Permit GopherAlberta and B.C. property, permit and zoning records

511 W 7th Av, Vancouver

An address in Fairview, Vancouver, zoned C-3A (Commercial). 4 building permits are on file, most recently “#206 - 2nd Floor Interior alterations to provide bathroom improvements to this existing d…” (issued 16 May 2022). The City's 2026 assessed value for the 63 accounts at this address is $49,096,800.

Zoning
C-3A · Commercial
Neighbourhood
Fairview
Permits on file
4
Assessed value (2026)
$49,096,800
63 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 511 W 7th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154172, 1,672 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,672
Households
910
Median age
37.2
Median household income (2020)
$103,000
Own their home
47%
Vancouver: 45%
Average household size
1.8
Under 15
11%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2022-05-16 #206 - 2nd Floor Interior alterations to provide bathroom improvements to this existing dwelling unit on the 2nd floor (#206) in this existing mixed-used building on the site. Scope of work: bathroom upgrade which includes replacing tub with shower, new toilet and vanity, electrical and plumbing work OK For Field Review per City staffr to determine on site if a separate sprinkler permit is required. E2 - Lighting - Install lighting dimmer, timers and/or motion detectors on interior lights Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $30,000
    no contractor listed
    Issued
  2. 2021-01-07 #109 interior alterations to provide tenant improvements on the ground floor (#109) for a new retail (limited food - bakery) tenant in this existing mixed-used building on the site. Scope of work: to upgrade electrical to suite new equipment (one 5.8Kw electrical oven, one fridge, one freezer) OK for Field Review as per City staff: E2 - Lighting - Upgrade to incorporate Full Off per City staff.4.1.1.1(h) of ASHRAE 90.1-2016 This building is sprinklered. District Building Inspector to determine if a Sprinkler Permit is required at time of the field review inspection. · $8,000
    no contractor listed
    Issued
  3. 2019-10-07 #105-1st floor Interior alterations to provide improvements to this existing office space for new general office (accounting) tenant in unit #105 in this existing commercial/residential building. Scope of work: demolish partition walls, remove doors, t-bar ceiling, flooring, construct new partition walls, new doors and glazing, ceiling work, lighting, finishes, electrical and sprinkler work to suit new layout (including removal of one of the convenience washrooms). TENANT: Jungee Enterprises Ltd. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. DBI to determine if separate sprinkler permit required Ok for field review per City staff Lighting within scope of work area to High Efficiency light systems\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $100,000
    LIDDER CONSTRUCTION LTD.
    Issued
  4. 2017-03-23 Interior alterations only and a change of use from Beauty Salon to provide tenant improvements for a new Retail Limited Food Store at unit #117 at this existing mixed-use commercial and residential building. OK for field review processing as per City staff. Related to IA-2017-00248. L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) · $30,000
    Bismark Construction
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Fairview

555 W 12TH Av
Interior alterations to install turnstiles in this existing Fitness Center #299 on the 2nd floor of this existing Municipally Designated Heritage commercial building. Notes: 1. With the addition of new vestibule walls, make sure they do not impact any existing sprinkler heads. If any sprinkler existing heads are to be relocated, a special sprinkler inspection is required. 2. Permit reviewed and approved to VBBL #14343 (2025). · no contractor listed
2026-10-30
1750 W 2ND Av
401 - 1750 W 2ND AV Exterior and Interior alteration to provide residential improvements including the removal of existing patio covers and increasing the size patio on the fourth floor, at unit 401 - 1750 W 2ND AV at this multiple dwelling building on the site. Ok for new guard patio per City staff. Submission under VBBL 2025 · no contractor listed
2026-10-30
1665 W Broadway
#320 - 3rd Floor Interior alterations to provide improvements to this new office tenant on the 3rd floor (#320) of this existing commercial building on site. Scope of work: Construct 2 new private offices, new mllwork, kitchenette, electrical and plumbing work to suit. TENANT: BC Family Doctors Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Fusion Project Management Ltd
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.