Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1986 Stainsbury Av, Vancouver
An address in Kensington-Cedar Cottage, Vancouver, zoned CD-1 (758) (Comprehensive Development). 9 building permits are on file, most recently “To construct a 6-storey combustible residential building under the Moderate Income Rental…” (issued 12 August 2022). The City's 2026 assessed value is $39,365,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150422, 896 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2022-08-12
To construct a 6-storey combustible residential building under the Moderate Income Rental Housing Pilot Program (MIRHPP). The proposed development will consist of 6 storeys in the building height, all over one level of underground non-combustible parkade. The building will be fully sprinkled and monitored by a fire alarm system. VBBL 2019 - NFPA 13 - Reviewed during 2020/21 Pandemic. Stage 1 - Excavation and Shoring issued on June 23, 2021. Stage 2 - Full Structure only issued on Sept. 17, 2021. Stage 3 - Full Construction issued on Aug. 12, 2022. Revision #1 (Jan. 8, 2024) - Exterior and interior changes and revised location of the Trench Drain at the parkade level. Work includes but is not limited to (see Arch change letter): Door swing and door changes, rooftop guardrails, relocation of mech equipment, revised roof assemblies, etc. · $15,074,326
Trillium Project Management Ltd Issued -
2021-03-24
To demolish the existing one-family dwelling building. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $18,800
MVP Group Recycle Limited Issued -
2021-03-24
To demolish the existing one-family dwelling building by voluntary deconstruction. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $18,800
MVP Group Recycle Limited Issued -
2021-03-09
To demolish the existing one-family dwelling building. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $18,800
MVP Group Recycle Limited Issued -
2021-03-09
To demolish by deconstruction this existing one-family dwelling building. This building has been assessed as being a non-character pre 1950 house and as such 75% of the demolition material must be recycled or reused. "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. · $18,800
MVP Group Recycle Limited Issued -
2021-01-15
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling building.
MVP Group Recycle Limited Issued -
2021-01-15
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling building.
MVP Group Recycle Limited Issued -
2021-01-15
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling building.
MVP Group Recycle Limited Issued -
2021-01-15
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling building.
MVP Group Recycle Limited Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Kensington-Cedar Cottage
847 E 22nd Avenue Exterior and Interior alterations to add additional area on the main floor and convert the ground floor to a secondary suite at this existing single detached house on this inside with no lane site. No off street parking required. Okay for field review as per City staff · no contractor listed2026-11-02
To construct a two storey, three-unit dwelling unit with an attached carport 'Multiplex'. Refer to BP-2025-04338 for Building 1 and site work. BRB Notes: 1. Reviewed under 2025 VBBL 2. Building sprinklered to Modified NFPA 13R 3. Part 5 Design 4. Attached carport complying with 9.10.15.4(11)(a) through (d) · no contractor listed2026-11-02
To construct a Multiple Dwelling "Multiplex" with three storey, two dwelling units for Bldg 1, and two storey, three-unit with an attached carport, for a total of 2 buildings and 5 units on this site. This permit is for the site project work and construction of Bldg 1 (BP-2025-04338). Bldg 1 (& site project work) BP-2025-04338 - East - 2 DU Bldg 2 - BP-2025-04339 - West - 3 DU BRB Notes: 1. Reviewed under 2025 VBBL 2. Building sprinklered to NFPA 13D 3. Part 5 Design · Modern Styles Home Ltd2026-11-02