Permit GopherAlberta and B.C. property, permit and zoning records

3636 Trinity St, Vancouver

An address in Hastings-Sunrise, Vancouver, zoned R1-1 (Residential Inclusive). 3 building permits are on file, most recently “To construct a 2-storey two-family dwelling with 2 secondary suites located in the baseme…” (issued 26 November 2021). The City's 2026 assessed value for the 3 accounts at this address is $3,763,000.

Zoning
R1-1 · Residential Inclusive
Neighbourhood
Hastings-Sunrise
Permits on file
3
Assessed value (2026)
$3,763,000
3 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 3636 Trinity St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150307, 677 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
677
Households
270
Median age
43.6
Median household income (2020)
$114,000
Own their home
72%
Vancouver: 45%
Average household size
2.6
Under 15
16%
65 and over
22%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2021-11-26 To construct a 2-storey two-family dwelling with 2 secondary suites located in the basement with a detached accessory building (garage) at the rear providing 2 parking spaces and a surface parking having vehicular access from the lane. The entire building to be sprinklered to 2xNFPA 13D. 1.\tA/C (1) unit proposed in rear yard South elevation (1) unit proposed front yard North elevation- sunken patio entry area. · $1,067,502
    Pacific Prime Projects Inc
    Issued
  2. 2021-11-24 To demolish the existing two family dwelling building with secondary suite on this site by means of deconstruction. Pre-1950 Green Demolition Conditions Apply 90% Recycling Rate of Building Materials Required · $15,000
    Khela Excavating Ltd.
    Issued
  3. 2021-11-10 Demo/Decom Building Permit: BP-2021-03446 Construct Building Permit: DB-2021-03445
    Khela Excavating Ltd.
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Hastings-Sunrise

3657 E Pender St
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in third floor mechanical closet. · Singh Development Ltd
2026-10-29
3661 E Pender St
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located under stairs to second floor. · Singh Development Ltd
2026-10-29
524 Kaslo St
524 Kaslo St Interior and exterior renovation to this existing single family dwelling on site. Kitchen renovation including millwork, flooring and new plumbing fixtures. replacement of Bay window in kitchen. New basement flooring. Okay for DB Field Review as per City staff · no contractor listed
2026-10-28
Something wrong on this page? Tell us and we'll check it against the City's records.