Permit GopherAlberta and B.C. property, permit and zoning records

2480 Renfrew St, Vancouver

An address in Hastings-Sunrise, Vancouver, zoned CD-1 (846) (Comprehensive Development). 15 building permits are on file, most recently “This permit is for the site work and construction of a basement storage garage for the fo…” (issued 28 August 2026). The City's 2026 assessed value is $15,191,000.

Zoning
CD-1 (846) · Comprehensive Development
Neighbourhood
Hastings-Sunrise
Permits on file
15
Assessed value (2026)
$15,191,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 2480 Renfrew St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59151413, 696 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
696
Households
300
Median age
39.6
Median household income (2020)
$76,000
Own their home
50%
Vancouver: 45%
Average household size
2.5
Under 15
9%
65 and over
20%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-08-28 This permit is for the site work and construction of a basement storage garage for the following development: To construct 2 buildings (159 secured market rental units) consisting of: 1st storey - 3 CRU's; underground parking Building 1: 13-storey mixed-use building (South) 1st storey - 3 CRUs 2nd storey - lobby; rental office; mailroom 3rd to 12th storeys - dwelling units 13th storey - indoor & outdoor amenities Building 2: 10-storey mixed-use building (North) 1st storey - underground parking 2nd storey - lobby; 2 CRUs; partial underground parking 3rd storey - 1 CRU; indoor amenity; bike rooms 4th storey - bike rooms 5th to 9th storeys - dwelling units 10th storey - indoor & outdoor amenities all over 2 additional levels of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required. 3. The 1st and 2nd storeys of Building 1, as well as the 2nd storey of Building 2, are ground levels due to the sloping site. Refer to BP-2025-03852 for Building 1. Refer to BP-2025-03853 for Building 2. STAGED CONSTRUCTION STAGE I: Excavation & Shoring (S.Yoo) ISSUED: Aug. 28, 2026 STAGE II: Foundation up to Grade - In review · $76,634,000
    Syncra Construction Corp
    Issued
  2. 2025-08-19 To demolish this 1 storey commercial building. No Excavation or shoring work is permitted. Note: 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $110,000
    MVP Group Recycle Limited
    Issued
  3. 2025-06-11 To demolish this existing Single Detached House. No Excavation or shoring work is permitted. Note: 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $65,000
    MVP Group Recycle Limited
    Issued
  4. 2025-06-11 To demolish this existing Single Detached House. No Excavation or shoring work is permitted. Note: 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $65,000
    MVP Group Recycle Limited
    Issued
  5. 2025-06-11 To demolish this existing Single Detached House. No Excavation or shoring work is permitted. Note: 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $65,000
    MVP Group Recycle Limited
    Issued
  6. 2025-06-11 To demolish this existing Single Detached House. No Excavation or shoring work is permitted. Note: 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $43,000
    MVP Group Recycle Limited
    Issued
  7. 2025-06-11 To demolish this existing Single Detached House. No Excavation or shoring work is permitted. Note: 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $65,000
    MVP Group Recycle Limited
    Issued
  8. 2025-06-11 To demolish this existing Single Detached House. No Excavation or shoring work is permitted. Note: 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $65,000
    MVP Group Recycle Limited
    Issued
  9. 2025-04-23 Salvage And Abatement Permit for BP-2025-01533. Issued separately.
    MVP Group Recycle Limited
    Issued
  10. 2025-04-23 Salvage And Abatement Permit for DB-2025-01530. Issued separately.
    MVP Group Recycle Limited
    Issued
  11. 2025-04-23 Salvage And Abatement Permit for DB-2025-01529. Issued separately.
    MVP Group Recycle Limited
    Issued
  12. 2025-04-23 Salvage And Abatement Permit for DB-2025-01527. Issued separately.
    MVP Group Recycle Limited
    Issued
  13. 2025-04-23 Salvage And Abatement Permit for DB-2025-01526. Issued separately.
    MVP Group Recycle Limited
    Issued
  14. 2025-04-23 Salvage And Abatement Permit for DB-2025-01525. Issued separately.
    MVP Group Recycle Limited
    Issued
  15. 2025-04-23 Salvage And Abatement Permit for DB-2025-01523. Issued separately.
    MVP Group Recycle Limited
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Hastings-Sunrise

3657 E Pender St
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in third floor mechanical closet. · Singh Development Ltd
2026-10-29
3661 E Pender St
To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey two-unit rear building with a no parking. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located under stairs to second floor. · Singh Development Ltd
2026-10-29
524 Kaslo St
524 Kaslo St Interior and exterior renovation to this existing single family dwelling on site. Kitchen renovation including millwork, flooring and new plumbing fixtures. replacement of Bay window in kitchen. New basement flooring. Okay for DB Field Review as per City staff · no contractor listed
2026-10-28
Something wrong on this page? Tell us and we'll check it against the City's records.