Permit GopherAlberta and B.C. property, permit and zoning records

3389 Venables St, Vancouver

An address in Hastings-Sunrise, Vancouver, zoned R1-1 (Residential Inclusive). 4 building permits are on file, most recently “To construct a two-storey two-family dwelling with one secondary suite ($633,120) located…” (issued 28 June 2022). The City's 2026 assessed value for the 3 accounts at this address is $2,376,000.

Zoning
R1-1 · Residential Inclusive
Neighbourhood
Hastings-Sunrise
Permits on file
4
Assessed value (2026)
$2,376,000
3 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 3389 Venables St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150329, 966 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
966
Households
335
Median age
40.4
Median household income (2020)
$86,000
Own their home
51%
Vancouver: 45%
Average household size
2.8
Under 15
12%
65 and over
18%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2022-06-28 To construct a two-storey two-family dwelling with one secondary suite ($633,120) located in the basement, with a detached accessory building (garage) at the rear providing 2 parking spaces, having vehicular access from the lane. Note: This is a 2 storey building pursuant to the Zoning and Development By-Law 1. Covenant registered at the Land Title Office under CA9898216 2. No strata titling permitted 3. A/C units proposed in rear yard & second storey 4. No Bar sinks proposed · $633,120
    Yuvraj Properties Ltd
    Issued
  2. 2022-04-26 To demolish the existing one family dwelling building ($15,000) on this site by means of deconstruction. This permit is subject to the Green Demolition Bylaw (11023) Note: Pre-1950 recycling requirement: 75% of non-hazardous construction waste · $15,000
    GNA Contracting Ltd
    Issued
  3. 2022-01-17 Demo Permit for BP-2021-05186 Building Permit for DB-2021-05172
    GNA Contracting Ltd
    Issued
  4. 2018-10-16 Interior and exterior alterations to remove unauthorized secondary suite, reduce unpermitted extension at rear, to remove the shed, and to provide new rear entry stair and landing, to the existing single family dwelling building on this site. OK for FLD RVW per City staff: - OK to accept rear entry stair and landing at 3'-3" x 9'- 8 1/2" dimensions per City staff. - OK to accept with no energuide report per City staffhown is independent of the exterior envelope of the building, to satisfaction of DBI. - Remove unauthorized kitchen facilities in basement (including the range and related electrical wiring, range hood, overhead cupboards, and double compartment sink). · $4,500
    RKL Contracting Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Hastings-Sunrise

3657 E Pender St
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in third floor mechanical closet. · Singh Development Ltd
2026-10-29
3661 E Pender St
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located under stairs to second floor. · Singh Development Ltd
2026-10-29
524 Kaslo St
524 Kaslo St Interior and exterior renovation to this existing single family dwelling on site. Kitchen renovation including millwork, flooring and new plumbing fixtures. replacement of Bay window in kitchen. New basement flooring. Okay for DB Field Review as per City staff · no contractor listed
2026-10-28
Something wrong on this page? Tell us and we'll check it against the City's records.