Permit GopherAlberta and B.C. property, permit and zoning records

369 Terminal Av, Vancouver

An address in Strathcona, Vancouver, zoned I-3 (Industrial). 9 building permits are on file, most recently “Exterior alterations to reduce 5 surface parking spaces and install two gensets with fenc…” (issued 16 April 2026). The City's 2026 assessed value is $51,289,000.

Zoning
I-3 · Industrial
Neighbourhood
Strathcona
Permits on file
9
Assessed value (2026)
$51,289,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 369 Terminal Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150751, 708 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
708
Households
345
Median age
44.8
Median household income (2020)
$46,800
Own their home
36%
Vancouver: 45%
Average household size
1.8
Under 15
8%
65 and over
22%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-04-16 Exterior alterations to reduce 5 surface parking spaces and install two gensets with fence enclosure on this site. · $18,000
    Genuine Quality Construction & Design Ltd
    Issued
  2. 2025-12-24 #207 - 369 TERMINAL AVE Exterior and interior alterations to provide tenant improvements including the installation of new rooftop HVAC units to unit #207 for a general office tenant (Digital Entertainment and Information Communication Technology) on the 2nd floor of this existing commercial building on this site. OK for field review per City staff. · $450,000
    Genuine Quality Construction & Design Ltd
    Issued
  3. 2025-10-28 2nd floor (#201 demised into #201, #207, #215) Interior alterations to demolish the north and east sides of the floor and demise this full floor office space into three units, (to be #201, #207, & #215) in this existing commercial building on this site. Scope of work: select demo of partition walls, new demising and partition walls, doors, flooring. District Building Inspector to determine if a Special Sprinkler Inspection is required. * In accordance with VBBL 2025. Separate Permit(s) will be required for any further improvement to these spaces. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $19,500
    Genuine Quality Construction & Design Ltd
    Issued
  4. 2022-11-25 101-369 Terminal Ave Including the operational letter dated October 21, 2022 submitted by Pauline Martin, from Kirkwood Management Services Ltd. DBA Neuromotion Physiotherapy + Rehabilitation to provide interior alterations in this sprinklered mixed-use building to provide tenant improvements to this 'similar to' Health Care Office space in this unit #101. E2 Upgrade: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) as shown on Dwg# E1-1\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $29,000
    Genuine Quality Construction & Design Ltd
    Issued
  5. 2022-07-19 #300 - 3rd Floor (full floor tenant) Interior alterations to provide tenant improvements for this full floor tenant on the 3rd floor (#300) in this existing commercial building on this site. Scope of work: construct new full height partition walls and doors to create 4 new offices, electrical and sprinkler work. TENANT: Broadway Subway Constructors General Partnership OK for Field Review for Office TI E2 upgrade: Lighting #1- Upgrade to local control (9.4.1.1.(a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $80,000
    Priority Projects Limited
    Issued
  6. 2021-07-23 #300 - 3rd Floor (full floor tenant) Interior alterations to provide tenant improvements for this full floor tenant on the 3rd floor (#300) in this existing commercial building on this site. Scope of work: remove/construct select interior partition walls, lighting, electrical and sprinkler work. TENANT: Broadway Subway Constructors GP Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Energy Upgrade: E2 - Lighting - Upgrade to incorporate Scheduled Shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016) Note:Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $70,000
    Priority Projects Limited
    Issued
  7. 2019-03-14 #101-1st storey - 369 Terminal Ave Including the operational letter dated February 19, 2019 submitted by Patrick Hamilton, CEO of Yana Motion Lab to provide interior alterations for tenant improvements and to change the use from office to "similar to" health care office for a new tenant in unit #101 in this existing office building on this site. Scope of work: remove interior wall/construct partition walls create new 2 offices and doors, replace sink, new t-bar ceiling, electrical, plumbing and sprinkler work. Building Sprinklered – Separate Sprinkler Permit required for proposed sprinkler work. L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) TENANT: Yana Motion (Yana Health Systems Inc.) Ok for combined development and building permit per City staff. OK for field review as per City staff · $45,000
    Genuine Quality Construction & Design Ltd
    Issued
  8. 2019-02-19 #400 Interior alteration to demise unit #400 on the 4th floor into 2 units, and provide improvements in one of the new spaces. Remaining space will maintain existing office walls (not shell space) REVISION #1: Interior layout change. REVISION #2: Interior layout change. REVISION #3: Change one wall and two door positions and increase permit value from $150,000 to $155,000. June 22, 2020, mlh. · $155,000
    no contractor listed
    Issued
  9. 2017-07-05 #201-2nd floor (full floor tenant) Interior alterations only to provide tenant improvements and to provide for the expansion of unit #201 into unit #210, and thereby retaining unit #201 at this existing commercial building. Scope of work: demolish demising and partition walls, remove doors and glazing, construct new partition walls, renovate men's washroom to create separate shower room, electrical and plumbing work. Address Note: #210 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #201 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: IUGO Mobile Entertainment Inc. (Stephanie Low) · $60,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Strathcona

208 E Georgia St
Exterior and interior alterations to reduce the number of Single Room Accommodation (SRA) rooms from 71 to 50 and provide housing and recovery support services (Group C) on floors 2 to 4 in this existing mixed used protected heritage building on this site. Proposed work includes addition of a new covered roof top patio. Roof deck to be sprinklered to NFPA 13 requirements. Mechanical Review Notes: - Class 2 Cooking Operation (Steam and Heat Removal) is proposed on Level 3. - A metal sign shall be posted on the Type 2 hood, "Cooking causing grease-laden vapours is not allowed Exhaust system is designed for steam and heat removal only". · no contractor listed
2026-10-26
222 Main St
Exterior and interior alterations to provide dedicated egress paths for the residential levels in this existing mixed-use (residential/community courts) building on this site. The scope includes adding a new exterior landing and stairs for the path through Stair 1B to exit to Powell Street, and adding a door for the path through 3A to exit through enclosed patio to E Cordova St. *** Reviewed under the VBBL 2025 *** · VANDELAY VENTURES LTD.
2026-10-21
418 Alexander St
To demolish this existing 2 storey commercial building. This demolition permit also permits abatement work to be completed to WorkSafe standards. This demolition was reviewed under VBBL 2025. Demolition contractor - Division 2 Contracting Ltd - Division 2 Contracting Ltd - [name withheld] · Division 2 Contracting Ltd
2026-10-16
Something wrong on this page? Tell us and we'll check it against the City's records.