Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
2250 Nanaimo St, Vancouver
An address in Hastings-Sunrise, Vancouver, zoned C-2A (Commercial). 7 building permits are on file, most recently “To construct a new 5-storey building including CRUs at the second storey, and residential…” (issued 9 September 2025). The City's 2026 assessed value for the 2 accounts at this address is $15,156,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153825, 731 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-09-09
To construct a new 5-storey building including CRUs at the second storey, and residential from the third to fifth storeys. There is an underground parkade. The building includes bike rooms, amenity room, and 38 residential units. VBBL 2019 - NFPA 13 Stage 1 - Excavation and Shoring issued on Mar. 18, 2025. Rev #1 (June 2, 2025) - Changes to shoring work and a change in CRP from Barry Weih (Outgoing - April 1, 2025) to David Echaiz-McGrath (Incoming - April 1, 2025). Stage 2 - Foundation to Grade issued on June 10, 2025. Stage 3 - Full Construction issued on Sept. 9, 2025. · $13,000,000
Matacan Construction Corp Issued -
2024-09-04
2258 Nanaimo St To demolish this existing single detached home (1983) building on site. Demolition Contractor: Fairway Demolition Ltd Related to: DP-2022-00898 BP-2023-01410 No Recycling required 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
Fairway Demolition Ltd Issued -
2024-09-04
2254 Nanaimo St. To demolish this existing single detached home (1958) building on site. Demolition Contractor: Fairway Demolition Ltd Related to: DP-2022-00898 No Recycling required 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
Fairway Demolition Ltd Issued -
2024-09-04
2250 Nanaimo St To demolish this existing single detached home (1951) use building on site. Demolition Contractor: Fairway Demolition Ltd Related to: DP-2022-00898 BP-2023-01410 No Recycling required 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
Fairway Demolition Ltd Issued -
2024-05-22
2258 Nanaimo St
Dicata Construction Ltd Issued -
2024-05-16
2254 Nanaimo St
Dicata Construction Ltd Issued -
2024-05-16
This permit is for salvage and abatement work only to this existing one family dwelling; to be completed under the supervision of a Qualified Professional. QP: Ramin Hamidnejad - Kinetic OHS Services Ltd Demolition Permit: BP-2023-01668 Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please upload all documents digitally signed and sealed related to S/A using the City's electronic permitting system as per BULLETIN 2015-008-EV.
Dicata Construction Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Hastings-Sunrise
To demolish to grade this existing Single Detached House (1927) on this site – declared rental. • This demolition permit also permits abatement work to be completed to WorkSafe standards. • This permit is subject to the Green Demolition Bylaw (11023) with a recycling requirement of 75% of non-hazardous construction materials. Note: Pre-1910 houses will need to salvage a minimum of 3 metric tonnes of wood. Demolition Contractor: GNA Contracting Ltd. (Onkar Singh Kular) QP: Pacific Ark Environmental Consulting Ltd. (Xiaoqiang (David) Yang) ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** · GNA Contracting Ltd2026-11-05
To construct a Multiple Dwelling “Multiplex” with a two-storey one-unit rear building with two carport parking spaces, having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in the courtyard, Interior component located in each storey · WALFORD HOMES INC.2026-11-05
To demolish to grade this existing Single Detached House (1932) on this site – declared non rental. • This demolition permit also permits abatement work to be completed to WorkSafe standards. • This permit is subject to the Green Demolition Bylaw (11023) with a recycling requirement of 90% of non-hazardous construction materials. Note: Pre-1910 houses will need to salvage a minimum of 3 metric tonnes of wood. Demolition Contractor: AJAC Construction & Excavation Inc. (Marie Dieno) QP: Coast BC Hazmat Inspections Inc. (Baraa Habash) ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** · Ajac Construction & Excavation Inc2026-11-05