Permit GopherAlberta and B.C. property, permit and zoning records

2828 Main St, Vancouver

An address in Mount Pleasant, Vancouver, zoned C-2C (Commercial). 3 building permits are on file, most recently “interior alterations to expand the existing Health Care Office with ancillary Retail unit…” (issued 1 August 2025). The City's 2026 assessed value for the 50 accounts at this address is $37,329,200.

Zoning
C-2C · Commercial
Neighbourhood
Mount Pleasant
Permits on file
3
Assessed value (2026)
$37,329,200
50 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 2828 Main St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150709, 2,457 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
2,457
Households
1,425
Median age
36
Median household income (2020)
$87,000
Own their home
44%
Vancouver: 45%
Average household size
1.6
Under 15
6%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-08-01 interior alterations to expand the existing Health Care Office with ancillary Retail unit at 2830 Main Street to the adjacent unit at 2836 Main Street (approx.853sf) on the ground floor of this existing mixed use building on this site. Note to applicant: · $115,000
    no contractor listed
    Issued
  2. 2021-07-19 Building Permit for DP-2019-00655 Interior alterations and to change the use of approximately 600.0 square feet from a Retail use (Limited Food-E) to a Liquor Establishment Class-1(A2), in this existing mixed-use building on this site. Total number of seats provided is 23. Note: This application is reviewed under VBBL 2019. Scope of Work: modifications to existing washroom, new finishes and furniture; and bar including new interceptor, minor adjustment to sprinklers and new lighting. · $70,000
    no contractor listed
    Issued
  3. 2017-09-19 (2830 main) Interior alterations and a change of use from Beauty and Wellness to Health Care Office with Ancillary Retail at unit 2830 Main Street on the ground floor of this existing mixed use building, Including the letter of operation from Minh Nguyen, Chiropractor, dated July 20, 2017. to permit OK for DB per City staff. OK for field review per City staff. Note: Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $10,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Mount Pleasant

1255 E 15TH Av
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed
2026-10-30
95 E 15TH Av
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.
2026-10-30
345 W 11TH Av
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes
2026-10-16
Something wrong on this page? Tell us and we'll check it against the City's records.