Permit GopherAlberta and B.C. property, permit and zoning records

3228 Euclid Av, Vancouver

An address in Renfrew-Collingwood, Vancouver, zoned R1-1 (Residential Inclusive). 2 building permits are on file, most recently “2.0 LWH SA To construct a 2 storey laneway house building ($300,000) with an open parking…” (issued 17 January 2025). The City's 2026 assessed value is $1,772,000.

Zoning
R1-1 · Residential Inclusive
Neighbourhood
Renfrew-Collingwood
Permits on file
2
Assessed value (2026)
$1,772,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 3228 Euclid Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59151459, 524 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
524
Households
180
Median age
40.8
Median household income (2020)
$93,000
Own their home
42%
Vancouver: 45%
Average household size
2.9
Under 15
10%
65 and over
16%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-01-17 2.0 LWH SA To construct a 2 storey laneway house building ($300,000) with an open parking pad, having vehicular access from the 20' Lane. Note: The entire building to be sprinklered to NFPA 13D Note: This is a 1 ½ storey building pursuant to the Zoning & Development By-law. 1.\tCovenant not required with existing house 2.\tNo Strata Titling permitted 3.\tNo A/C Unit proposed · $300,000
    Kingstar Building Ltd.
    Issued
  2. 2025-01-17 Exterior alterations to this existing One Family Dwelling (principle dwelling building) on this inside with lane site. Scope to Include: Remove the main house chimney projection / overhang to ensure there is the min 3’ wide Fire Dept. pathway to the proposed Laneway House NOTE : The principle dwelling chimney reduction work to be completed prior to the Final inspection of the related Laneway House. NOTE: Information regarding the Laneway House on the survey and site plan is for reference only. Any discrepancy between information regarding the Laneway House on the survey and/or site plan and approved permit drawings for the Laneway House are neither approved nor authorized under this Main House Alteration permit. NEW R1-1 BYLAW ***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.*** · $10,000
    Kingstar Building Ltd.
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Renfrew-Collingwood

2889 E 12TH Av
#600 & # 700 - 2889 E 12TH AV Interior alteration to this existing Office (Group D) to office at #600 + 700 - 2889 E 12th Ave. on the sixth and seventh floor of this existing commercial building on this site. Ok for BP, field review per City staff · Fusion Project Management Ltd
2026-11-02
43 Dieppe Place
To construct a Multiple Dwelling 'Multiplex' with a two-storey plus basement two dwelling unit front building and a two-storey two dwelling unit rear building with an attached 3-car carport and 1 surface parking, providing total 4 parking spaces, having vehicular access from the rear lane. Building 1: BP-2026-00771 (Site permit and Building 1 permit) - Two dwelling units (South - Front) Building 2: BP-2026-00772 - Two dwelling units (North - Rear) This permit is for site project work and construction of Building 1. Note: The entire building to be sprinklered to 2 x NFPA 13D. Note: This is a 2 storey building pursuant to the Zoning and Development By-Law 1.\tHRV proposed – Located in basement floor mechanical room 2.\tHeat Pump proposed – Exterior component located in front and east side, Interior component located in second floor closet · MINHAS HOLDINGS INC
2026-10-30
3263 Matapan Crescent
*Part 5* To construct a three-storey 4-unit Multiple Dwelling "Multiplex" and detached carport with 4 parking spaces having access from the lane. Notes: 1. Building to be sprinklered to Modified NFPA 13R per bulletin 2025-003-BU 2. Schedules submitted: A / B (Struct), B (Guards), B/D (Env), B (Geo) Permit issued pursuant to VBBL 2019 · JRXL Developments Ltd
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.