2366 Birch St, Vancouver

An address in Fairview, Vancouver, zoned FM-1 (Residential). 9 building permits are on file, most recently “To relocate and convert the existing one family dwelling (Character home) to a Multiple C…” (issued 29 November 2021). The City's 2026 assessed value for the 19 accounts at this address is $34,332,500.

Zoning
FM-1 · Residential
Neighbourhood
Fairview
Permits on file
9
Assessed value (2026)
$34,332,500
19 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 2366 Birch St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153133, 666 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
666
Households
385
Median age
41.6
Median household income (2020)
$90,000
Own their home
54%
Vancouver: 45%
Average household size
1.7
Under 15
8%
65 and over
16%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2021-11-29 To relocate and convert the existing one family dwelling (Character home) to a Multiple Conversion Dwelling (Building 3) containing 3 dwelling units as follows: 2 dwelling units (Rental) on the 2nd storey accessed from Birch St 1 dwelling unit on the combined 3rd, 4th and 5th storey accessed from W 8th Av Note: Refer to BP-2019-02443 for full scope of work of the entire development. This is a sloping site and the parking garage is the first storey. Stage 1 (excavation and shoring) issued - 14-Jan-2020 Stage 2 -(full structural and revision to excavation and shoring drawings to excavate and allow construction of P2) - issued 29-June-2021. Stage 3 (full permit) issued - 29-Nov-2021
    no contractor listed
    Issued
  2. 2021-11-29 To construct a multi-family dwelling Building 1 ( Building A) at the north side of this site containing 12 units: Level 1- five (5) single-level units Levels 2, 3 &4 - seven (7) three-level units with occupied roofs Refer to BP-2019-02443 for full scope of work of the entire development. Note: all units are accessible from Birch St. Stage 1 (excavation and shoring) issued - 14-Jan-2020. Stage 2 -(full structural and revision to excavation and shoring drawings to excavate and allow construction of P2) - issued 29-June-2021. Stage 3- Full Construction issued - 29-Nov-2021
    no contractor listed
    Issued
  3. 2021-11-29 This permit was issued for all site work and below grade facilities for the proposed development: To develop a 5 storey Multiple Dwelling complex over 1 level of common underground parking consisting of five buildings containing a total of 23 dwelling units as follows: - To construct a Multiple Dwelling (Building 1 / 2366 Birch St) containing 12 dwelling units (12 strata units) Refer to BP-2020-00037 - To relocate, convert and fully upgrade the existing Character Home to a Multiple Conversion Dwelling (Building 2 / 1269 W 8th Av) containing 3 dwelling units (1 strata unit and 2 Rental units) Refer to BP-2020-00038 - To relocate, convert and fully upgrade the existing Character Home to a Multiple Conversion Dwelling (Building 3 / 1285 W 8th Av) containing 3 dwelling units (1 strata unit and 2 Rental units) Refer to BP-2020-00039 - To relocate, convert and fully upgrade the existing Character Home to a Multiple Conversion Dwelling (Building 4 / 1295 W 8th Av) containing 3 dwelling units (1 strata unit and 2 Rental units) Refer to BP-2020-00040 - To construct a Multiple Dwelling (Building 5 / 1299 W 8th Av) containing 2 dwelling units (2 strata units) Refer to BP-2020-00041 Note: This is a sloping site and the parking garage is the first storey. Stage 1 (excavation and shoring) issued - 14-Jan-2020. Stage 2 -(full structural and revision to excavation and shoring drawings to excavate and allow construction of P2) - issued 29-June-2021. Stage 3- (full Construction) issued - 29- Nov-2021 · $10,000,000
    no contractor listed
    Issued
  4. 2020-08-07 Salvage and abatement permit only for DP-2018-00702 and to be completed under the supervision of a registered professional. This permit does not authorize demolition, deconstruction or construction work, and is to be completed under the supervision of a registered professional.
    Allaire Construction Inc
    Issued
  5. 2020-08-07 Salvage and abatement permit only for DP-2018-00702 and to be completed under the supervision of a registered professional. This permit does not authorize demolition, deconstruction or construction work, and is to be completed under the supervision of a registered professional.
    Allaire Construction Inc
    Issued
  6. 2020-02-24 Salvage and abatement permit only for DP-2018-00702 and to be completed under the supervision of a registered professional. This permit does not authorize demolition, deconstruction or construction work, and is to be completed under the supervision of a registered professional.
    Allaire Construction Inc
    Issued
  7. 2020-01-14 To construct a new residential building ( Building 5) containing two strata units: 1 dwelling unit on the 2nd storey 1 dwelling unit on the combined 3rd,4th & roof desk. Note: Refer to BP-2019-02443 for full scope of work of the entire development. This is a sloping site and the parking garage is the first storey. Stage 1 (excavation and shoring) issued - 14-Jan-2020 Stage 2 -(full structural and revision to excavation and shoring drawings to excavate and allow construction of P2) - issued 29-June-2021 Stage 3 ( full permit) issued - 29-Nov-2021 17-Feb-2023 BP Revision after DPMA -DP-2022-00413: - extend elevator to roof deck level on the building located at SW of property; - add steps and landing at the entry of 1299 W 8th Ave; - extend patio for 2396 Birch St, add planters along 1295 W 8th Ave and screen the patio retaining wall facing South property line.
    no contractor listed
    Issued
  8. 2020-01-14 To relocate and convert the existing one family dwelling (Character home) to a Multiple Conversion Dwelling (Building 4) containing 3 dwelling units as follows: 2 dwelling units (Rental) on the 2nd storey accessed from Birch St 1 dwelling unit on the combined 3rd, 4th and 5th storey accessed from W 8th Av Note: Refer to BP-2019-02443 for full scope of work of the entire development. This is a sloping site and the parking garage is the first storey. Stage 1 (excavation and shoring) issued - 14-Jan-2020 Stage 2 -(full structural and revision to excavation and shoring drawings to excavate and allow construction of P2) - issued 29-June-2021. Stage 3 (full permit) issued - 29-Nov-2021
    no contractor listed
    Issued
  9. 2020-01-14 To relocate and convert the existing one family dwelling (Character home) to a Multiple Conversion Dwelling (Building 2) containing 3 dwelling units as follows: 2 dwelling units (Rental) on the 2nd storey accessed from Birch St 1 dwelling unit on the combined 3rd, 4th and 5th storey accessed from W 8th Av Refer to BP-2019-02443 for full scope of work of the entire development. Stage 1 (excavation and shoring) issued- 14-Jan-2020. Stage 2 -(full structural and revision to excavation and shoring drawings to excavate and allow construction of P2) - issued 29-June-2021. Stage 3 ( full permit) issued - 29-Nov-2021.
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Fairview

555 W 12TH Av
Interior alterations to install turnstiles in this existing Fitness Center #299 on the 2nd floor of this existing Municipally Designated Heritage commercial building. Notes: 1. With the addition of new vestibule walls, make sure they do not impact any existing sprinkler heads. If any sprinkler existing heads are to be relocated, a special sprinkler inspection is required. 2. Permit reviewed and approved to VBBL #14343 (2025). · no contractor listed
2026-10-30
1750 W 2ND Av
401 - 1750 W 2ND AV Exterior and Interior alteration to provide residential improvements including the removal of existing patio covers and increasing the size patio on the fourth floor, at unit 401 - 1750 W 2ND AV at this multiple dwelling building on the site. Ok for new guard patio per City staff. Submission under VBBL 2025 · no contractor listed
2026-10-30
1665 W Broadway
#320 - 3rd Floor Interior alterations to provide improvements to this new office tenant on the 3rd floor (#320) of this existing commercial building on site. Scope of work: Construct 2 new private offices, new mllwork, kitchenette, electrical and plumbing work to suit. TENANT: BC Family Doctors Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Fusion Project Management Ltd
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.