Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
2235 E Broadway, Vancouver
An address in Grandview-Woodland, Vancouver, zoned CD-1 (762) (Comprehensive Development). 13 building permits are on file, most recently “Construction of a new 6-storey wood-frame multi-family residential building consisting of…” (issued 10 February 2022). The City's 2026 assessed value for the 82 accounts at this address is $66,100,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153821, 418 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2022-02-10
Construction of a new 6-storey wood-frame multi-family residential building consisting of 81 strata-titled units above a 2-storey underground parking garage. · $22,164,000
Syncra Construction Corp Issued -
2021-09-16
To demolish this one family dwelling building to grade by deconstruction 75% recycling is required Ok for SIPs per City staff: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $26,000
Hans Demolition and Excavating Ltd. Issued -
2021-09-13
To demolish this one family dwelling building to grade by deconstruction 75% recycling is required Ok for SIPs per City staff: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $26,000
Hans Demolition and Excavating Ltd. Issued -
2021-09-10
To demolish this one family dwelling building to grade by deconstruction 75% recycling is required Ok for SIPs per City staff: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $26,000
Hans Demolition and Excavating Ltd. Issued -
2021-09-10
To demolish this existing one family dwelling building to grade. 75% recycling is required Ok for SIPs per City staff: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $26,000
Hans Demolition and Excavating Ltd. Issued -
2021-09-07
To demolish this one family dwelling building to grade by deconstruction 75% recycling is required Ok for SIPs per City staff: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $26,000
Hans Demolition and Excavating Ltd. Issued -
2021-08-27
To demolish this one family dwelling building to grade by deconstruction 75% recycling is required Ok for SIPs per City staff: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $26,000
Hans Demolition and Excavating Ltd. Issued -
2021-05-07
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. Related BP-2021-00889 To demolish this one family dwelling building to grade by deconstruction QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
Hans Demolition and Excavating Ltd. Issued -
2021-05-07
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. Related BP-2021-00884 To demolish this one family dwelling building to grade by deconstruction QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
Hans Demolition and Excavating Ltd. Issued -
2021-05-07
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. Related BP-2021-00882 To demolish this one family dwelling building to grade by deconstruction QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
Hans Demolition and Excavating Ltd. Issued -
2021-05-07
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. Related BP-2021-00877 To demolish this one family dwelling building to grade by deconstruction QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
Hans Demolition and Excavating Ltd. Issued -
2021-05-07
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. Related BP-2021-00875 To demolish this one family dwelling building to grade by deconstruction QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
Hans Demolition and Excavating Ltd. Issued -
2021-05-07
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. Related BP-2021-00871 To demolish this one family dwelling building to grade by deconstruction QP is Tarlochan (Terry) Sunar of MCA Environmental Consulting Inc. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [contact removed]
Hans Demolition and Excavating Ltd. Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Grandview-Woodland
#302 2320 TRINITY ST Interior alterations to provide improvements to this unit #302 on 3RD floor of this existing multiple dwelling building on this site. Project scope: Kitchen and bathroom reno Okay for DTI as per City staff · Modern Star Contracting Ltd2026-10-30
To construct a 19-storey mixed-use building (191 social housing units) consisting of: 1st storey - 2 CRUs; 7 live/work artist studios (Class A); indoor amenity 2nd to 18th storeys - dwelling units; indoor & outdoor amenities on Levels 4 & 7 19th storey - indoor & outdoor amenities all over 2 levels of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of the 2025 VBBL. 2. A radio antenna system is required. STAGED CONSTRUCTION STAGE I: Excavation and Shoring (S.Yoo) ISSUED: Oct. 22, 2026 · Chandos Construction2026-10-22
#204-2244 MCGILL ST Interior alteration toto provide improvements to this existing residential unit #204 on 2nd floor in this existing multiple dwelling building on this site. Scope of work includes: removing of drywall to install wardrobe Okay for DTI as per City staff · no contractor listed2026-10-20