Permit GopherAlberta and B.C. property, permit and zoning records

3675 E 48th Av, Vancouver

An address in Killarney, Vancouver, zoned R1-1 (Residential Inclusive). 3 building permits are on file, most recently “Demolition – Conventional (Standard) To demolish the existing one family dwelling buildin…” (issued 25 April 2024). The City's 2026 assessed value for the 3 accounts at this address is $3,547,000.

Zoning
R1-1 · Residential Inclusive
Neighbourhood
Killarney
Permits on file
3
Assessed value (2026)
$3,547,000
3 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 3675 E 48th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59151477, 856 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
856
Households
260
Median age
42.8
Median household income (2020)
$99,000
Own their home
79%
Vancouver: 45%
Average household size
3.2
Under 15
13%
65 and over
23%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2024-04-25 Demolition – Conventional (Standard) To demolish the existing one family dwelling building ($15,000) on this site. Note: Demo Declaration – GNA Contracting Ltd (Onkar Kular) [contact removed] · $15,000
    GNA Contracting Ltd
    Issued
  2. 2024-04-25 To construct a 2 storey two-family dwelling with (2) secondary suite(s) located in the Basement ($955,205.00) with a detached accessory building (2 car garage) and 1 open parking at the rear providing 3 parking spaces, having vehicular access from the lane. 1.\tCovenant registered at the Land Title Office under CB1251984 2.\tEntire building to be sprinklered 2x13D 3.\tHeat Pump proposed – Exterior component located in rear yard, Interior component located in upper floor 4.\t“As shown by an asterisk (*) on the building permit floor plans and/or elevations, exit protection is required to be provided in accordance with Articles 9.9.4.4., 9.9.4.6., and/or 9.37.2.8. of the 2019 VBBL · $955,205
    Nucasa Development
    Issued
  3. 2022-12-27 Salvage and abatement permit only for DB-2022-00598 and to be completed under the supervision of Qualified Professional. This permit does not authorize demolition, deconstruction or construction work. QP: Ramin Hamidnejad of Kinetic OHS Service Ltd
    GNA Contracting Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Killarney

5829 Mckinnon St
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit Front building with three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in rear yard. · Mountainview Enterprises Ltd
2026-10-29
5829 Mckinnon St
To construct a Multiple Dwelling “Multiplex” with a two-storey one-unit rear building with three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in rear yard. · Mountainview Enterprises Ltd
2026-10-29
6907 Rupert St
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces having vehicular access from the lane. 1.\tHRV unit proposed - located in entry closet 2.\tMechanical unit proposed – Exterior component located in courtyard, Interior component located in second floor hallway closet · ANTAIOS CONSTRUCTION & DEVELOPMENT LTD
2026-10-22
Something wrong on this page? Tell us and we'll check it against the City's records.