individual)
    Issued
  13. 2021-07-12 To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
    applicant withheld (individual)
    Issued
  14. 2021-07-12 To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
    applicant withheld (individual)
    Issued
  15. 2021-07-12 To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
    applicant withheld (individual)
    Issued
  16. 2021-07-07 To demolish the existing one family dwelling building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $15,000
    applicant withheld (individual)
    Issued
  17. 2021-03-29 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
    Kare Earthworks Ltd.
    Issued
  18. 2021-03-29 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
    Kare Earthworks Ltd.
    Issued
  19. 2021-03-29 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
    Kare Earthworks Ltd.
    Issued
  20. 2021-03-29 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
    Kare Earthworks Ltd.
    Issued
  21. 2021-03-29 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
    Kare Earthworks Ltd.
    Issued
  22. 2021-03-29 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
    Kare Earthworks Ltd.
    Issued
  23. 2021-03-29 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building on the site. QP is Bryan Zecchel of Pinchin Ltd.
    Kare Earthworks Ltd.
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in South Cambie

555 W 19TH Av
To demolish this existing single detached house (1928)(40,000.00) on this site (declared non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit(s): DP-2026-00487, BP-2026-01980, and BP-2026-01981 ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** •\tThis permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. · Mainline Excavation Ltd
2026-10-29
555 W 19TH Av
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in court yard. Interior component located in exterior accessed mech. room below stairs to second floor. · no contractor listed
2026-10-29
555 W 19TH Av
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in stairs to second floor. · BLUEPOINT VENTURES LTD.
2026-10-29