Permit GopherAlberta and B.C. property, permit and zoning records

273 E 1st Av, Vancouver

An address in Strathcona, Vancouver, zoned I-3 (Industrial). 4 building permits are on file, most recently “Interior alterations to install a racking storage system in this Manufacturing use, (Brew…” (issued 3 March 2023). The City's 2026 assessed value is $42,456,000.

Zoning
I-3 · Industrial
Neighbourhood
Strathcona
Permits on file
4
Assessed value (2026)
$42,456,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 273 E 1st Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150750, 1,128 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,128
Households
625
Median age
39.6
Median household income (2020)
$74,500
Own their home
53%
Vancouver: 45%
Average household size
1.6
Under 15
8%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2023-03-03 Interior alterations to install a racking storage system in this Manufacturing use, (Brewery) (Group F2) building on this site. Ok for field review as per City staff: - This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required. · $25,376
    no contractor listed
    Issued
  2. 2022-09-01 Exterior alterations to formalize the work without permit installation of brewery process piping at the exterior 2 hour rated wall of 295 East 1st Avenue in this Manufacturing use, (Brewery) (Group F2) building on this site. Related to BP-2020-01460 · $10,000
    no contractor listed
    Issued
  3. 2020-10-20 Interior alterations and to change the use from Wholesale Class-A to a Manufacturing use, (Brewery) (Group F2), to be used in conjunction with the existing Brewery use, (295 East 1st Avenue) in this existing commercial building. Scope of work includes new structural slab to support new holding tanks. Environmental Protection Notes: Owner of Red Truck Brewing is required to amend the existing Waste Discharge Permit to include this additional area of the operation. Permit Amendment #1- 2021-11-26- S.Le Refer to related DP-2020-00643 Interior alterations to combine four (4) units into one unit, to change the use from general office and wholesale to Manufacturing (Brewery) with ancillary office, and to demolish the mezzanine, in this existing two-storey Industrial building this site. · $150,000
    Smith Bros & Wilson (BC) Ltd
    Issued
  4. 2019-08-30 255 E 1ST Ave Interior alterations and a change of use of this existing ground two storey unit from miscellaneous product manufacturing class B (dental products) to production studio with ancillary office for new tenant in this existing building on this site. Scope of work: remove interior walls, doors, add new interior walls and door, relocate lighting. Processed through CRC · $250,000
    Vertical Grain Projects Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Strathcona

208 E Georgia St
Exterior and interior alterations to reduce the number of Single Room Accommodation (SRA) rooms from 71 to 50 and provide housing and recovery support services (Group C) on floors 2 to 4 in this existing mixed used protected heritage building on this site. Proposed work includes addition of a new covered roof top patio. Roof deck to be sprinklered to NFPA 13 requirements. Mechanical Review Notes: - Class 2 Cooking Operation (Steam and Heat Removal) is proposed on Level 3. - A metal sign shall be posted on the Type 2 hood, "Cooking causing grease-laden vapours is not allowed Exhaust system is designed for steam and heat removal only". · no contractor listed
2026-10-26
222 Main St
Exterior and interior alterations to provide dedicated egress paths for the residential levels in this existing mixed-use (residential/community courts) building on this site. The scope includes adding a new exterior landing and stairs for the path through Stair 1B to exit to Powell Street, and adding a door for the path through 3A to exit through enclosed patio to E Cordova St. *** Reviewed under the VBBL 2025 *** · VANDELAY VENTURES LTD.
2026-10-21
418 Alexander St
To demolish this existing 2 storey commercial building. This demolition permit also permits abatement work to be completed to WorkSafe standards. This demolition was reviewed under VBBL 2025. Demolition contractor - Division 2 Contracting Ltd - Division 2 Contracting Ltd - [name withheld] · Division 2 Contracting Ltd
2026-10-16
Something wrong on this page? Tell us and we'll check it against the City's records.