This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
220 E 6th Av, Vancouver
An address in Mount Pleasant, Vancouver, zoned CD-1 (844) (Comprehensive Development). 7 building permits are on file, most recently “Interior alterations to allow salvage of non-structural building components prior to or d…” (issued 22 January 2025). The City's 2026 assessed value is $16,967,700.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153164, 2,058 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-01-22
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this commercial building; to be completed under the supervision of a Qualified Professional. Related to demolition permit BP-2024-04472. Issued separately. Related to DP-2021-01012 Related to BP-2022-05419 QP: Enviro-Vac (division of Paragon Remediation Group) Emma Gibson 60-513-1325
MWL Demolition Ltd Issued -
2024-04-22
Rcvd. Permit Withdrawal Request Form ; see email in docs. 11-Sep-2025. tn To develop an eight-storey (six-storey per planning) mixed-use building consisting of: 1st & 2nd storeys - 4 CRUs (SHELL): retail, restaurant, general office & healthcare office, 3 TownHomes 2nd to 7th storeys - 73 residential units 8th storey - amenity room and deck & private roof decks, all over two levels of underground parking levels. Note: This building contains 76 residential units in total. This building is equipped with a radio antenna system. 23-Apr-2024 - Full Permit issued. · $37,000,000
Graham Construction and Engineering LP Issued -
2022-09-26
Interior and exterior alterations and a temporary (1 year) change of occupancy from Automotive repair (F2) to temporary sales office (D) to this existing one storey commercial building. Change of occupancy is time limited to February 28, 2025 and is to revert back to previous F2 occupancy. Separate permits not required for exterior patio as per City staff per City stafft and moving the exterior patio east by 4' resulting in the loss of one parking stall - accepted Jan.20/23 Revision #2 - to extend the temporary change of occupancy to February 28, 2025. - accepted June 27/25 · $1,800,000
no contractor listed Issued -
2022-06-16
To demolish this existing 3-storey building to grade only (1945) - NO GREEN DEMO REQUIRED Demo Contractor: Wendy Litchfield - MWL Demolition Ltd Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." · $210,895
MWL Demolition Ltd Issued -
2022-06-16
To demolish the pre-fabricated, one-storey commercial building (1996) on this site - NO GREEN DEMO REQUIRED - Work to retain the existing parking foundation structure. Demo Contractor: Wendy Litchfield - MWL Demolition Ltd Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver."\t · $210,895
MWL Demolition Ltd Issued -
2022-03-23
S&A Interior alteration to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing pre-fabricated, one-storey commercial building Related to demo permit BP-2021-06670
MWL Demolition Ltd Issued -
2022-03-22
S&A Interior alteration to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing 3-storey building. Related to demo permit BP-2021-06672
MWL Demolition Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Mount Pleasant
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed2026-10-30
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.2026-10-30
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes2026-10-16