This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
2550 Garden Drive, Vancouver
An address in Kensington-Cedar Cottage, Vancouver, zoned CD-1 (747) (Comprehensive Development). 15 building permits are on file, most recently “Bucci Garden Homes Limited will be demolishing the 7 single-family homes located at 2542 …” (issued 26 November 2020). The City's 2026 assessed value for the 70 accounts at this address is $61,958,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59151423, 724 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2020-11-26
Bucci Garden Homes Limited will be demolishing the 7 single-family homes located at 2542 - 2570 Garden Drive & 2309-2369 E 10th Ave and will be building a new 6 storey wood frame strata condominium with 2 levels of underground parking. This is a CP Process Permit reviewed under the 2019 VBBL during the Covid 19 pandemic. · $15,227,758
no contractor listed Issued -
2020-10-15
To demolish this existing one-family dwelling (1983) to grade on this site. OK for SIPs without plans per City staff: Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
Clearview Demolition Ltd Issued -
2020-10-15
To demolish this existing one-family dwelling (1984) to grade on this site. OK for SIPs without plans per City staff: Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
Clearview Demolition Ltd Issued -
2020-10-15
To demolish by deconstruction this existing one-family dwelling (1946) to grade on this site. OK for SIPs without plans per City staff: 1. Green demolition Conditions apply. 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed] 2. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
Clearview Demolition Ltd Issued -
2020-10-15
To demolish by deconstruction this existing one-family dwelling (1946) to grade on this site. OK for SIPs without plans per City staff: 1. Green demolition Conditions apply. 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed] 2. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
Clearview Demolition Ltd Issued -
2020-10-15
To demolish by deconstruction this existing one-family dwelling (1946) to grade on this site. OK for SIPs without plans per City staff: 1. Green demolition Conditions apply. 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed] 2. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
Clearview Demolition Ltd Issued -
2020-10-15
To demolish this existing one-family dwelling (1984) to grade on this site. OK for SIPs without plans per City staff: Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
Clearview Demolition Ltd Issued -
2020-10-15
To demolish by deconstruction this existing one-family dwelling (1946) to grade on this site. OK for SIPs without plans per City staff: 1. Green demolition Conditions apply. 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed] 2. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
Clearview Demolition Ltd Issued -
2020-08-18
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Ramin Hamidnejad, Kinetic OHS Services Ltd. [contact removed] Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver.
Clearview Demolition Ltd Issued -
2020-08-18
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Ramin Hamidnejad, Kinetic OHS Services Ltd. [contact removed] Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver.
Clearview Demolition Ltd Issued -
2020-08-18
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Ramin Hamidnejad, Kinetic OHS Services Ltd. [contact removed] Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver.
Clearview Demolition Ltd Issued -
2020-08-18
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Ramin Hamidnejad, Kinetic OHS Services Ltd. [contact removed] Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver.
Clearview Demolition Ltd Issued -
2020-08-18
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Ramin Hamidnejad, Kinetic OHS Services Ltd. [contact removed] Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver.
Clearview Demolition Ltd Issued -
2020-08-18
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Ramin Hamidnejad, Kinetic OHS Services Ltd. [contact removed] Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver.
Clearview Demolition Ltd Issued -
2020-08-17
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Ramin Hamidnejad, Kinetic OHS Services Ltd. [contact removed] Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver.
Clearview Demolition Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Kensington-Cedar Cottage
847 E 22nd Avenue Exterior and Interior alterations to add additional area on the main floor and convert the ground floor to a secondary suite at this existing single detached house on this inside with no lane site. No off street parking required. Okay for field review as per City staff · no contractor listed2026-11-02
To construct a two storey, three-unit dwelling unit with an attached carport 'Multiplex'. Refer to BP-2025-04338 for Building 1 and site work. BRB Notes: 1. Reviewed under 2025 VBBL 2. Building sprinklered to Modified NFPA 13R 3. Part 5 Design 4. Attached carport complying with 9.10.15.4(11)(a) through (d) · no contractor listed2026-11-02
To construct a Multiple Dwelling "Multiplex" with three storey, two dwelling units for Bldg 1, and two storey, three-unit with an attached carport, for a total of 2 buildings and 5 units on this site. This permit is for the site project work and construction of Bldg 1 (BP-2025-04338). Bldg 1 (& site project work) BP-2025-04338 - East - 2 DU Bldg 2 - BP-2025-04339 - West - 3 DU BRB Notes: 1. Reviewed under 2025 VBBL 2. Building sprinklered to NFPA 13D 3. Part 5 Design · Modern Styles Home Ltd2026-11-02