Permit GopherAlberta and B.C. property, permit and zoning records

255 E 7th Av, Vancouver

An address in Mount Pleasant, Vancouver, zoned IC-3 (Industrial). 1 building permit is on file, most recently “Interior alterations and change of use from Artist studio class A (F2) to Production stud…” (issued 18 May 2022). The City's 2026 assessed value is $6,347,702.

Zoning
IC-3 · Industrial
Neighbourhood
Mount Pleasant
Permits on file
1
Assessed value (2026)
$6,347,702
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 255 E 7th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153164, 2,058 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
2,058
Households
1,365
Median age
35.6
Median household income (2020)
$94,000
Own their home
42%
Vancouver: 45%
Average household size
1.5
Under 15
5%
65 and over
6%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2022-05-18 Interior alterations and change of use from Artist studio class A (F2) to Production studio (F2) in this existing Municipally Designated Heritage C commercial building on this site. Scope of work includes constructing interior partition walls to create two rooms, installing a raised floor, validating the washrooms and kitchenette, constructing an interior ramp and changing the lighting throughout. Ok for field review as per City staff: - Energy Upgrade: E2 - Lighting - Upgrade to incorporate scheduled shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016) - This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required. - Storefront glazing is to remain clear and unobstructed. No translucent or opaque film, artwork, shelving, display case, curtains or similar elements are to be installed on or directly outside or inside of the approved glazing. Separate permit is required for all signage Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $50,000
    Mercury Contracting Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Mount Pleasant

1255 E 15TH Av
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed
2026-10-30
95 E 15TH Av
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.
2026-10-30
345 W 11TH Av
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes
2026-10-16
Something wrong on this page? Tell us and we'll check it against the City's records.