Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
3532 E Hastings St, Vancouver
An address in Hastings-Sunrise, Vancouver, zoned CD-1 (820) (Comprehensive Development). 3 building permits are on file, most recently “To construct a 8-storey (7-storey Z&D) noncombustible mixed-use building consists of 1st …” (issued 19 February 2025). The City's 2026 assessed value is $6,388,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150310, 748 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-02-19
To construct a 8-storey (7-storey Z&D) noncombustible mixed-use building consists of 1st storey - Parking and service rooms, 2nd to 3rd storeys - Retail use (shell only, double height), bicycle storage, two-storey dwelling units and Amenity room, 4th to 8th storeys - dwelling units and outdoor amenity at 8th storey, having vehicular access from the lane. Total dwelling units = 34 secured market rentals. All tenant spaces require separate tenant improvement permits. Notes: 1. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511) with amendments effective on February 9, 2023. 2. Building to be sprinklered to NFPA 13 requirements. 3. Radio Antenna System to be installed in this building. 4. One 2 hr vertical shaft with grease duct is proposed for the only CRU on the ground floor of this mixed-use building. STAGED CONSTRUCTION Stage 1 - Excavation and Shoring - issued January 12, 2024 by T. Lee Stage 2 - Foundation to L1 slab (Aug 20/24, A. Min) related to M/A DP-2023-00318 Stage 3 - Full Construction (Feb 19/25, A. Min) related to M/A DP-2024-00948 Stage 1 - REVISION #1 (Feb 20/25, A. Min): Revised excavation & shoring drawings with updated elevations and details. See Authorized Staged Construction Form for details. · $10,300,000
Pro-Can Construction Group Corp Issued -
2024-04-29
To demolish this existing two-storey with basement mixed-use building containing 6 residential units on this site to grade, per City staffal, of aDB Engineering, dated February 27, 2023. Scope of work to include berming of the foundation wall. Related to S&A permit BP-2023-00869. Ok for SIPs per City staff · $150,000
Pro-Can Construction Group Corp Issued -
2024-01-11
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing mixed used building. Related to demolition permit DB-2023-00831. To be issued separately. QP: Harvey Wong, CRSP, Kinetic OHS Services Ltd.
Pro-Can Construction Group Corp Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Hastings-Sunrise
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in third floor mechanical closet. · Singh Development Ltd2026-10-29
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located under stairs to second floor. · Singh Development Ltd2026-10-29
524 Kaslo St Interior and exterior renovation to this existing single family dwelling on site. Kitchen renovation including millwork, flooring and new plumbing fixtures. replacement of Bay window in kitchen. New basement flooring. Okay for DB Field Review as per City staff · no contractor listed2026-10-28