Permit GopherAlberta and B.C. property, permit and zoning records

338 W 8th Av, Vancouver

An address in Mount Pleasant, Vancouver, zoned I-1 (Industrial). 3 building permits are on file, most recently “#208 - 338 W 8th Av Interior alterations and a change of use of approximately from Produc…” (issued 11 February 2025). The City's 2026 assessed value for the 62 accounts at this address is $31,208,216.

Zoning
I-1 · Industrial
Neighbourhood
Mount Pleasant
Permits on file
3
Assessed value (2026)
$31,208,216
62 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 338 W 8th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154173, 895 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
895
Households
425
Median age
38.8
Median household income (2020)
$104,000
Own their home
47%
Vancouver: 45%
Average household size
1.8
Under 15
9%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-02-11 #208 - 338 W 8th Av Interior alterations and a change of use of approximately from Production Studio to Health Care Office (Registered Massage Therapist) only at #208 - 338 W 8th Av in this existing mixed-use (commercial/industrial) building. Scope of work includes validating minor interior layout changes and the plumbing fixtures in the existing washroom. No work proposed in the mezzanine level. Notes: 1. Refer to DP-2024-00079 for change of use from Production Studio to Health Care Office in conjunction with Health Enhancement Centre. 2. Personal services including hair exam, facial services and lash lift are not permitted under this permit. Health Department's approval will be required to provide personal services in the future. Processed through CRC. · $50,000
    no contractor listed
    Issued
  2. 2025-01-23 332 W 8th Ave Interior alterations and a change the use from Wholesale - Class B to Health Care Office at 332 W 8th Ave on the ground floor in this existing mixed-use building on this site. 2019 VBBL Revision 1 - to change the applicant's mailing address to 332 W 8th. · $100,000
    no contractor listed
    Issued
  3. 2018-07-17 332 W 8th Interior alterations to provide tenant improvements to approximately 1,449sf for a new wholesale class B (furniture dealer) in this existing industrial/commercial/ Artist Studio with associated residential building. Scope of work: remove one existing wall, add one wall, relocated lights. Ok for Field Review as per City staffVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) Processed through CRC · $2,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Mount Pleasant

1255 E 15TH Av
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed
2026-10-30
95 E 15TH Av
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.
2026-10-30
345 W 11TH Av
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes
2026-10-16
Something wrong on this page? Tell us and we'll check it against the City's records.