Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
3780 Clark Drive, Vancouver
An address in Kensington-Cedar Cottage, Vancouver, zoned CD-1 (741) (Comprehensive Development). 3 building permits are on file, most recently “To construct a 8-storey (Z&D 6-storey) mixed-use building containing 1st storey (Level P1…” (issued 30 October 2023). The City's 2026 assessed value is $36,908,500.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154157, 407 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2023-10-30
To construct a 8-storey (Z&D 6-storey) mixed-use building containing 1st storey (Level P1) - parking, storage and service rooms, 2nd & 3rd storeys (L1 & L2) - 4 CRUs (2 restaurant Class 1 and 2 retail shell only) w/ 4 mezz. and 4 dwelling units. 4th to 8th storeys (L3 to L7) - 50 dwelling units, all over 1 level of underground parking access from the lane at Level P1. Total dwelling units = 54. All tenant spaces require separate tenant improvement permits. Cooking equipment in Amenity Room Class 2 Cooking (Steam and Heat Removal): 1.\tClass 2 Cooking operation (Steam and Heat Removal). 2.\tPost a sign on the hood, "Cooking causing grease-laden vapours is not allowed Exhaust system is designed for steam and heat removal only". This permit has been reviewed under the 2019 Vancouver Building By-law (#12511). Building to be sprinklered to NFPA 13 requirements. Radio Antenna System to be installed in this building. STAGED CONSTRUCITON Stage 1 - Foundation to L1 slab - issued September 23, 2022 Stage 2 - Full Construction - issued October 30, 2023 · $19,700,000
Edge Vancouver Construction Group Ltd Issued -
2022-02-02
1303 Kingsway To demolish this existing commercial (1947) use building on site. OK for SIPs per City staff: DP-2020-00716 RZ-2018-00010 "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $170,000
Assertive Excavating & Demolition Ltd Issued -
2021-08-19
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing commercial building. A separate building permit is required to demolish or deconstruct the building.
Assertive Excavating & Demolition Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Kensington-Cedar Cottage
To demolish the existing single detached house ($40,000) on this site - declared non rental 75% green demo Demo to grade only. No soil disturbance or excavation of soil other than that which is incidental to the demolition is permitted under this permit. This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, Pre-1910 homes and pre-1950 heritage homes require demolition by means of deconstruction, resulting in the salvage of at least 3 tonnes of wood. Demo: N. Parsad - 1167245 BC Ltd QP: MCA Environmental Consulting Inc. (Tarlochan Sunar ) · no contractor listed2026-10-28
*****PART 5***** To construct a three-storey four-unit Multiple Dwelling "Multiplex" building with four surface parking spaces in the rear yard, having vehicular access from the lane. VBBL 2025 - NFPA 13D · Kang Bros Holdings Ltd2026-10-28
Exterior alterations to add a new roof cover over the existing deck at the rear of the second floor of this existing single detached house on this inside with lane site as approved by the Board of Variance Appeal Z36309 dated March 10, 2026, thereby overturning the decision of the Director of Planning and relaxing the overall floor area to 2,593sf. Related to Issued DP-2025-00980 Full-height privacy screen to be installed on the south elevation. · no contractor listed2026-10-26