This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
3538 W 43rd Av, Vancouver
An address in Dunbar-Southlands, Vancouver, zoned R1-1 (Residential Inclusive). 4 building permits are on file, most recently “To demolish to grade this Single Detached House (1931) and its accessory building on the …” (issued 14 May 2025). The City's 2026 assessed value is $4,422,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150909, 503 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-05-14
To demolish to grade this Single Detached House (1931) and its accessory building on the site. Demolish - Conventional Green Demolition, 75% Recycling Required. Related to: DP-2024-00124: Issued BP-2024-04227: Issued BP-2024-04228: Issued Demolition contractor: Spacious Construction Corp - [name withheld] Tel: [contact removed] QP: Coast BC Hazmat Inspections Inc - Baraa Habash [contact removed] Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $62,000
Spacious Construction Corp Issued -
2025-03-19
Salvage and Abatement Permit for DB-2024-04771 To demolish to grade this Single Detached House (1931) and its accessory building on the site. Demolish - Conventional Green Demolition, 75% Recycling Required. Related to: DP-2024-00124: Response to Conditions BP-2024-04227: In Review BP-2024-04228: In Review Demo contractor: Spacious Construction Corp - [name withheld] Tel: [contact removed] QP: Coast BC Hazmat Inspections Inc - Baraa Habash [contact removed]
Spacious Construction Corp Issued -
2025-03-19
To construct a Multiple Dwelling "Multiplex" with a three-story 4 unit front building and a two-story 2 unit Rear Building and 4 surface parking spaces having access from the lane BP-2024-04227: Front Building BP-2024-04228: Rear Building Note: 1.0. Application is reviewed under VBBL2019. 2.0. This building is sprinklered to NFPA 13D. 3.0. Please refer BP-2024-04227 for permit drawings.
no contractor listed Issued -
2025-03-19
To construct a Multiple Dwelling "Multiplex" with a three-story 4 unit front building and a two-story 2 unit Rear Building and 4 surface parking spaces having access from the lane. This permit is for site work and front building. BP-2024-04227: Front Building - 2.6M BP-2024-04228: Rear Building - 1.3M Note: 1.0. Application is reviewed under VBBL 2019. 2.0. Both buildings are sprinklered to NFPA 13D. Revision #1 (P Volpi, April 20, 2026): 1. Relocate the bathroom toilet and sink on 2nd floor in Building 1. 2. Move the deck doors on 3rd floor in Building 1. 3. Relocate the washer and dryer in Building 2. 4. Relocate the bedroom doors on 2nd floor in Building 2. · $3,900,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Dunbar-Southlands
Interior alterations to provide tenant improvements to this existing Restaurant Class 1 on the ground floor of this existing mixed-use building on this site. Building Review Branch Notes: 1)\tTotal proposed Occupant load is 50 seats + 5 staffs = 55 Persons. 2)\tMaximum occupant load is 60 Persons. 3)\tA permanent sign indicating the above proposed occupant load shall be posted in a conspicuous location near the suite's principal entrance. · no contractor listed2026-10-29
#201 - 3595 W 26TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #201 - 3595 W 26th Ave. on the second floor of this existing multiple dwelling building on the site. Okay for DTI per City staff · Bogdan Marin Electrical2026-10-28
3042 W 33RD AVENUE Interior alterations to change the use from Single Detached House to Single Detached House with Secondary Suite. Ok for field review per City staff · no contractor listed2026-10-16