Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
489 W 6th Av, Vancouver
An address in Mount Pleasant, Vancouver, zoned C-3A (Commercial). 2 building permits are on file, most recently “Interior alterations and a change of use from Office to Retail Store (Flower Shop) for a …” (issued 28 July 2022). The City's 2026 assessed value for the 18 accounts at this address is $13,741,600.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154173, 895 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2022-07-28
Interior alterations and a change of use from Office to Retail Store (Flower Shop) for a new tenant at 483 W 6th Ave on the ground floor of this mixed-use building on this site. New tenant: La Fraise Rose Ok for field review per City staff: - This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required. - Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) - Storefront glazing is to remain clear and unobstructed. No translucent or opaque film, artwork, shelving, display case, curtains or similar elements are to be installed on or directly outside or inside of the approved glazing. Separate permit is required for all signage. · $10,000
no contractor listed Issued -
2020-12-03
Interior alterations and change of use to combine existing Artist Studio Class A (F2) with associated residential unit (#103) and existing general office (D) - video editing (#105) into one Artist Studio Class A (F2) with associated residential unit (#103 - Strata Lots 17 & 18) in this existing mixed use building on this site. Scope of work includes: Interior demo - walls, bathroom and fixtures; new walls, doors, storage room, bathroom, associated fixtures, drop ceiling and new home theatre area. REV #1 (R. Foster) issued Sept 22, 2021 to correct the use and add occupancy classifications to work description above. OK for field review per City staff. Notes: ~ Energy Upgrade: L2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s) ~ Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. · $40,000
Littlestar Industries Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Mount Pleasant
To construct a 20-storey mixed-use building (176 secured market rental units) consisting of: 1st storey - child care facility (shell only); rental office; co-work space 2nd to 19th storeys - dwelling units; indoor & outdoor amenities on Level 2 20th storey - indoor & outdoor amenities all over 2 levels of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required. STAGED CONSTRUCTION STAGE I: Excavation & Shoring; Foundation up to Grade; Revisions to the Building’s Interior and Exterior per City staff(S.Yoo) ISSUED: Nov. 3, 2026 REVISION I: Change of General Contractor - In review STAGE II: Full Construction - In review · ITC BC BUILDERS INC.2026-11-03
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed2026-10-30
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.2026-10-30