Permit GopherAlberta and B.C. property, permit and zoning records

2738 William St, Vancouver

An address in Hastings-Sunrise, Vancouver, zoned R1-1 (Residential Inclusive). 1 building permit is on file, most recently “Exterior alterations to add a 5' by 8'10" landing and stairs at the front of this existin…” (issued 17 November 2020). The City's 2026 assessed value is $1,568,400.

Zoning
R1-1 · Residential Inclusive
Neighbourhood
Hastings-Sunrise
Permits on file
1
Assessed value (2026)
$1,568,400
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 2738 William St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153226, 634 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
634
Households
235
Median age
43.2
Median household income (2020)
$96,000
Own their home
68%
Vancouver: 45%
Average household size
2.7
Under 15
14%
65 and over
18%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2020-11-17 Exterior alterations to add a 5' by 8'10" landing and stairs at the front of this existing one family dwelling building on this site. OK for Field Review per City staff: No landscape alterations proposed. Contractor is responsible for protecting trees in proximity to any work per City staff; all landscaping / street trees impacted by construction work to be made good (equal or better). Construction access and material storage via front walkway only. No tree removals are authorized. Any necessary pruning of trees or vegetation to be done by ISA certified arborist. No heavy machinery or storage of materials or equipment permitted under the canopy dripline of existing trees. No construction proposed within critical root zone of existing trees. · $1,500
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Hastings-Sunrise

3657 E Pender St
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in third floor mechanical closet. · Singh Development Ltd
2026-10-29
3661 E Pender St
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located under stairs to second floor. · Singh Development Ltd
2026-10-29
524 Kaslo St
524 Kaslo St Interior and exterior renovation to this existing single family dwelling on site. Kitchen renovation including millwork, flooring and new plumbing fixtures. replacement of Bay window in kitchen. New basement flooring. Okay for DB Field Review as per City staff · no contractor listed
2026-10-28
Something wrong on this page? Tell us and we'll check it against the City's records.