Permit GopherAlberta and B.C. property, permit and zoning records

224 W 8th Av, Vancouver

An address in Mount Pleasant, Vancouver, zoned I-1 (Industrial). 9 building permits are on file, most recently “224 W 8th (Specifics: 234 W 8th) Interior alterations to change of use from Manufacturing…” (issued 4 June 2021). The City's 2026 assessed value for the 6 accounts at this address is $25,833,000.

Zoning
I-1 · Industrial
Neighbourhood
Mount Pleasant
Permits on file
9
Assessed value (2026)
$25,833,000
6 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 224 W 8th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154173, 895 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
895
Households
425
Median age
38.8
Median household income (2020)
$104,000
Own their home
47%
Vancouver: 45%
Average household size
1.8
Under 15
9%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2021-06-04 224 W 8th (Specifics: 234 W 8th) Interior alterations to change of use from Manufacturing Use to Wholesale Class B with ancillary office and to provide first tenant improvement in this vacant shell space in this existing mixed use building on this site OK for Field Review, per City staff · $30,000
    no contractor listed
    Issued
  2. 2020-06-08 #400 - To permit First Tenant Improvements to this existing Shell Space (#400) in this existing mixed use building on this site. Scope to include: Building new interior partition walls to create office space and electrical room, new lighting and electrical and new staff lounge. OK For Field Review per City staff.2020 Notes: 1. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. · $100,000
    Counterpoint Interiors Inc
    Issued
  3. 2020-04-24 #400 Interior alteration to demise #400 office unit into two offices with a corridor on 4th floor of this commercial building. Addressing notes: #400 & #490, 4th floor #400 has divided into 2 units, #490 has been assigned to the newly created space and #400 retained for the remainder space. #400 & #490 is to be posted as shown on the approved plans & clearly visible from the suite entry prior to final inspection. · $500,000
    Spire Construction Inc.
    Issued
  4. 2020-02-27 Interior alterations and a tenant improvement of an existing ground floor unit with mezzanine to include Production offices (no audience), Fitting/ Wardrobe rooms with supporting offices, washrooms and kitchen for this medium hazard industrial tenant. NOTE: this will be the first tenant in this vacant shell space. DB REQUIRED FOR THE CHANGE OF USE AS PER City staffmit application ** Stage 1: Full Construction tenant improvement permit. (Feb. 27, 2020. B. Smith) · $700,000
    Rendition Management & Construction Inc
    Issued
  5. 2020-02-26 Interior alterations & tenant improvements of the existing 5th floor to make use of the entire floor level as a single tenant office space. NOTE: this will be the first tenant in this vacant shell office space. NO DP REQUIRED AS PER City staff application. Stage 1: Full construction interior tenant improvement permit. (Feb. 26/20, B. Smith) · $400,000
    Humphries Construction Group Ltd
    Issued
  6. 2019-11-25 First interior TI alteration for 300 level single tenancy floor area with open work stations, boardrooms staff lunch/ kitchen with service spaces and washrooms, including supporting electrical, mechanical, plumbing and sprinkler service work. ** The 2014 VBBL applies to this permit ** NO DP REQUIRED AS PER City staff · $1,149,000
    CE Miles Construction Ltd
    Issued
  7. 2018-06-14 Excavate and place shoring, and construct two levels of below grade parking with drain tile installation and a 5 storey building for manufacturing and offices. This is a permit for the "shell" building and future tenant improvement permits will be required. (1st & 2nd storey are interconnected). · $7,844,000
    Rendition Management & Construction Inc
    Issued
  8. 2018-06-05 To demolish this existing commercial building on this site. ($65,000.00) OK for SIPS per City staff: BP-2018-00601 (Salvage & Abatement), DP-2017- Note: 1) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $65,000
    Matcon Demolition Ltd
    Issued
  9. 2018-03-14 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing commercial building. OK for SIPS per City staff · $150,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Mount Pleasant

523 E 10TH Av
To construct a 20-storey mixed-use building (176 secured market rental units) consisting of: 1st storey - child care facility (shell only); rental office; co-work space 2nd to 19th storeys - dwelling units; indoor & outdoor amenities on Level 2 20th storey - indoor & outdoor amenities all over 2 levels of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required. STAGED CONSTRUCTION STAGE I: Excavation & Shoring; Foundation up to Grade; Revisions to the Building’s Interior and Exterior per City staff(S.Yoo) ISSUED: Nov. 3, 2026 REVISION I: Change of General Contractor - In review STAGE II: Full Construction - In review · ITC BC BUILDERS INC.
2026-11-03
1255 E 15TH Av
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed
2026-10-30
95 E 15TH Av
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.