Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
320 E 2nd Av, Vancouver
An address in Mount Pleasant, Vancouver, zoned IC-3 (Industrial). 3 building permits are on file, most recently “To construct a five storey mixed-use building consisting of Wholesale Class A use (F2 occ…” (issued 24 November 2021). The City's 2026 assessed value is $19,905,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153164, 2,058 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2021-11-24
To construct a five storey mixed-use building consisting of Wholesale Class A use (F2 occupancy) on the first storey, 54 dwelling units associated with an Artist Studio and 41 regular dwelling units (a total of 95 rental dwelling units) under the Secured Market Rental Housing Policy, from the second to fifth storeys, all over one level of underground parking, having vehicular access from the lane. VBBL 2019 - Reviewed during the 2020 pandemic crisis. STAGE 1 - Excavation and Shoring issued on Nov 24, 2021. Revision #1 (May 31, 2024) - A Change of CP from Jun Kim (Outgoing - May 31, 2024) to David Steer (Incoming - May 31, 2024). Stage 2 - ______________ (waiting for instruction from the new CP). · $27,000,000
no contractor listed Issued -
2021-02-08
To demolish this existing industrial building to grade. Demo Declaration - Wendy Litchfield - MWL Demolition Ltd. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition. This can be provided by requesting an inspection through your online account, or by calling 3-1-1 or [contact removed] outside Vancouver. · $110,000
MWL Demolition Ltd Issued -
2021-01-20
Building Permit for BP-2020-04032 To demolish this existing industrial building to grade. Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing commercial building. A separate building permit is required to demolish or deconstruct the building. Abatement QP: Enviro Vac (division of Paragon Remediation Group Ltd.), [contact removed]
MWL Demolition Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Mount Pleasant
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed2026-10-30
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.2026-10-30
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes2026-10-16