Permit GopherAlberta and B.C. property, permit and zoning records

2633 Nootka St, Vancouver

An address in Renfrew-Collingwood, Vancouver, zoned CD-1 (470) (Comprehensive Development). 96 building permits are on file, most recently “#350 - Exterior and interior alterations and a change of use/occupancy from School (A2) t…” (issued 22 October 2026). The City's 2026 assessed value is $506,834,000.

Zoning
CD-1 (470) · Comprehensive Development
Neighbourhood
Renfrew-Collingwood
Permits on file
96
Assessed value (2026)
$506,834,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 2633 Nootka St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59151443, 499 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
499
Households
175
Median age
42.8
Median household income (2020)
$82,000
Own their home
57%
Vancouver: 45%
Average household size
2.9
Under 15
8%
65 and over
20%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-10-22 #350 - Exterior and interior alterations and a change of use/occupancy from School (A2) to Office (D) to this unit, approx. 723 sqm on the third floor of this existing commercial building on this site. BRB Notes: 1. Application reviewed under VBBL 2025. 2. Exterior alterations limited to roof-top AC unit. · $500,000
    VPAC Construction Group Ltd
    Issued
  2. 2026-10-08 #180 2985 Virtual way Interior alterations to remove non structural partition walls in this A2 occupancy (School) on the ground floor of this existing building. · $100,000
    Matra Construction Inc
    Issued
  3. 2026-08-25 UNIT #110 & #150 - Levels 1 & 2 (Building 5) Interior alterations to provide improvements for a new office tenant in units #110 and #150 on levels 1 and 2 in this existing commercial building on this site. · $1,250,000
    M Moser Associates Inc
    Issued
  4. 2026-06-04 #310 demising into two units to be #310 and #350 (level 3 - 5th storey) Interior alterations to the existing vacant Institution/School space on the 3rd floor, to demise unit #310 into two units (to be #310 and #350) only, in this existing commercial building on this site. * In accordance with VBBL 2025 *Separate permit(s) will be required for further improvement to these spaces. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $56,000
    Central West Project Management Inc.
    Issued
  5. 2026-06-02 #200 - 2nd Floor Interior alterations to provide improvements to this new office tenant on the 2nd floor (#200) in this existing commercial building on site. Scope of work: Selective demolition to accommodate a revised layout that includes new walls for offices and meeting rooms, new accessible/unisex washrooms, flooring, electrical, mechanical, plumbing and sprinkler work to suit. TENANT: Infosys · $5,500,000
    no contractor listed
    Issued
  6. 2026-03-11 2910 Virtual way - floors 1 to 4. Interior alterations to provide improvements for a new office tenant on the 1st to 4th floors of this existing commercial building. Scope of work: Select demo to all 4 floors, including electrical and mechanical upgrades, addition of turnstiles, millwork, phone booths and new furniture in select areas. REVISION #1 - removal of existing and proposed phone booths and of new fire alarm gong, new fire alarm strobe, and data drops from the scope. June 26/ 26 mk In accordance with VBBL 2025. · $4,000,000
    no contractor listed
    Issued
  7. 2026-02-04 #180 - 1st Floor Interior alterations to provide tenant improvements for this new office tenant at unit #180 on the ground floor of this existing commercial building on this site. Scope of work: Demo and construction to select areas to alter layout. Electrical, sprinkler and mechanical/plumbing work to suit. · $900,000
    Fusion Project Management Ltd
    Issued
  8. 2026-01-28 #400 - 4th floor (6th storey) Interior alterations to provide improvements for this existing full floor office tenant on the 4th floor, unit #400 of this existing commercial building on this site. Scope of work: demolition of one solid wall and two glass walls with doors and frames, along with minor ceiling adjustments for code compliance and finishing. Electrical to suit. In accordance with VBBL 2025 District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $44,000
    Omicron Construction Ltd
    Issued
  9. 2026-01-20 #200 - 2nd Floor Interior alterations to provide tenant improvements for a new office tenant on the 2nd floor (#200) in this existing commercial building on site. Scope of work: Construct new partitions/doors to create private offices, new millwork and electrical work. TENANT: Co-operative Housing Federation of BC · $1,500,000
    Aura Office Environments Inc
    Issued
  10. 2026-01-19 #180 - 2925 Virtual Way Interior alterations to provide tenant improvements to this existing Office space for a new Health Care Office tenant in this unit #180 at this existing commercial building 2925 Virtual Way. This is a sprinklered building. Sprinkler Contractor: T G Fire Protection · $485,000
    Kindred Construction Ltd
    Issued
  11. 2025-11-05 #430- 2955 Virtual Way Interior alterations to provide tenant improvement for this existing General Office tenant on the 4th floor (#430) in this existing commercial building. Scope of work: Select demo of partition walls and construct new partition walls, glazing, doors/frames, millwork, finishes. Electrical, and Sprinkler to suit. OK for field review per City staff: 1. DBI to confirm if sprinkler work is required. 2. This permit is reviewed under VBBL 2025. · $30,000
    no contractor listed
    Issued
  12. 2025-09-17 Building 2 Interior alterations for improvements to the change rooms in the common areas of Building 2 on the P1 level at 2955 Virtual Way of this existing commercial building on this site. Revision #1: Shower location change, plumbing and electrical to suite. · $200,000
    no contractor listed
    Issued
  13. 2025-09-17 Building 1 Interior alterations for improvements to the change rooms in the common areas of Building 1 on the P2 level at 2925 Virtual Way of this existing commercial building on this site. · $200,000
    no contractor listed
    Issued
  14. 2025-09-17 Building 3 Interior alterations for improvements to the change rooms in the common areas of Building 3 on the P2 level at 2985 Virtual Way of this existing commercial building on this site. · $200,000
    no contractor listed
    Issued
  15. 2025-09-17 2955 Virtual Way Interior alterations to provide upgrade to the existing common washrooms on Level 4 of this existing mixed use building. OK for field review per City staff · $120,000
    no contractor listed
    Issued
  16. 2025-08-13 Unit #450 2955 Virtual Way Interior alterations to provide improvements to this existing General Office space at unit #450 - 2955 Virtual Way in this existing commercial building on this site. OK for field review as per City staff · $80,000
    no contractor listed
    Issued
  17. 2025-02-03 Interior alterations to provide tenant improvements for a new Limited food service tenant (Fresh Slice Pizza - E) on the P3 level to this existing 6-storey mixed-use commercial building (BLDG 6) on this site. Notes: 1. Proposed occupant load: 6 seats + 2 staff 2. Any increase in occupant load may require further review of the VBBL and additional washroom requirement analysis. 3. Permit reviewed and approved to VBBL #12511 (2019) · $60,000
    no contractor listed
    Issued
  18. 2024-12-13 #150 - 3rd storey Interior alterations to provide improvements for an existing office space on the 3rd storey (#150) of this existing commercial building. Scope of work: -add new kitchenette in Breakout Area 007 and new doors into existing Work Benching Area 010. Electrical and plumbing to suit. ok for Field Review per City staff. · $65,000
    Reotech Construction Ltd
    Issued
  19. 2024-12-12 #100 - Office Lobby Interior alterations to provide improvements to the existing office lobby on Level 1 of this existing commercial building. Scope of Work: Selective demo, new millwork, finishes, electrical and sprinkler work. · $350,000
    no contractor listed
    Issued
  20. 2024-09-26 #130 - 1st floor/3rd storey Interior alterations to provide tenant improvements for a new office tenant on the first floor/3rd storey (#130) of this existing commercial building. Scope of work: Remove existing workstations, filing cabinets, patch/repair/paint existing walls. Construct new partitions, doors for 2 new offices, ceiling grid, electrical and sprinkler as required for new layout. TENANT: RBC · $448,876
    no contractor listed
    Issued
  21. 2024-05-02 #230 - 2955 Virtual Way interior alterations to provide improvements for a new office tenant on the 2nd floor (#230) of this existing commercial building. Scope of work; select demo of partition walls and construct new partition walls, doors/frames , millwork, finishes. Electrical, mechanical/plumbing, Sprinklers to suit. · $150,000
    Humphries Construction Group Ltd
    Issued
  22. 2024-04-16 unit #110 - 2925 Virtual Way Interior alterations to provide improvements to this existing office space on the 1st floor (unit #110) of this existing commercial building on this site. Scope of work: select demo of partition walls, doors/frames, bulkhead, & glazing to create open floor plan. Replace millwork to update existing kitchen. Electrical, & plumbing to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $165,000
    TotalPlan Inc
    Issued
  23. 2024-04-12 unit #150 - 2925 Virtual Way Interior alterations in this existing office space for the removal of non-load bearing partition walls in unit #150 on level one (3rd storey) of this existing commercial building on this site. Scope of work: demolition of existing partitions, existing doors with side lites and mill work closet in open area 014. Electrical and Sprinkers to suit. REVISION #1 - Fill in partition walls in 7 areas where door frames and sidelites were removed. April.23/24 mk Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $16,200
    Reotech Construction Ltd
    Issued
  24. 2024-03-26 Level 2 washrooms (* SEE Rev #1) Interior alterations alterations to provide improvements to the 1st and 2nd floor common washrooms in this existing commercial building. Scope of work: remove and replace plumbing fixtures, new partitions, finishes. Electrical, Mechanical/plumbing, Sprinklers, HVAC to suit. * REVISION #1 - Remove level 1 washroom renovation from scope of work. - District Building Inspector to determine if a Special Sprinkler Inspection is required. · $195,000
    no contractor listed
    Issued
  25. 2024-02-09 Level 1 & 2 - common washroom Interior alterations to provide upgrade to the existing common washrooms on the 1st and 2nd floors of this existing mixed use building. Scope of work: Remove and replace walls, flooring, ceiling wall, plumbing fixtures & HVAC. REVISION #1: Remove all washroom renovation scope on Level 1. June 13/24 - LLL OK for Field Review by Wayland Wong - Jan/2024 · $195,000
    Matra Construction Inc
    Issued
  26. 2024-02-01 #300 - 3rd floor - 2955 Virtual Way - Building 2 Interior alterations to provide improvements for an existing office tenant on the 3rd floor (#300) of this existing commercial building. Scope of work; work to be done in 3 phases to the south end. Demo/construct partition walls, doors, millwork, finishes. Ceiling, Electrical, Mechanical, Sprinklers to suit. REVISION #1: Change of furniture/desk layout, re-locating a condensing unit to parkade level generator room, new automatic door operators and card readers, added and revised structural details. Increase in project cost of $30,000. - October 10/24 - LLL · $2,030,000
    no contractor listed
    Issued
  27. 2024-01-10 #130 - 2945 Hebb Ave Interior renovations to install racking in existing storage warehouse. Scope of work to include installation of seven rows of 12' high storage racks. Ok for field review per City staff: Vethanayagam EInstein Barathyra - [contact removed] · $36,000
    ARPAC Storage Systems Corporation
    Issued
  28. 2023-11-03 Change of Major Occupancy: Interior Alterations, combing of unit with suite #180 (DB-2022-0038), and change of major occupancy from Office (Group D) to Institution / School (Group A2) on the first floor of this existing 4-Storey commercial building (Building 3). This project is considered a Minor Renovation and a Change of Major Occupancy with no Hazard Index Increase, as per City stafftriggers F2, S3, N3, A3 apply to this project. · $2,530,000
    Humphries Construction Group Ltd
    Issued
  29. 2023-08-25 Building permit for DP-2023-00271 Interior alterations to reconfigure a portion of the parking layout on level P2 and P3 of this existing commercial building on the site. Revision #1: To delete previous scope of work proposed at P2 level and to relocate the new chain link fence line and drive isle from gridline 16 to gridline 18 at P3 level. OK for Field Review as per City staff · $64,000
    Matra Construction Inc
    Issued
  30. 2023-07-31 Building Permit for DP-2023-00080 Interior and exterior alterations to change the use and major occupancy from General Office (Group D) to School - University or College (Group A2) on the first to fourth floor level of this existing mixed use building. Suites #120 #150 and #300 are to be posted at the suite entries and in accordance with the Building By-law prior to final inspection. Building Review Branch Notes: F4, S4, N4, and A4 upgrades required. See commitment letter dated, July 28th, 2023 for N4 Upgrade. Site inspection and report of the required remedial work to be completed by September 15th, 2023 and provided to the City for review. Required N4 work to be completed prior to occupancy. Refer to AL-2023-00063 for interconnecting stair. ***Conditional Acceptance of this Alternative Solution for 2920 Virtual Way for two new unenclosed convenience stairs between the 3rd and 4th floors, without review of potential interactions with previously accepted and implemented equivalencies and alternative solutions, is provided subject to the following: 1. Prior to the issuance of occupancy permit, the owner will: a. Engage a code consultant to review the previously existing equivalencies and alternative solutions relevant to this complex of buildings to establish their applicability to the subject building. b. Establish a plan to resolve any inconsistencies or incompatibilities related to these equivalencies and alternative solutions, and the proposed new work and alternative solution. c. Coordinate with the code consultant to retire, revise, or replace the existing equivalencies or alternative solutions related to the affected complex of building to ensure compatibility with the subject alternative solution. 2. Develop an acceptable plan of action to establishing how they may simply the existing set of equivalencies and alternative solutions, and facilitate future tenant improvement and renovation work to the complex of buildings. · $8,650,000
    no contractor listed
    Issued
  31. 2023-06-21 #300 - full 3rd floor, and a portion of the 4th floor Interior alterations to remove all non load bearing partition walls in this existing vacant office space on the 3rd floor (full) and portion of 4th floor (#300) of this existing commercial building. Scope of work: to remove all partition walls, doors, t-bar ceiling grid, finishes , electrical and plumbing and bring to shell to prepare for new tenant space. See related BP-2023-00628 for tenant improvements. · $65,000
    VPAC Construction Group Ltd
    Issued
  32. 2023-06-05 Interior alterations to combine these two existing storage warehouse unit #130 -2935 Hebb Av and 2945 Hebb Ave by installing a roller door in the demising wall on the P3 level of this existing commercial building (building 7 - 2940 Virtual Way) on this site. · $20,000
    no contractor listed
    Issued
  33. 2023-04-21 #430 - 4th floor Interior alterations to provide tenant improvement for this existing General Office tenant on the 4th floor (#430) in this existing commercial building. Scope of work: remove/construct partition wall/door, replace existing wood entry door with glass entry, new millwork, countertop, electrical and sprinkler work. TENANT: Quadreal Property Group Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $25,000
    TotalPlan Inc
    Issued
  34. 2023-03-16 Interior alterations to provide tenant improvements for a new office tenant occuyping the entire building in this existing commercial building on this site. Scope of work: selection remove/construct partition walls/doors on all 4 floors, new finishes, ceiling work, HVAC, electrical, plumbing, mechanical and sprinkler work. TENANT: Fortinet Technologies Canada · $3,000,000
    Matra Construction Inc
    Issued
  35. 2023-01-31 #200 - 2nd floor (full floor tenant) Interior alterations to provide improvements for this existing office tenant on the 2nd floor (#200) in this existing commercial building on this site. Scope of work: construct partition walls/door for a new room, remove existing t-bar ceiling, relocation of electrical (power/data and lighting) and HVAC, electrical and sprinkler work. TENANT: Golder Associates Ltd. · $18,500
    VPAC Construction Group Ltd
    Issued
  36. 2022-10-04 #200 - 2nd floor/4th storey (Building 1) Interior alterations to provide tenant improvements for this existing full floor General Office tenant on the 2nd floor/4th storey (#200) in this existing commercial building on this site. Scope of work: select demo and new partition walls/doors to create 3 private offices, open workspace, and boardroom. Electrical and sprinklers to suit. TENANT: BC Assessment Authority OK for Field Review per City staff; Sept. 12, 2022 E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Required · $65,400
    no contractor listed
    Issued
  37. 2022-09-29 #130 Interior alterations to renovate this existing warehouse unit #130 on the P3 Level of this existing commercial building. The scope include to add a public corridor to access the automatic transfer switch room. OK for field review per City staff · $70,000
    no contractor listed
    Issued
  38. 2022-09-02 #205 - 2nd floor Interior alterations to provide tenant improvements for a new office tenant on the 2nd floor (#205) in this existing mixed use building. Scope of work: remove/construct partition walls, doors, millwork, ceiling work, finishes, lighting, electrical, mechanical, plumbing and sprinkler work. TENANT: Clarius Mobile Health NOTE: Related to BP-2022-00869 to demise #201 into #201 and #205 and AL-2022-00104 · $70,000
    no contractor listed
    Issued
  39. 2022-08-25 (#380) Interior alterations to provide tenant improvement for an existing office tenant on the 3rd level of this existing commercial building. Scope of work includes: Updating finishes throughout the office. Modify staff kitchen and locker room layout. Ok for field review as per City staff. Notes: 1. This building is sprinklered. 2. Energy upgrade triggers: E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) · $65,000
    Matra Construction Inc
    Issued
  40. 2022-08-17 # 201 - 2nd floor (#205 is the new unit address) AL-2022-00104 (Sprinkler Water Curtain for Glazed Exit Corridor) Interior alterations to provide improvements and to demise unit #201 into two units for this existing general office tenant in the 2nd floor in this existing commercial building on this site. Scope of work: restore new suite to base building condition. Replace existing finishes to existing men and women washrooms. · $70,000
    no contractor listed
    Issued
  41. 2022-06-14 Interior alterations to convert a portion of the parkade to End of Trip facilities (Drying Room) on Parking level P2 between building 5 & 7 at this commercial building on this site. · $72,000
    no contractor listed
    Issued
  42. 2022-04-06 Lagan 101015740962 #400 - Floor 4 Interior alterations to provide improvements for this new office tenant in this existing full floor office unit (400) in this existing commercial building on this site. Scope of work: full office fit out including walls, ceiling, millwork, finished, electrical, lighting, mechanical and plumbing. OK for field review as per City staff · $2,750,000
    no contractor listed
    Issued
  43. 2022-03-30 Interior alterations, combing of suite 150 & 180 and the change of use from Office (D) to Institution/ School (A2) for Suite 180 on the first floor of this existing office space in this 4 story commercial building. Scope of work includes relocating existing training area, open work area and pantry. New secured doors and relocation of existing doors. To be reviewed under the 2019 VBBL. Revision #1 - changes to interior layout, including retaining the existing suspended ceiling throughout the suite. - accepted Aug.2/22 · $798,877
    no contractor listed
    Issued
  44. 2022-03-28 Interior alterations and change of occupancy from Office (D) to Institution/ School (A2) on the third floor, Suite #310, of this existing office space in this 4 story commercial building. To be reviewed under the 2019 VBBL with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022 Revision #1 - changes to interior layout including retaining the existing suspended ceiling throughout the suite. - accepted Aug.2/22 · $1,300,000
    no contractor listed
    Issued
  45. 2022-02-03 #280 - Level 2 (Building 3) Interior alterations to provide tenant improvements for a new office tenant on the 2nd floor (#280) of this existing commercial building. Scope of work: remove/construct partition walls, doors, millwork, finishes, ceiling work, HVAC, lighting, electrical, plumbing, mechanical and sprinkler work. TENANT: Axis Communications · $650,000
    no contractor listed
    Issued
  46. 2021-10-26 #201 - 2nd floor (full floor tenant) Interior alterations to provide improvements for this existing full floor general office tenant on the 2nd floor (#201) in this existing commercial building on this site. Scope of work: remove/construct partition walls, doors, millwork, finishes, reconfiguration of HVAC, new lighting, electrical, plumbing, mechanical and sprinkler work. TENANT: Bell Canada · $1,000,000
    no contractor listed
    Issued
  47. 2021-09-20 #130 - 1st floor/3rd storey Interior alterations to provide tenant improvements for an existing office tenant on the first floor/3rd storey (#130) of this existing commercial building. scope of work: remove and relocate staff kitchen, relocate and replace electrical, plumbing and sprinkler as required for new layout. TENANT: HSBC · $100,000
    Gibraltar Holdings Ltd
    Issued
  48. 2021-08-16 #30 Interior alterations for a new Limited food service tenant in this existing commercial building. This is the first TI Scope of work: New wall, millwork, ceiling, kitchen equipment, Electrical and Mechanical work OK for Field Review per City staff · $129,000
    Blue Rock Construction Management Ltd
    Issued
  49. 2021-05-25 Interior alterations to divide existing #30 office space into 2 separate shell tenant spaces and changing the use of #30 to retail and newly created unit to storage warehouse in this existing 4 story sprinklered building. Note: 1.0. Separate permits required for any future tenant improvements. 2.0. This application is reviewed under VBBL 2019 and issued during health pandemic of 2020 and 2021. · $5,000
    no contractor listed
    Issued
  50. 2021-03-09 Interior alterations to provide a new racking system on the main floor of unit #120 of this existing storage warehouse at this existing commercial/industrial building on site. · $4,700
    ARPAC Storage Systems Corporation
    Issued
  51. 2021-02-22 Interior alterations only to reverse doors at vestibules accessing from Building 7 at 2940 Virtual Way to P2 & P3 levels of Parkade in Building 5 at 2930 Virtual Way and to install electromagnetic locks on these doors in order to restrict accesses to Building 7. Scope of work includes addition of two new doors at the existing end-trip facilities on P2, removal of two parking stalls on P2, minor duct work, and reversing the direction of the existing horizontal exits in order to lead from Building 7 to Building 5 on these two levels. OK for DB as per City staff. · $124,058
    Reotech Construction Ltd
    Issued
  52. 2020-09-22 unit #110 Interior alterations to provide improvements to this existing laboratory unit #110 on the P3 Level in this existing commercial building (Building 7) on this site. OK for field review per City staff · $220,000
    no contractor listed
    Issued
  53. 2020-01-06 P3 Alterations to relocate fencing and parking gate within P3 level. · $25,000
    Gibraltar Holdings Ltd
    Issued
  54. 2019-12-23 #265-Level 2 (Building 3) Interior alterations only to install one (1) new partition to create two (2) office rooms for an existing General Office tenant in this existing commercial building. Tenant: Dynacare OK for field review and district building inspector to determine if a sprinkler permit would be required as per City staff. Energy upgrade exemption: BOMA BESt · $11,800
    Gibraltar Holdings Ltd
    Issued
  55. 2019-11-29 1st, 2nd, 3rd floors-Building 4 *See Revised Interior alterations to provide minor interior alterations to the first, second, and third floors in this existing General Office use dba HSBC Bank of Canada at this existing commercial Building 4 site. This tenant occupies the entire building. Scope of work: 1st-new de-mountable partition, electrical work; 2nd-remove wall/door and wood slat wall; 3rd-remove wall and door and infill opening to suit new furniture layout, sprinkler work. * REVISION #1- Mar25/20 mk: - Add 4th floor to scope of work. - Remove interior walls & sliding doors to two offices. - Add interior partition to create one enclosed office. - Increase project value from $30,000 to $40,000 TENANT: HSBC Bank of Canada · $40,000
    Gibraltar Holdings Ltd
    Issued
  56. 2019-11-22 #250 - 2nd Floor (Building 2) Interior alterations to provide tenant improvements for a new General Office (D) tenant on the 2nd floor (#250) of this existing mixed use building. Scope of work: construct partition walls to create new boardroom, kitchen and storage room, finishes, millwork, lighting, ceiling work, electrical, plumbing, mechanical and sprinkler work. Revision #1 issued March 4, 2020 - Partition walls changed increasing size of storage room with new double doors. Relocate recessed suite entry to the common corridor. Remove wood features from walls and ceiling and change diffusers from slot to square. TENANT:QuadReal · $218,500
    no contractor listed
    Issued
  57. 2019-11-15 #300-3rd floor (full floor tenant) Interior alterations to provide tenant improvements on the 3rd floor (#300) of this existing mixed use building. Scope of work: demolish/construct partition walls, millwork, glazing, new doors, lighting, finishes, electrical and plumbing work. TENANT: Chemetics Inc. (Worley) *Reception on 2nd floor (#200) · $495,000
    Reotech Construction Ltd
    Issued
  58. 2019-11-15 #200-2nd floor (full floor tenant) Interior alterations to provide tenant improvements for this office space (#200) on the 2nd floor of this existing mixed use building. Scope of work: demolish/construct partition walls, millwork, glazing, new doors, lighting, finishes, electrical and plumbing work. TENANT: Chemetics Inc. (Worley) *Reception on 2nd floor (#200) · $439,000
    Reotech Construction Ltd
    Issued
  59. 2019-09-24 #490-Level 4/Building #2 Interior alterations to provide improvements for a new tenant in a newly created office space on the 4th floor (#490) in this existing commercial building. Scope of work: remove floor finishes, t-bar ceiling, GWB cove ceiling, partition walls, millwork, construct new partition walls, glazing, doors, millwork, finishes, electrical and plumbing work. TENANT: Trimble Canada Development · $400,000
    Reotech Construction Ltd
    Issued
  60. 2019-08-20 #400 & #490 - 4th floor Interior alterations to provide improvements for a new tenant to an existing office space on the 4th floor (#400) in this existing commercial building. Scope of work: demolish existing partitions, doors, millwork, and construct demising wall to create one "shell" unit (#490), and reconfigure existing layout to the existing office space (#400) and provide tenant improvements for unit #400 only. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to unit #490. · $100,000
    no contractor listed
    Issued
  61. 2019-03-27 #200 Interior alterations to provide improvements for new General Office tenant in unit #200 in this existing building. OK for field review as per City staffmise full tenant space into three units on this floor. Energy upgrade exempted: BOMA BESt (Path 1) · $1,200,000
    no contractor listed
    Issued
  62. 2019-02-28 #230 - 2nd level Interior alterations only to provide tenant improvements for a new general office tenant on the 2nd level (#230) in this existing commercial building on this site. Scope of work: construct interior partitions, doors, millwork, finishes, ceiling work, electrical, plumbing and sprinkler work. TENANT: Vard Note: See BP-2019-00207 to demise #200 into 3 units to be #200, #230 and #250. OK for field review as per City staff. No energy upgrade required. Note: Separate Sprinkler Permit required for proposed sprinkler work. · $90,000
    Allspaces Design & Management Ltd
    Issued
  63. 2019-02-13 #200, #230 & #250 - 2nd Level SHELL Interior alteration: Interior alteration to demise the existing tenant space into 3 suites. Note: Application is being reviewed under VBBL 2014. · $268,221
    no contractor listed
    Issued
  64. 2019-01-18 Interior alteration to remove chain link fence around automatic transfer switch for the emergency generator for this existing financial institution (HSBC) in this existing commercial building on this site. Okay for field review as per City staff · $100,000
    Gibraltar Holdings Ltd
    Issued
  65. 2019-01-07 2910 Virtual Way- Ground Floor To permit interior alterations to provide tenant improvements to this existing office space. HSBC occupies the entire space. Scope of work to include: Modifying the existing soup and salad bar in cafeteria area located within HSBC. Add new coffee/juice stations. relocate and add lighting fixtures and new mill work to accommodate new coffee/juice bar layout. · $100,000
    Gibraltar Holdings Ltd
    Issued
  66. 2018-11-20 #200 - 2nd floor (full floor tenant) Building 2 Interior alterations to demolish all interior partition walls in the existing office unit on the 2nd floor (#200) in this existing commercial building on this site. Scope of work: demolish all interior partition walls, doors, millwork, fixtures OK for field review per City staff. Notes: 1. Separate permit(s) required for future tenant improvements] 2. No Energy trigger required; Interior demolition Related to Special Sprinkler Permit No. IA-2018-01726 · $12,000
    Canadian Turner Construction Company Ltd
    Issued
  67. 2018-11-06 #200 - 2nd level Interior alterations to provide improvements to this existing full floor office tenant on the 2nd level (unit #200) of this existing commercial building on this site. Scope of work: minor demo, construct new corridor, relocate existing lighting for new corridor. OK for TIPs per City staffESt building. · $50,000
    no contractor listed
    Issued
  68. 2018-10-17 Unit #300 - 3rd floor Exterior and interior alterations to replace air-conditioning unit on the roof for this office unit #300 on the 3rd floor in this existing commercial building on this site. OK for Field Review per City staff · $225,000
    Willetts Contracting 2004 Ltd
    Issued
  69. 2018-09-06 #450 - 4th floor (Building 6) Interior alterations only to remove a portion of a demising wall thereby combining office units #402 and #450 (retaining #450) into one office unit on the 4th floor of this existing commercial building. TENANT: Copperleaf · $1,000
    Canadian Turner Construction Company Ltd
    Issued
  70. 2018-08-07 Interior alterations and change of use from office to school for new tenant in this existing commercial building. Notes: 1. Proposed classrooms are permitted to use existing washrooms in building. 2. Any increase in occupant load requires further review of the VBBL and may require additional washrooms. · $171,000
    no contractor listed
    Issued
  71. 2018-07-31 #110 & #180 Interior alterations to provide improvements for this existing General Office Tenant in unit #110 & #180 in this existing commercial building. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $300,000
    no contractor listed
    Issued
  72. 2018-07-23 #302 and #320 - 3rd floor (Bldg 3) Interior alterations to provide tenant improvements for a new full floor office tenant on the 3rd floor (#302 & #320) in this existing commercial building. Scope of work: relocate demising walls, demo/construct new partitions to reconfigure layout, RCP, plumbing, electrical, & sprinkler alterations. Revision #1- Including the report from GHL Consultants dated October 19, 2018, to add maglocks in the public corridor leading to the exit. No change to ASHRAE. Increase in value of $6,000 (total now $3,610,000.00). Oct.31/18 jm TENANT: Royal Bank of Canada · $3,610,000
    no contractor listed
    Issued
  73. 2018-07-03 Suite # 450 Interior alterations and a change of major occupancy from office (Group D) to assembly use (Group A Division 2) at this existing suite in an existing building @ Broadway Tech Centre. The new tenant will be New York Institute of Technology - Vancouver as per City staff · $32,500
    no contractor listed
    Issued
  74. 2018-06-25 #180 - Level 1 (Building 3) Interior alterations to demise unit #150 into two units to be #150 and #180 and to provide tenant improvements for this new General Office tenant space (#180) in this existing commercial building at 2985 Virtual Way. Scope of work: demolish partitions/doors, construct new demising wall, partitions, doors, ceiling work, electrical and sprinkler work. TENANT: Hyperwallet Systems Inc. Energy upgrade selected: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) OK for TIPS as per City staff. · $70,000
    Fusion Project Management Ltd
    Issued
  75. 2018-06-05 #450 Interior alteration to replace cabinetry and hot water tank in suite #450 on the 4th floor of this existing commercial building on this site. Okay for field review as per City staff.687.1800 A Tashiro [contact removed] Energy upgrade exempted under minor alterations project. · $30,000
    no contractor listed
    Issued
  76. 2018-06-05 #402 Interior alteration to reconfigure office space in suite #402 on the 4th floor of this existing commercial building on this site. Okay for field review as per City staff.687.1800 A Tashiro [contact removed] L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) · $220,000
    no contractor listed
    Issued
  77. 2018-03-16 #200-2nd floor/4th storey (Building 1) Interior alterations to provide tenant improvements for this existing General Office use on the 2nd floor/4th storey (#200) in this existing commercial building on this site. Scope of work: demolish and construct partition walls, doors, glazing, in four separate areas on this floor, electrical and sprinkler work. TENANT: BC Assessment Authority Ok for field review as per City staff · $145,000
    Matra Construction Inc
    Issued
  78. 2018-03-08 Suite #100 Interior alterations to reconfigure office layout including electrical/mechanical work at unit#100 in this existing commercial building. Ok for field review per City staffUpgrades Req'd · $35,000
    no contractor listed
    Issued
  79. 2018-01-25 #180-1st floor Interior alterations to provide tenant improvements for this existing office tenant at office unit #180 on the ground floor of this existing commercial building on this site. Scope of work: demolish/construct partition walls to create three new office spaces and to enlarge existing lunchroom, new doors, glazing, millwork and sink, power/data, finishes, lighting, electrical and sprinkler work. TENANT: Vard Marine Inc. OK for field review Per City staff. Note: Energy trigger chosen: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $82,000
    Counterpoint Interiors Inc
    Issued
  80. 2018-01-09 #275 - 2nd floor Interior alterations to provide tenant improvements for a new office tenant on the 2nd floor (#275) of this existing office building. Scope of work: demolish partitions, millwork and doors, construct new partitions, new glass entry door, ceiling work and electrical work. TENANT: Affinity Staffing OK for Field Review per City staff. NOTE: Related to BP-2017-01419, which needs to be completed prior to permit issuance. Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $38,000
    TotalPlan Inc
    Issued
  81. 2017-11-30 #380 - 3rd floor/5th storey (Building 1) Interior alterations only to provide tenant improvements to this existing General Office tenant on the 3rd floor/5th storey (#380) of this existing commercial building. Scope of work: demolish partition walls, remove and relocate doors and glazing, construct new partition walls to create new offices, lighting, ceiling and electrical work. · $30,000
    Matra Construction Inc
    Issued
  82. 2017-11-20 #200-2nd level/floor Interior alterations to provide improvements for this existing office tenant at #200 on the second level of this existing commercial building (Building No. 7) on this site. Scope of work: demolish partition wall, ceiling work, patch as required, new carpet. TENANT: British Columbia Lottery Corporation See related Special Sprinkler Inspection No. IA-2017-00999. OK for field review per City staff. Note: No energy trigger required; BOMA BESt building. · $5,000
    no contractor listed
    Issued
  83. 2017-11-03 #430 Interior alterations to provide tenant improvement for this existing General Office tenant in unit #430 on the 4th floor of this existing commercial building. OK for Field Review per City staff. BOMA BESt building · $300,000
    no contractor listed
    Issued
  84. 2017-10-27 #300-3rd floor (Building 2) Interior alterations to reconfigure the layout on the 3rd floor of this existing commercial building for the existing general office tenant. Scope of work: demolish partition walls, glazing and door, construct new walls (partition and privacy), remove one washroom, new doors and finishes, ceiling work, electrical, mechanical and sprinkler work. TENANT: BC Emergency Health Services · $300,000
    Willetts Contracting 2004 Ltd
    Issued
  85. 2017-10-25 2910 Virtual Way - ground floor Exterior and interior alterations to provide tenant improvements for this existing office tenant on the ground floor of this commercial building on this site. REVISION #1 - Deleted cash vault room and closet in back office area. New reflected ceiling plan. May 4 , 2018 jm OK for DB per City staff. OK for field review per City staff. · $100,000
    Halse Martin Construction Co Ltd
    Issued
  86. 2017-08-23 Interior alterations and change of major occupancy from office (D) to a laboratory (F2) with ancillary office of #290 in this existing commercial building. · $350,000
    CDC Construction Ltd
    Issued
  87. 2017-07-27 #150 - 1st flr (3rd storey) Interior alterations to provide improvements for this existing office tenant in unit #150 - first floor (3rd storey) of this existing commercial building on this site. Scope of work: demo millwork,closet, & glazing. Install/alter new partitions, bulkhead, millwork, finishes, electrical, & sprinklers. OK for field review per City staff. · $105,000
    Canadian Turner Construction Company Ltd
    Issued
  88. 2017-06-29 Outdoor Patio - To install a patio for the existing Restaurant - class 1 (Pho 99) on the site. Proposed 22 outdoor seats, total occupant load is 118 persons including staff. Building Review Branch Notes: - See DB-2016-02212 for related restaurant. - Maximum Occupant Load: 118 persons (interior 86 seats plus 10 staff, exterior 22 seats) - A permanent sign indicating the above maximum occupant load shall be posted in a conspicuous location. - All signage to have separate sign permits. - At least one accessible seating area shall be provided. Development Review Branch Notes: 1. The outdoor patio of 22 seats is for the exclusive use of Pho 99, unless otherwise permitted by the Director of Planning. If the tenant ceases to exist, Planning may wish to seek additional information regarding the new tenant space and potentially a new application if they wish to utilize this outdoor patio. 2. The outdoor seating area is to be closed and cleared of customers by 11:00 p.m. nightly. 3. There is to be no amplified music or live entertainment on the outdoor seating area at any time. 4. The outdoor seating area must comply with the applicable provisions of the Health By-law, smoking in and around the outdoor seating area is not permitted. 5. Maximum number of seats for the outdoor seating area is 22. · $8,000
    no contractor listed
    Issued
  89. 2017-06-14 Interior alterations only to relocate a security fence to enlarge the security area of the existing parkade (Level P3) of the existing commercial building reconfigure the parking layout. Scope of work includes relocation of an exit gate and installation of a new exit sign. OK for Field Review as per City staff · $8,000
    Gibraltar Holdings Ltd
    Issued
  90. 2017-06-07 (Ground level) Interior alterations to provide a meeting room for this existing general office tenant on the ground floor of this existing commercial building on this site. OK for SIPS per City staff · $30,000
    Gibraltar Holdings Ltd
    Issued
  91. 2017-05-24 #275 & #278-2nd floor Interior alterations to demise office unit #278 creating office units #275 and #278 on the second floor of this exiting commercial building on this site. Scope of work to include an entry door to unit #275. Other tenant improvement work is for #278 only which includes demolition of interior walls to create open office space, enlarge some existing offices, new large boardroom, finishes, lighting, electrical and sprinkler work. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for tenant improvements for newly demised #275. TENANT: Director's Guild of Canada-BC District Council OK for field review per City staff. Energy trigger chosen; L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems · $120,000
    TotalPlan Inc
    Issued
  92. 2017-03-24 Interior alteration and change of use from Restaurant Shell (A2) to Health Care Office (D) in this existing unit 2917 Hebb Av in this existing building #6 on this site. Scope of work includes installing non-load bearing partition walls and creating two washrooms, one of them being accessible. Note: Okay for field review as per City staff: No elevation required as there are no exterior alterations. Mechanical intake and exhaust to be tied into existing system. As per City staff1899 to 1900. There are 2413 provided. Parking is okay. · $150,000
    no contractor listed
    Issued
  93. 2017-02-20 #200 - 2nd floor Interior alterations to provide tenant improvements for this existing General Office tenant at on the 2nd floor (unit #200) of this existing commercial building. Scope of work: to demo and remove all partitions, doors, finishing to create new open floor plan. New partitions, electrical, ceiling, millwork, finishes, & sprinkler alterations. OK to process as TIPS as per City staff. Energy Upgrade Exempt: BOMA BESt Building. · $250,000
    no contractor listed
    Issued
  94. 2017-02-17 #400 - Interior Alterations to provide tenant improvements for a new Office tenant in unit #400 on the entire 4th floor of this commercial building. Tenant: Postmedia Network Inc OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $790,000
    Fusion Project Management Ltd
    Issued
  95. 2017-02-10 (#380) Interior alterations to provide tenant improvement for an existing office tenant on the 3rd level of this existing commercial building. Scope of work is to create 1 new office room. Ok for field review as per City staff: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) · $12,000
    no contractor listed
    Issued
  96. 2017-02-10 (#100) Interior alterations within the Security room of this existing tenant #100 in this existing commercial building on this site. Scope of work includes remove non-load bearing wall and repair finishes. OK for field review per City staff. Energy upgrade exempt: Minor alteration · $12,000
    New Image Projects Inc.
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Renfrew-Collingwood

2889 E 12TH Av
#600 & # 700 - 2889 E 12TH AV Interior alteration to this existing Office (Group D) to office at #600 + 700 - 2889 E 12th Ave. on the sixth and seventh floor of this existing commercial building on this site. Ok for BP, field review per City staff · Fusion Project Management Ltd
2026-11-02
43 Dieppe Place
To construct a Multiple Dwelling 'Multiplex' with a two-storey plus basement two dwelling unit front building and a two-storey two dwelling unit rear building with an attached 3-car carport and 1 surface parking, providing total 4 parking spaces, having vehicular access from the rear lane. Building 1: BP-2026-00771 (Site permit and Building 1 permit) - Two dwelling units (South - Front) Building 2: BP-2026-00772 - Two dwelling units (North - Rear) This permit is for site project work and construction of Building 1. Note: The entire building to be sprinklered to 2 x NFPA 13D. Note: This is a 2 storey building pursuant to the Zoning and Development By-Law 1.\tHRV proposed – Located in basement floor mechanical room 2.\tHeat Pump proposed – Exterior component located in front and east side, Interior component located in second floor closet · MINHAS HOLDINGS INC
2026-10-30
3263 Matapan Crescent
*Part 5* To construct a three-storey 4-unit Multiple Dwelling "Multiplex" and detached carport with 4 parking spaces having access from the lane. Notes: 1. Building to be sprinklered to Modified NFPA 13R per bulletin 2025-003-BU 2. Schedules submitted: A / B (Struct), B (Guards), B/D (Env), B (Geo) Permit issued pursuant to VBBL 2019 · JRXL Developments Ltd
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.