Permit GopherAlberta and B.C. property, permit and zoning records

4271 Heather St, Vancouver

An address in South Cambie, Vancouver, zoned RM-8A (Residential). 3 building permits are on file, most recently “To construct a 3-storey multiple dwelling, with roof deck, containing a total of seven (7…” (issued 28 February 2025). The City's 2026 assessed value is $3,537,000.

Zoning
RM-8A · Residential
Neighbourhood
South Cambie
Permits on file
3
Assessed value (2026)
$3,537,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 4271 Heather St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150673, 946 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
946
Households
460
Median age
34.4
Median household income (2020)
$93,000
Own their home
59%
Vancouver: 45%
Average household size
2.1
Under 15
11%
65 and over
14%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-02-28 To construct a 3-storey multiple dwelling, with roof deck, containing a total of seven (7) dwelling units, all over one level of underground parking having vehicular access lane. · $2,743,500
    P Square Engineering And Construction Ltd
    Issued
  2. 2024-09-12 To demolish to grade this existing Single Detached House (1941) on this site. Demolition Contractor: Ravi Binning of GOGO Excavating & Contracting Ltd Related to: DP-2022-00223: Response to Conditions BP-2023-00600: In Review Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $67,500
    GOGO EXCAVATING & CONTRACTING LTD.
    Issued
  3. 2024-09-09 This permit is for Salvage and Abatement work only to this existing Single Detached House; to be completed under the supervision of a Qualified Professional. QP: Ramin Hamidnejad, CRSP of Kinetic OHS Services Ltd. Building Permit for BP-2024-02912
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in South Cambie

555 W 19TH Av
To demolish this existing single detached house (1928)(40,000.00) on this site (declared non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit(s): DP-2026-00487, BP-2026-01980, and BP-2026-01981 ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** •\tThis permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. · Mainline Excavation Ltd
2026-10-29
555 W 19TH Av
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in court yard. Interior component located in exterior accessed mech. room below stairs to second floor. · no contractor listed
2026-10-29
555 W 19TH Av
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in stairs to second floor. · BLUEPOINT VENTURES LTD.
2026-10-29
Something wrong on this page? Tell us and we'll check it against the City's records.