Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
338 W 8th Av, Vancouver
An address in Mount Pleasant, Vancouver, zoned I-1 (Industrial). 3 building permits are on file, most recently “#208 - 338 W 8th Av Interior alterations and a change of use of approximately from Produc…” (issued 11 February 2025). The City's 2026 assessed value for the 62 accounts at this address is $31,208,216.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154173, 895 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-02-11
#208 - 338 W 8th Av Interior alterations and a change of use of approximately from Production Studio to Health Care Office (Registered Massage Therapist) only at #208 - 338 W 8th Av in this existing mixed-use (commercial/industrial) building. Scope of work includes validating minor interior layout changes and the plumbing fixtures in the existing washroom. No work proposed in the mezzanine level. Notes: 1. Refer to DP-2024-00079 for change of use from Production Studio to Health Care Office in conjunction with Health Enhancement Centre. 2. Personal services including hair exam, facial services and lash lift are not permitted under this permit. Health Department's approval will be required to provide personal services in the future. Processed through CRC. · $50,000
no contractor listed Issued -
2025-01-23
332 W 8th Ave Interior alterations and a change the use from Wholesale - Class B to Health Care Office at 332 W 8th Ave on the ground floor in this existing mixed-use building on this site. 2019 VBBL Revision 1 - to change the applicant's mailing address to 332 W 8th. · $100,000
no contractor listed Issued -
2018-07-17
332 W 8th Interior alterations to provide tenant improvements to approximately 1,449sf for a new wholesale class B (furniture dealer) in this existing industrial/commercial/ Artist Studio with associated residential building. Scope of work: remove one existing wall, add one wall, relocated lights. Ok for Field Review as per City staffVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) Processed through CRC · $2,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Mount Pleasant
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed2026-10-30
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.2026-10-30
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes2026-10-16