2120 Cambie St, Vancouver

An address in Mount Pleasant, Vancouver, zoned C-3A (Commercial). 7 building permits are on file, most recently “Interior alterations to modernize elevators #4 & #5 in accordance to category 3 of the VB…” (issued 9 June 2026). The City's 2026 assessed value is $63,982,000.

Zoning
C-3A · Commercial
Neighbourhood
Mount Pleasant
Permits on file
7
Assessed value (2026)
$63,982,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 2120 Cambie St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154173, 895 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
895
Households
425
Median age
38.8
Median household income (2020)
$104,000
Own their home
47%
Vancouver: 45%
Average household size
1.8
Under 15
9%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-06-09 Interior alterations to modernize elevators #4 & #5 in accordance to category 3 of the VBBL Bulletin 2018-004-BU/EL and B44-16 at this existing commercial building on this site. Main recall level: 1st storey Alternate recall level:2nd storey Existing two-stage FAS Notes: 1. Schedules submitted: B (Arch & Elect) 2. Permit reviewed and issued to VBBL #14343 (2025) · $545,788
    Action Electric Ltd
    Issued
  2. 2025-09-05 Interior alterations to perform elevator modernization (elevator #2 and #3) to meet the requirement of CSA B44 standard at this existing 7 storeys over 3 levels of underground parking VPD (office) building on this site. Main recall level: Ground floor Alternate recall level: Level 2 Existing single stage FAS Scope of Work: -Retain existing smoke and heat detectors -Retain existing fire alarm control and annunciator panel -Connection of the fire alarm system to provide elevator recall BRB review notes: Permit reviewed and approved to VBBL #12511 (2019) · $813,580
    no contractor listed
    Issued
  3. 2023-10-30 Interior Alterations to provide improvements to the 4th level of the existing civic building (police station) on this site. Scope: To expand the existing locker room and alter the interior layout of this floor. OK to process as DTI per City staff · $100,000
    Scott Special Projects Ltd
    Issued
  4. 2021-02-23 To permit interior alterations to the main floor lobby of this existing civic building (police station) on this site. Scope to Include: Modify the layout of the existing finger printing room, and updates to mechanical and electrical. OK For Field Review per City staff.2020 · $90,000
    no contractor listed
    Issued
  5. 2019-11-21 Interior alterations to provide improvements to the 2nd and 3rd floors of this existing civic building (police station) by relocating partition walls. · $14,000
    no contractor listed
    Issued
  6. 2019-07-18 2120 Cambie St - 2nd & 3rd floors Interior alterations to remove interior partition walls, glazing and doors on the 2nd and 3rd floor of this existing office building on this site. TENANT: Vancouver Police Department OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) NOTE: Building sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. · $14,000
    no contractor listed
    Issued
  7. 2019-03-18 Field Review To replace the existing air-conditioning cooling tower with new on the rooftop well in this existing commercial building on this site. OK for field review as per City staff: · $225,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Mount Pleasant

523 E 10TH Av
To construct a 20-storey mixed-use building (176 secured market rental units) consisting of: 1st storey - child care facility (shell only); rental office; co-work space 2nd to 19th storeys - dwelling units; indoor & outdoor amenities on Level 2 20th storey - indoor & outdoor amenities all over 2 levels of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required. STAGED CONSTRUCTION STAGE I: Excavation & Shoring; Foundation up to Grade; Revisions to the Building’s Interior and Exterior per City staff(S.Yoo) ISSUED: Nov. 3, 2026 REVISION I: Change of General Contractor - In review STAGE II: Full Construction - In review · ITC BC BUILDERS INC.
2026-11-03
1255 E 15TH Av
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed
2026-10-30
95 E 15TH Av
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.